User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:17, 14 February 2022 diff hist +14 m Recent Policy Changes in the EPG EPG 751.1.3.4, EPG 751.12.1.3, EPG 751.12.2
- 13:08, 14 February 2022 diff hist +213 m 751.12 Barriers, Railings, Curbs and Fences Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 12:56, 14 February 2022 diff hist +1,093 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 08:48, 14 February 2022 diff hist -77 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor deletion associated with previous revision
- 08:21, 10 February 2022 diff hist +19 m Recent Policy Changes in the EPG EPG 616.13.2
- 07:37, 10 February 2022 diff hist -37 m 147.3 Job Order Contracting (JOC) →147.3.11 Request to Subcontract Work (Form C-220): Per CM, updated guidance to reflect that as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
- 14:52, 9 February 2022 diff hist 0 N File:616.13.2 Directions 2021.pdf current
- 14:51, 9 February 2022 diff hist 0 N File:616.13 WZ Impact 2022.xlsm current
- 14:51, 9 February 2022 diff hist +530 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: Per TS, new version of the Work Zone Impact Analysis Spreadsheet and spreadsheet directions as well as adding in the smart work zone information.
- 13:38, 9 February 2022 diff hist +59 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: inserted link
- 13:00, 9 February 2022 diff hist +2 m 237.8 Contract Time
- 12:51, 9 February 2022 diff hist +2 m 237.9 Submission of Plans and Supporting Documents updated Word Day Study to a dotx file
- 12:50, 9 February 2022 diff hist -445 m Category:124 Quality Control / Quality Assurance (QC/QA) Per DE, deleted references to archaic Project Estimate Quality Assurance Report; also updated Work Day Study to a .dotx file
- 12:46, 9 February 2022 diff hist -6 m Category:101 Standard Forms →Design Forms
- 12:45, 9 February 2022 diff hist 0 N File:124 Work Day Study a.dotx current
- 12:45, 9 February 2022 diff hist +2 m Category:101 Standard Forms →Design Forms
- 12:43, 9 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms
- 12:41, 9 February 2022 diff hist 0 N File:124 Work Day Study.dotx current
- 12:41, 9 February 2022 diff hist -43 m 237.8 Contract Time updated archaic dot form to dotx
- 08:33, 9 February 2022 diff hist -280 m Recent Policy Changes in the EPG EPG 242.2
- 08:23, 9 February 2022 diff hist +88 m Category:242 Optional and Alternate Pavement Designs →242.2 Life Cycle Cost Adjustment (LCCA) Factor: Per Bidding, the calculation of the LCCA was clarified
- 15:27, 8 February 2022 diff hist +1 m Category:910 Intelligent Transportation Systems →910.2 How ITS Works
- 12:45, 8 February 2022 diff hist -412 m Category:910 Intelligent Transportation Systems Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909
- 11:06, 8 February 2022 diff hist +289 m Category:909 Transportation Systems Management and Operations (TSMO) Per TS, moved Transportation Systems Management and Operations (TSM&O) Program and Action Plan link to EPG 909 from EPG 910
- 08:23, 8 February 2022 diff hist +12 m Recent Policy Changes in the EPG EPG 238.2
- 08:14, 8 February 2022 diff hist 0 N File:238.2 Exhibit A.docx current
- 08:14, 8 February 2022 diff hist -59 m 238.2 Land Surveying Per CADD Survey, minor update of Legal Description - Exhibit A to replace the term “Legal” with “Property” to comply with Code State Regulation for surveying.
- 15:01, 7 February 2022 diff hist -30 m 237.9 Submission of Plans and Supporting Documents updated archaic dot file form link to pdf file
- 14:37, 7 February 2022 diff hist 0 N File:101 Utilities Checklist.dotx current
- 14:37, 7 February 2022 diff hist 0 N File:101 Traffic Checklist.dotx current
- 14:36, 7 February 2022 diff hist 0 N File:101 Right of Way Checklist.dotx current
- 14:36, 7 February 2022 diff hist 0 N File:101 Railroad Checklist.dotx current
- 14:36, 7 February 2022 diff hist 0 N File:101 Public Information and Outreach Checklist.dotx current
- 14:36, 7 February 2022 diff hist 0 N File:101 Planning Checklist.dotx current
- 14:35, 7 February 2022 diff hist 0 N File:101 Maintenance Checklist.dotx current
- 14:35, 7 February 2022 diff hist 0 N File:101 FHWA Checklist.dotx current
- 14:35, 7 February 2022 diff hist 0 N File:101 Construction and Materials Checklist.dotx current
- 14:34, 7 February 2022 diff hist 0 N File:101 Bridge Checklist.dotx current
- 14:34, 7 February 2022 diff hist -447 m Category:101 Standard Forms →Scoping: updated archaic .dot files to .dotx
- 12:41, 7 February 2022 diff hist 0 N File:101 Public Hearing Statement Form.dotx current
- 12:40, 7 February 2022 diff hist -49 m Category:101 Standard Forms →Public Involvement: updated archaic .dot file to .dotx
- 12:24, 7 February 2022 diff hist 0 N File:101 Turning Movement Traffic Count Request.dotx current
- 12:24, 7 February 2022 diff hist 0 N File:101 Fis Formc.dotx current
- 12:23, 7 February 2022 diff hist 0 N File:101 Conceptual Study Traffic Count Request.dotx current
- 12:23, 7 February 2022 diff hist 0 N File:101 ARAN Report Request.dotx current
- 12:23, 7 February 2022 diff hist +16 m Category:101 Standard Forms →Planning: updated archaic .dot files to .dotx
- 11:25, 7 February 2022 diff hist 0 N File:101 Soil Survey Request.dotx current
- 11:24, 7 February 2022 diff hist 0 N File:101 Soil Info Request.dotx current
- 11:24, 7 February 2022 diff hist 0 N File:101 Request for Asphalt Cement % Grade.dotx current
- 11:23, 7 February 2022 diff hist +10 m Category:101 Standard Forms →Materials: updated archaic .dot files to .dotx