Category:108 Prosecution and Progress
Sec 108.5 places responsibility on the contractor to furnish adequate forces for meeting specified project schedules as well as quality requirements. The resident engineer should bring unsatisfactory progress to the contractor's attention in writing. Send copies of such letters to the district engineer and Construction & Materials. If the contractor fails to respond in keeping with the intent of this section, the matter must be brought immediately to the attention of the district office.
Support all time assessments by adequate diary entries. If a project goes into overtime, the diary should indicate whether each day would have been assessed if it were not in overtime. Review of project history must often rely heavily on diary information. On calendar day and calendar date projects, the diary entry should indicate whether the day would be charged as a working day. This is particularly important for days when the contractor does not work.
This article also discusses important project dates and extensions or adjustments of time for when a project’s progress is adversely affected by items beyond a contractor’s control.
Articles in "108 Prosecution and Progress"
The following 16 pages are in this category, out of 16 total.
1
- 108.1 Subletting of Contract (for Sec 108.1)
- 108.2 Notice to Proceed (for Sec 108.2)
- 108.3 Prosecution of Work
- 108.4 Progress Schedules
- 108.5 Labor, Methods and Equipment
- 108.6 Temporary Suspension of Work
- 108.7 Contract Time for Completion of the Work
- 108.8 Liquidated Damages for Failure or Delay in Completing Work on Time
- 108.9 Signal and Lighting Malfunctions
- 108.10 Default of Contract
- 108.11 Termination of Contract for Convenience of the Commission
- 108.12 Notice to Contractor and Surety
- 108.13 Termination of Contract for Misconduct
- 108.14 Determination of Compensation and Contract Time Extension for Excusable, Noncompensable and Compensable Delays
- 108.15 Suspension of Work Directed by the Engineer
- 108.16 Project Dates