Oldest pages
Jump to navigation
Jump to search
Showing below up to 50 results in range #551 to #600.
- 109.11 Compensation for Project Delays (for Sec 109.11) (15:16, 30 April 2025)
- 109.8 Final Acceptance and Payment (for Sec 109.8) (08:54, 1 May 2025)
- 109.7 Partial Payments (for Sec 109.7) (12:19, 1 May 2025)
- 109.6 Method of Payment (for Sec 109.6) (12:22, 1 May 2025)
- 109.5 Force Account (for Sec 109.5) (12:27, 1 May 2025)
- 109.4 Differing Site Conditions and Changes in the Work (for Sec 109.4) (12:40, 1 May 2025)
- 109.3 Compensation for Altered Quantities (for Sec 109.3) (12:43, 1 May 2025)
- 109.2 Scope of Payment (for Sec 109.2) (12:46, 1 May 2025)
- 109.1 Measurement of Quantities (for Sec 109.1) (12:56, 1 May 2025)
- 105.1. Authority and Duties in Contract Administration (Sec 105.1) (12:58, 1 May 2025)
- 105.2. Plans and Working Drawings (Sec 105.2) (12:58, 1 May 2025)
- 105.3. Conformity with Contract Documents (Sec 105.3) (12:59, 1 May 2025)
- 105.4 Coordination of Contract Documents (Sec 105.4) (12:59, 1 May 2025)
- 105.5 Cooperation by Contractor (Sec 105.5) (12:59, 1 May 2025)
- 105.6 Cooperation Between Contractors (Sec 105.6) (12:59, 1 May 2025)
- 105.7 Cooperation With Utilities (Sec 105.7) (13:02, 1 May 2025)
- 105.8 Construction Stakes, Lines and Grades (Sec 105.8) (13:02, 1 May 2025)
- 105.9 Authority and Duties of Resident Engineer (Sec 105.9) (13:14, 1 May 2025)
- 105.10 Inspection of Work (Sec 105.10) (13:47, 1 May 2025)
- 105.11 Unauthorized and Defective Work (Sec 105.11) (13:51, 1 May 2025)
- 105.12 Load Restrictions (13:58, 1 May 2025)
- 105.13 Maintenance of the Work (Sec 105.13) (13:59, 1 May 2025)
- 105.14 Failure to Maintain Roadway or Structure (Sec 105.14) (13:59, 1 May 2025)
- 105.16 Controversies and Claims for Adjustment (Sec 105.16) (14:37, 1 May 2025)
- 105.17 Venue (Sec 105.17) (14:37, 1 May 2025)
- 105.18 Arbitration (Sec 105.18) (14:38, 1 May 2025)
- 105.20 Adjusting Water Service Leads (14:39, 1 May 2025)
- 105.21 Agreement for Shifting State Highway Entrance (14:39, 1 May 2025)
- 105.22 Duties of the District Construction and Materials Engineer (14:39, 1 May 2025)
- 108.1 Subletting of Contract (for Sec 108.1) (14:54, 1 May 2025)
- 108.15 Suspension of Work Directed by the Engineer (15:00, 1 May 2025)
- 108.7 Contract Time for Completion of the Work (15:03, 1 May 2025)
- 108.11 Termination of Contract for Convenience of the Commission (15:06, 1 May 2025)
- 107.1 Laws to be Observed (15:24, 1 May 2025)
- 107.10 Environmental Protection (15:30, 1 May 2025)
- 106.1 Source of Supply and Quality Requirements (15:38, 1 May 2025)
- 106.2 Local Materials Sources (15:39, 1 May 2025)
- 106.3 Samples, Tests and Cited Specifications (15:41, 1 May 2025)
- 106.4 Plant Inspections (15:44, 1 May 2025)
- 824.1 Maintenance Planning Guidelines for Litter Pick-Up (08:01, 14 May 2025)
- 141.8 Sponsorship Programs (08:30, 14 May 2025)
- 822.4 Recommended Practices (10:15, 14 May 2025)
- 127.29 Stormwater (10:28, 14 May 2025)
- 106.3.2.1 TM-1, Alkalinity of Glass Fiber Mat Materials (08:40, 13 June 2025)
- 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs (08:42, 13 June 2025)
- 106.3.2.8 TM-8, Photometric Test for Measuring the Brightness of Reflective Sheeting (08:43, 13 June 2025)
- 106.3.2.14 TM-14, Soundness Test of Coarse Aggregate - Water-Alcohol Freeze Method (08:45, 13 June 2025)
- 106.3.2.18 TM-18, Smolder Resistance of Jute Netting (08:46, 13 June 2025)
- 106.3.2.19 TM-19, Measurement of Pavement Surface Texture Depth by the Sand-Patch Method (08:47, 13 June 2025)
- 106.3.2.20 TM-20, Measurement of Air, Surface or Bituminous Mixture Temperature (08:48, 13 June 2025)