User contributions
Jump to navigation
Jump to search
- 14:42, 21 September 2022 diff hist +7 m 751.1 Preliminary Design updated 751.1.3.4 changed MASH to MASH 2016 for type C and D barriers
- 14:35, 21 September 2022 diff hist +4 m Category:612 Impact Attenuators updated 612.1.1 from MASH to MASH 2016
- 14:21, 21 September 2022 diff hist +40 606.1 Guardrail updated 606.1.3.2 in several locations changing MASH to MASH 2016
- 14:03, 21 September 2022 diff hist +15 606.1 Guardrail updated 606.1.3.1 in 3 places changed MASH to MASH 2016
- 13:58, 21 September 2022 diff hist +15 m 606.1 Guardrail updated 606.1.2 - changed 2 more mash terms to MASH 2016
- 13:53, 21 September 2022 diff hist +5 m 606.1 Guardrail updated 606.1.2 - changed Mash to Mash 2016
- 13:47, 21 September 2022 diff hist +8 m Category:606 Guardrail and Guard Cable updated Guard Cable - Testing Criteria to MASH 2016 (there were 2 more changes in this section)
- 13:45, 21 September 2022 diff hist -8 Category:606 Guardrail and Guard Cable Undo revision 51836 by Hoskir (talk) Tag: Undo
- 13:44, 21 September 2022 diff hist +8 Category:606 Guardrail and Guard Cable
- 13:39, 21 September 2022 diff hist +7 m Category:606 Guardrail and Guard Cable updated Guard Cable - Testing Criteria to MASH 2016
- 13:19, 21 September 2022 diff hist +19 Category:241 Aesthetic Considerations updated to MASH 2016 and AASHTO 2016 current
- 10:45, 21 September 2022 diff hist -78 m 238.2 Land Surveying updated the links to Standard Plan 602.00
- 08:48, 21 September 2022 diff hist +22 m Category:134 Engineering Professional Services updated link to the 2012 UAG
- 10:34, 20 September 2022 diff hist +11 236.7 Negotiation →236.7.2.4 Offer Letter and Supporting Documentation
- 09:11, 16 September 2022 diff hist 0 640.1 Pavement Drainage →640.1.3.2 Composite Curb-and-Gutter Sections current
- 08:51, 16 September 2022 diff hist -1 m Category:128 Conceptual Studies Changed the RES Instructions from a docx to a PDF
- 08:51, 16 September 2022 diff hist -1 m Category:101 Standard Forms →Environmental and Cultural
- 08:50, 16 September 2022 diff hist -1 127.1 Request for Environmental Services Changed the RES Instructions from a docx to a PDF
- 08:48, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.pdf
- 08:19, 16 September 2022 diff hist +11 m Category:128 Conceptual Studies updated the RES Form Instructions
- 08:18, 16 September 2022 diff hist +11 m 127.1 Request for Environmental Services updated the RES Form Instructions
- 08:15, 16 September 2022 diff hist +11 Category:101 Standard Forms →Environmental and Cultural
- 07:58, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.docx
- 09:24, 13 September 2022 diff hist +978 m 806.1 Erosion Control Measures →806.1.7.1 Design Considerations
- 08:37, 12 September 2022 diff hist +243 Category:101 Standard Forms →Materials Related
- 09:19, 7 September 2022 diff hist 0 LPA:136.6 Environmental and Cultural Requirements
- 09:17, 7 September 2022 diff hist +43 N File:136.6.16 2022.pdf LPA Project Process Checklist current
- 08:17, 7 September 2022 diff hist +17 LPA:136.6 Environmental and Cultural Requirements
- 08:12, 7 September 2022 diff hist +31 N File:136.6.15 e106 Example 2022.pdf e106 Form Example current
- 14:57, 2 September 2022 diff hist +63 237.8 Contract Time
- 14:57, 1 September 2022 diff hist -5 m Category:171 Maintenance Policy and Operations current
- 14:56, 1 September 2022 diff hist +12 m Category:171 Maintenance Policy and Operations Revised per revision request 3549
- 14:54, 1 September 2022 diff hist +16 m Category:171 Maintenance Policy and Operations Revised per revision request 3549
- 14:43, 1 September 2022 diff hist +325 616.23 Traffic Control for Field Operations Revised per revision request 3549