User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:46, 17 December 2021 diff hist +5 m 127.9 Floodplain Management →127.9.3.3 Responsibilities: updating broken BR division link
- 15:44, 17 December 2021 diff hist -14 m 131.1 Design Exception Process →131.1.4 The Design Exception Process: updating broken BR division link
- 15:42, 17 December 2021 diff hist +3 m 616.11 Traffic Control for Waterways →616.11.1 Guidelines for Determining the Need for Work Zone Control: updating broken BR division link current
- 15:41, 17 December 2021 diff hist +6 m 903.22 Material Inspection for Sec 903 updating BR division links current
- 15:39, 17 December 2021 diff hist +3 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): Updating broken BR division link current
- 14:55, 17 December 2021 diff hist -9 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2)
- 14:27, 17 December 2021 diff hist -4,193 m Category:110 State and Federal Wage Rates and Other Requirements Per CM and ECR, deleted listing of required posters and packets to be displayed at project site. Reader is directed to MoDOT's contractor resources website.
- 13:19, 17 December 2021 diff hist +54 m Recent Policy Changes in the EPG EPG 751.24.2.1, EPG 751.50
- 11:55, 17 December 2021 diff hist +2,079 m 751.50 Standard Detailing Notes Per BR, numerous notes updated to reflect that, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 11:47, 17 December 2021 diff hist +1,450 m 751.24 Retaining Walls →751.24.2.1 Design: Per BR, in lieu of using pipe pile spacers, the contractor will have the option to use pile jackets for bridges up to 200 feet long.
- 13:50, 16 December 2021 diff hist -42 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:46, 16 December 2021 diff hist 0 N File:237.9.3 Due Date Calendar.pdf current
- 13:45, 16 December 2021 diff hist +19 m 237.6 Project Estimates Per Bidding and Estimates, updated links to PS&E chart and calendar.
- 13:39, 16 December 2021 diff hist 0 N File:237.9.3 PS&E Due Date Chart.pdf current
- 13:38, 16 December 2021 diff hist -267 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Estimates, updated links to PS&E chart and calendar. Deleted reference to consultants' version of this information
- 14:19, 15 December 2021 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 14:14, 15 December 2021 diff hist +17 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 08:30, 15 December 2021 diff hist +963 m 751.40 LFD Widening and Repair →751.40.2.3.2 Bent Cap Shear Strengthening using FRP Wrap
- 15:49, 14 December 2021 diff hist -54 m Recent Policy Changes in the EPG EPG 909
- 15:38, 14 December 2021 diff hist +230 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Work Zone Transportation Management Plan: Per TS, added info associated with the WZ Management Guidebook
- 15:25, 14 December 2021 diff hist 0 N File:909 WZM Presentation.pdf current
- 15:25, 14 December 2021 diff hist 0 N File:909 WZM Guidebook.pdf current
- 15:25, 14 December 2021 diff hist +610 m Category:909 Transportation Systems Management and Operations (TSMO) →909.2 Nonrecurring Congestion: Per TS, added "WZ Management Guidebook" and associated references.
- 13:17, 14 December 2021 diff hist 0 N File:101 404 Permit.dotx current
- 13:16, 14 December 2021 diff hist -50 m Category:101 Standard Forms →Bridge: Per Env'l, updated 404 Permit from .dot file to .dotx
- 11:18, 14 December 2021 diff hist 0 m 121.7 Program Estimates
- 09:44, 14 December 2021 diff hist 0 N File:104.7 EngFac SFY 19 to 21.pdf current
- 09:44, 14 December 2021 diff hist -12 m 121.7 Program Estimates
- 09:44, 14 December 2021 diff hist +71 m 121.7 Program Estimates Per TP, updated Engineering Factors Report to SFY 2019 - 2021
- 08:23, 14 December 2021 diff hist -4 m Category:101 Standard Forms →Construction and Materials
- 15:37, 13 December 2021 diff hist -2 m 903.9 General Information Signs →903.9.5.1 Corridor Designations: updated link
- 12:09, 13 December 2021 diff hist -6 m Recent Policy Changes in the EPG
- 10:55, 13 December 2021 diff hist -509 m 127.29 Stormwater →127.29.4.5 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment
- 10:34, 13 December 2021 diff hist +111 m 127.29 Stormwater →127.29.4.5 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment
- 10:21, 13 December 2021 diff hist -459 m Category:101 Standard Forms →Materials: Per CM, deleted archaic .dot forms : "Hazardous Waste Removal Bid Information", "Itemized Proposal - Demolition, Asbestos, UST Removal", "Materials Suppliers, Source and Location"
- 09:56, 13 December 2021 diff hist +220 m 127.29 Stormwater →127.29.4.5 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment
- 09:37, 13 December 2021 diff hist +590 m Recent Policy Changes in the EPG EPG 127.29, EPG 173.2.1, EPG 771.2, EPG 806.8.4
- 09:08, 13 December 2021 diff hist -23 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.4 Site Inspections and Reports: Per Env'l, a routine inspection may be delayed until the next business day if it falls on a holiday
- 08:48, 13 December 2021 diff hist -75 m 771.2 Bridge Cleaning and Flushing →Procedures: Per Env'l, guidance updated to reflect the new permit cycle, particularly the obligations of the new comprehensive permit obligations of the TS4. Generally, the changes to the permit do not alter MoDOT's overall stormwater or land disturbance program. current
- 14:48, 10 December 2021 diff hist +111 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.4 Site Inspections and Reports: Per Env'l, a routine inspection may be delayed until the next business day if it falls on a holiday
- 14:45, 10 December 2021 diff hist +149 m Category:173 Erosion Control for Maintenance Operations →173.2 Slide Detection and Repair: Per Env'l, updated and expanded to reflect the new permit cycle, particularly the obligations of the new comprehensive permit obligations of the TS4. Generally, the changes to the permit do not alter MoDOT's overall stormwater or land disturbance program.
- 14:43, 10 December 2021 diff hist -1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: updated link
- 14:41, 10 December 2021 diff hist +3 m 127.25 Maintenance Environmental Policies →127.25.8.3.2 System Attachments by Others: updated link
- 14:40, 10 December 2021 diff hist -50 m Category:129 Public Involvement →129.11 Public Involvement for Storm Water
- 14:40, 10 December 2021 diff hist -2 m Category:129 Public Involvement →129.11 Public Involvement for Storm Water: updated link
- 14:38, 10 December 2021 diff hist 0 N File:127.29.4.1.jpg current
- 14:38, 10 December 2021 diff hist 0 N File:127.29.3.5.jpg current
- 14:36, 10 December 2021 diff hist 0 N File:127.29.4.5 Proprietary Structural BMPs.pdf current
- 14:36, 10 December 2021 diff hist 0 N File:127.29.4.5 Wet Detention Basin.pdf current
- 14:35, 10 December 2021 diff hist 0 N File:127.29.4.5 Bioretention Baisn.pdf current