User contributions for Hoskir
Jump to navigation
Jump to search
5 August 2026
- 08:3408:34, 5 August 2026 diff hist −7,155 User:Hoskir/Revision Request 4244 No edit summary
- 08:0108:01, 5 August 2026 diff hist +25 User:Hoskir/Revision Request 4244 →321.1.2.3 Load Factors
4 August 2026
- 16:0216:02, 4 August 2026 diff hist −5,239 User:Hoskir/Revision Request 4244 →321.1.2 Slope Stability Analyses for Special Foundation Investigations
- 14:5514:55, 4 August 2026 diff hist +812 User:Hoskir/Revision Request 4244 →321.1.2 Slope Stability Analyses for Special Foundation Investigations
- 12:5512:55, 4 August 2026 diff hist +872 User:Hoskir/Revision Request 4244 →321.1.2 Slope Stability Analyses for Special Foundation Investigations
- 12:5312:53, 4 August 2026 diff hist +41,975 N User:Hoskir/Revision Request 4244 Created page with "<hr style="border:none; height:2px; background-color:red;" />'''copy 321.1'''<hr style="border:none; height:2px; background-color:red;" /> <br> <div style="float: right; margin-top: 5px; margin-left: 15px; margin-bottom: 15px;">__TOC__</div> {| align="right" |- | {| style="margin-left:15px; margin-top: 5px; border:1px solid #a9a9a9; background: #f8f9fa" width="400px" align="right" |- | style="text-align:center;" | '''<u>Additional Information</u>''' |- | ● medi..."
- 11:3111:31, 4 August 2026 diff hist +3,602 N User:Hoskir/Revision Request 4248 Created page with "===236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section=== Licenses and Airspace License Agreements and complex new leases shall be submitted to the Right of Way Section prior to execution by the licensee for concurrence by the Asst. to the State Design Engineer - Right of Way. Non-complex leases, such as those with no form revisions, for appraised value, to the only eligible lessee, do not require prior submittal. Licenses and Airspa..." current
- 11:2811:28, 4 August 2026 diff hist +45 User:Hoskir No edit summary
- 09:2309:23, 4 August 2026 diff hist +30 m Category:135 The Section 106 Process this page is no longer being used current
- 09:2209:22, 4 August 2026 diff hist +46 m Category:100 GENERAL No edit summary current
- 09:2009:20, 4 August 2026 diff hist −105,778 m Category:134 Engineering Professional Services updated EPG 134 to give each article its own page current Tag: Replaced
- 08:5208:52, 4 August 2026 diff hist −48 m 134.5 Consultant Contract Administration No edit summary current
- 08:5208:52, 4 August 2026 diff hist −227 m 134.5 Consultant Contract Administration updated forms box
- 08:4808:48, 4 August 2026 diff hist +1,059 m 134.5 Consultant Contract Administration added forms box
- 08:3708:37, 4 August 2026 diff hist +444 134.4 Contract Approval, Execution and Distribution updated formatting current
- 08:3108:31, 4 August 2026 diff hist +50 m 134.2 Solicitation and Selection Process updated formatting current
- 08:2808:28, 4 August 2026 diff hist +650 m 134.3 Consultant Contract Negotiation updated added forms and fig box current
31 July 2026
- 07:3807:38, 31 July 2026 diff hist +2 Recent Policy Changes in the EPG No edit summary
30 July 2026
- 10:5510:55, 30 July 2026 diff hist −615 m 153.21 Traffic updated several instruction links current
28 July 2026
- 11:1511:15, 28 July 2026 diff hist −481 m 153.21 Traffic updated some of the links
- 09:5709:57, 28 July 2026 diff hist +31 m 903.19 Signing Agreements →903.19.5 TR47 Wayfinding Signing: updated links current
- 09:5409:54, 28 July 2026 diff hist +22 m 903.19 Signing Agreements →903.19.4 TR42 Welcome to Signing Installed and Maintained by City: updated links
- 09:1309:13, 28 July 2026 diff hist +253 m 903.19 Signing Agreements →903.19.3 TR15 Sign Program Participation Paid by Others: updated links
- 09:0009:00, 28 July 2026 diff hist +4 m 903.19 Signing Agreements →903.19.1 TR09 Contract for Signs at Cattle Crossing
- 09:0009:00, 28 July 2026 diff hist −17 m 903.19 Signing Agreements →903.19.2 TR12 Contract for Signs at Truck Crossing: updated link
