User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:20, 14 July 2021 diff hist +73 m Category:1180 Bituminous Stockpile Patching Material
- 10:30, 14 July 2021 diff hist +1,280 m Main Page Per EPS and CCO, added disclaimer verbiage
- 09:25, 13 July 2021 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.3.24, TEAP Program Application
- 09:22, 13 July 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 09:21, 13 July 2021 diff hist 0 N File:Fig.136.3.24 2021.docx current
- 09:21, 13 July 2021 diff hist 0 m LPA:136.3 Federal Aid Basics Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 08:16, 13 July 2021 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, minor clarification related to CUF Determination Form
- 12:52, 7 July 2021 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) updated links for RW Plans checklist
- 12:50, 7 July 2021 diff hist 0 N File:124.2.4 Check List for RW Plans.docx current
- 12:50, 7 July 2021 diff hist -34 m Category:101 Standard Forms →Checklist: updated link to Right of Way Check List
- 12:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 12:46, 7 July 2021 diff hist -86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 12:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx
- 12:45, 7 July 2021 diff hist -43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 12:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA)
- 12:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 12:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx current
- 12:38, 7 July 2021 diff hist -45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 12:36, 7 July 2021 diff hist -1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 12:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 12:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx current
- 12:31, 7 July 2021 diff hist -40 m Category:101 Standard Forms →Checklist: updated link
- 12:23, 7 July 2021 diff hist -49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 12:13, 7 July 2021 diff hist -99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 12:09, 7 July 2021 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 12:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf
- 12:04, 7 July 2021 diff hist -49 m Category:101 Standard Forms →Checklist: updated D-12 link
- 13:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 12:39, 2 July 2021 diff hist -4 m 236.13 Designing Right of Way Plans inclusive language
- 12:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language
- 12:23, 2 July 2021 diff hist -5 m 236.13 Designing Right of Way Plans
- 12:03, 2 July 2021 diff hist +1 m 238.4 Construction Surveying Inclusive language
- 11:39, 2 July 2021 diff hist +18 m 236.3 Administration inclusive laguage
- 12:06, 1 July 2021 diff hist +130 m Recent Policy Changes in the EPG EPG 1040.4
- 11:59, 1 July 2021 diff hist +94 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.4 Crashworthy End Terminal and Qualified Plastic Guardrail Block
- 13:53, 30 June 2021 diff hist +233 m Recent Policy Changes in the EPG EPG 751.6 and EPG 751.50
- 12:19, 30 June 2021 diff hist +849 m 751.6 General Quantities Per BR, clarified guidance about System I finish field coat
- 10:16, 30 June 2021 diff hist +650 m 751.50 Standard Detailing Notes →A4a. Structural Steel Protective Coatings: Per BR, provided additional options for System I structural steel protective coatings.
- 06:56, 30 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 30 2021.xlsx
- 06:55, 30 June 2021 diff hist 0 N File:751.1.2.18.2 Highway Grade Separation.docx current
- 06:55, 30 June 2021 diff hist +7 m 751.1 Preliminary Design Per BR, updated links to "Highway Grade Separation (Minor Route over Major Route)" and "Request for Final Soundings for Structures Form"
- 06:24, 30 June 2021 diff hist +15 m 748.7 Bridge Deck and Bridge End Drainage →748.7.4 Bridges on a Minor or Low Volume Route: Per BR, minor clarification
- 13:36, 29 June 2021 diff hist 0 N File:751.1.2.19 Guidance Jun 2021.xlsx
- 13:35, 29 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 2021.xlsx
- 13:34, 29 June 2021 diff hist 0 m 751.1 Preliminary Design Per BR, minor updates for "Guidance for Request for Final Soundings for Structures Form" and "Request for Final Soundings for Structures Form"
- 09:46, 29 June 2021 diff hist -2 m 748.7 Bridge Deck and Bridge End Drainage →748.7.3 Bridges on a Major Route
- 09:42, 29 June 2021 diff hist +14 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 09:23, 29 June 2021 diff hist +2 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, minor clarification
- 07:10, 29 June 2021 diff hist -3 m 751.37 Drilled Shafts →Commentary on EPG 751.37.1 General
- 07:09, 29 June 2021 diff hist -28 m 751.38 Spread Footings Per BR, minor clarifications current