108.12 Notice to Contractor and Surety

From Engineering Policy Guide
Jump to navigation Jump to search

Refer to EPG 152 Contactor Bonding Responsibilities and Sec 108.12 for information on notice to the contractor when a contract has been terminated or default has occurred.