- 08:5808:58, 28 July 2026 diff hist +97 m 903.19 Signing Agreements →903.19.1 TR09 Contract for Signs at Cattle Crossing: updated link
- 08:4908:49, 28 July 2026 diff hist −522 m Category:903 Highway Signing (MUTCD Part 2) fixed links to signing agreements current
- 08:0608:06, 28 July 2026 diff hist −365 m Category:101 Standard Forms →Construction and Materials: removed forms from CM that aren't being used anymore
24 July 2026
- 15:5815:58, 24 July 2026 diff hist +11,573 N 134.1 Introduction moved 134.1 to its own page current
- 15:5415:54, 24 July 2026 diff hist +1,260 m 134.2 Solicitation and Selection Process added forms box
- 15:1015:10, 24 July 2026 diff hist +36,567 N 134.2 Solicitation and Selection Process moved 134.2 to new page
- 13:2713:27, 24 July 2026 diff hist +17,879 N 134.3 Consultant Contract Negotiation 134.3 moved to its own page
- 13:1313:13, 24 July 2026 diff hist +8,532 N 134.6 Dispute Resolution moved 134.6 to its own page current
- 12:5312:53, 24 July 2026 diff hist +2 m 134.4 Contract Approval, Execution and Distribution No edit summary
- 12:5212:52, 24 July 2026 diff hist +4,919 N 134.4 Contract Approval, Execution and Distribution moved 134.4 to its own page
- 12:4412:44, 24 July 2026 diff hist +23,590 N 134.5 Consultant Contract Administration moved 134.5 to its own page
- 12:0412:04, 24 July 2026 diff hist −11 Engineering Professional Services Guidelines No edit summary current
- 12:0412:04, 24 July 2026 diff hist −52 Engineering Professional Services Guidelines removed link to category
- 11:3411:34, 24 July 2026 diff hist −4,118 m 133.5 Operator’s Guide for Anti-Icing →133.5.3 Tables: updated formatting on the tables current
- 09:2209:22, 24 July 2026 diff hist −54 133.5 Operator’s Guide for Anti-Icing →133.5.1 Operations Guide for Maintenance Field Personnel
- 09:0509:05, 24 July 2026 diff hist −41 Job Special Provisions No edit summary current
23 July 2026
- 08:1808:18, 23 July 2026 diff hist +2 m Category:101 Standard Forms →Design: updated link under desgin/materials
22 July 2026
- 09:1709:17, 22 July 2026 diff hist +336 Recent Policy Changes in the EPG No edit summary
- 09:0809:08, 22 July 2026 diff hist +322 236.5 Property Management →236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section: updated per RR4248 current
- 09:0609:06, 22 July 2026 diff hist +3,602 N User:Hoskir/Revision Request 4247 Created page with "===236.5.25.9 Lease/Licenses/Airspace License Agreements Submittals to Right of Way Section=== Licenses and Airspace License Agreements and complex new leases shall be submitted to the Right of Way Section prior to execution by the licensee for concurrence by the Asst. to the State Design Engineer - Right of Way. Non-complex leases, such as those with no form revisions, for appraised value, to the only eligible lessee, do not require prior submittal. Licenses and Airspa..."
- 08:3908:39, 22 July 2026 diff hist 0 Recent Policy Changes in the EPG No edit summary
- 08:3908:39, 22 July 2026 diff hist +572 Recent Policy Changes in the EPG No edit summary
- 08:3608:36, 22 July 2026 diff hist −11 902.23 Traffic Signal Phasing and Operation →902.23.7.2 Yellow Change and Red Clearance Intervals: updated per RR4246 current
- 08:3408:34, 22 July 2026 diff hist +7,362 N User:Hoskir/Revision Request 4246 Created page with "===902.23.7.2 Yellow Change and Red Clearance Intervals=== '''Standard.''' A steady yellow signal indication shall be displayed following every CIRCULAR GREEN or GREEN ARROW signal indication and following every flashing YELLOW ARROW signal indication displayed as a part of a steady mode operation. This requirement shall not apply when a CIRCULAR GREEN or a flashing YELLOW ARROW signal indication is followed immediately by a GREEN ARROW signal indication. The exclusive..." current
- 08:2108:21, 22 July 2026 diff hist +7 Category:134 Engineering Professional Services →134.5.1 Invoicing: updated per RR4243