User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:14, 21 July 2021 diff hist +3 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.88 Screens (MUTCD 6F.88)
- 13:13, 21 July 2021 diff hist +267 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per EPS, linked new NJSP for a radar speed advisory system to renamed "Radar Speed Advisory System" (formerly "Radar Speed Advisory Assembly")
- 10:14, 21 July 2021 diff hist -1,564 m Recent Policy Changes in the EPG EPG 903.4.8 and EPG 903.4.9
- 10:11, 21 July 2021 diff hist +2,394 m 903.4 Overhead Sign Mounting Per BR and TS, in EPG 903.4.8 and .9, expanded and updated guidance for handling bridge sign attachments to current established practice. References to wall-mounted structures removed from EPG 903.4.8 and .9
- 15:09, 19 July 2021 diff hist +39 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per CM, updated link to SWPPP Form 806.8.2
- 15:07, 19 July 2021 diff hist +135 m Category:101 Standard Forms Per CM, updated links to SWPPP Form 806.8.2 and added new Non-Conformance Report (NCR) form in EPG 101
- 11:20, 16 July 2021 diff hist +68 m Help Article →EPG Approval Process
- 11:18, 16 July 2021 diff hist -65 m Help Article →EPG Approval Process
- 11:15, 16 July 2021 diff hist +2 m Help Article →EPG Ballot Cycles: updated ballot calendar
- 10:46, 16 July 2021 diff hist +51 m Recent Policy Changes in the EPG EPG 903.7.49
- 10:39, 16 July 2021 diff hist +445 m 903.7 Conventional Road Guide Signs →903.7.49 Community Wayfinding Signs (MUTCD Section 2D.50): Per TS, as a convenience to cities, provided a simplified document, "Key Wayfinding Requirements"
- 10:05, 16 July 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Jul 2021.xlsx current
- 10:04, 16 July 2021 diff hist 0 m 606.1 Guardrail Per Charles Schumann, updated Length of Need Calculator by removing wording associated with cautions and warnings as well as other minor revisions.
- 13:55, 15 July 2021 diff hist +50 m Recent Policy Changes in the EPG EPG 236.4.7.2
- 13:23, 15 July 2021 diff hist +325 m 236.4 Description Writing and Titles →236.4.7.2 Quitclaim Deed (to the Commission): Per RW, clarified guidance about the determination and documentation of when the release of tenant interest is required
- 08:23, 15 July 2021 diff hist -120 m Recent Policy Changes in the EPG EPG 146
- 07:38, 15 July 2021 diff hist +158 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per ECR, updated material supplier CUF frequency to every 30 days, regardless of DBE activity
- 07:34, 15 July 2021 diff hist -29 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: removed archaic bulldozer symbol
- 12:20, 14 July 2021 diff hist -73 Category:1180 Bituminous Stockpile Patching Material
- 12:20, 14 July 2021 diff hist 0 N File:903.7.49 Key Wayfinding.pdf current
- 12:20, 14 July 2021 diff hist +73 m Category:1180 Bituminous Stockpile Patching Material
- 11:30, 14 July 2021 diff hist +1,280 m Main Page Per EPS and CCO, added disclaimer verbiage
- 10:25, 13 July 2021 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.3.24, TEAP Program Application
- 10:22, 13 July 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 10:21, 13 July 2021 diff hist 0 N File:Fig.136.3.24 2021.docx current
- 10:21, 13 July 2021 diff hist 0 m LPA:136.3 Federal Aid Basics Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 09:16, 13 July 2021 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, minor clarification related to CUF Determination Form
- 13:52, 7 July 2021 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) updated links for RW Plans checklist
- 13:50, 7 July 2021 diff hist 0 N File:124.2.4 Check List for RW Plans.docx current
- 13:50, 7 July 2021 diff hist -34 m Category:101 Standard Forms →Checklist: updated link to Right of Way Check List
- 13:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 13:46, 7 July 2021 diff hist -86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 13:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx
- 13:45, 7 July 2021 diff hist -43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 13:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA)
- 13:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 13:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx current
- 13:38, 7 July 2021 diff hist -45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 13:36, 7 July 2021 diff hist -1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 13:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 13:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx current
- 13:31, 7 July 2021 diff hist -40 m Category:101 Standard Forms →Checklist: updated link
- 13:23, 7 July 2021 diff hist -49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 13:13, 7 July 2021 diff hist -99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 13:09, 7 July 2021 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 13:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf
- 13:04, 7 July 2021 diff hist -49 m Category:101 Standard Forms →Checklist: updated D-12 link
- 14:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 13:39, 2 July 2021 diff hist -4 m 236.13 Designing Right of Way Plans inclusive language
- 13:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language