Main Page
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised |
RECENT POLICY CHANGES IN THE EPG | ||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 751.40.4.3 Replacement of Existing Curb with Thrie Beam Rail 12/2/11: Numerous minor revisions bring EPG guidance into compliance with the standard plans for thrie beam in both EPG 751.40.4.3 and EPG 751.50 Standard Detailing Notes. Steel Superstructure Details 11/23/11: Guidance in EPG 751.14.5 Details was revised for greater consistency. EPG 751.14.5.10 was added to illustrate consistency in application. Effect of Grades on Stopping Sight Distance (SSD) 11/22/11: Traffic and Highway Safety Division has added a spreadsheet to calculate SSD for additional grades. 11/22/11: Outdated information in several portions of this article were updated. Three forms were also revised to increase clarity. EPG 137 Construction Inspection Guidance for Records to be Maintained 11/14/11: District, office, naming convention and archiving option information for construction inspection records was updated. EPG 751.13.2 Silicone Expansion Joint Sealant 11/8/11: Silicone expansion joint sealant systems shall not be used for normal contract new or rehabilitation jobs. 11/7/11: In EPG 409 Seal Coat, the JSP has been updated. Minimum Support Length 11/3/11: Guidance has been expanded about the impact of minimum support length on some dimensions in EPG 751.34.3.2. Continuous Operations Routes Maps Updated 11/1/11: EPG 133.4 Snow and Ice Control Operation and EPG 144 Practical Operations now provide the latest maps for Continuous Operations Routes. Fee Consultants' Duration on Approved Rosters 11/1/11: Fee consultants' duration on approved rosters is 3 years after which a renewal application must be submitted to remain on the list. Guidance has been added in EPG 236.6.5.3, EPG 236.7.8.1, EPG 236.11.2.2 and EPG 236.18.6.1.2. Encased Pile Caps 10/26/11: Expanded guidance about encased pile cap bents and corrosion, concrete pile cap intermediate bent details and concrete pile cap intermediate bent reinforcement is now available. 10/25/11: This new figure has been added to EPG 104.7 Estimates by Transportation Planning as an aid to estimate costs. General Detail Considerations for Drilled Shafts 10/21/11: Because concrete coring may still be required in special circumstances to inspect drilled shafts, general detail considerations have been added. Related guidance is available at EPG 751.1.2.23 Drilled Shafts. 10/19/11: In EPG 409 Seal Coat, the Seal Coat Guidelines have been updated. BEAP Consultant List 10/19/11: The BEAP Consultant List was updated in EPG 754 Bridge Engineering Assistance Program. EPG 136.6 Consultant Contracts 10/18/11: DBE goals are now required in all contracts, regardless of contract amount. Updated Change Orders QRG 10/17/11: The Change Orders QRG was updated in both EPG 101 and EPG 109. Contract Seal Coat Guidelines, JSP and Templates 10/7/11: In EPG 409 Seal Coat, the Seal Coat Guidelines, JSP and Contract Seal Coat Plan Templates have been updated. EPG 751.24 LFD Retaining Walls 9/30/11: Information from the Bridge Manual pdf. file has been uploaded into the article. New EPG 751.50 Standard Detailing Note J1.25 9/19/11: The allowable bearing pressure is typically included on the foundation investigation geotechnical report, but can often be missed including it on plans. The allowable bearing pressure will now be required to be shown on all MSE wall plans. EPG 620 Pavement Marking Guidelines Table 9/19/11: Two notes were added to this popular table to clarify its info. Contract Seal Coat JSP and Templates 9/14/11: In EPG 409 Seal Coat, the JSP and Contract Seal Coat Plan Templates have been updated. EPG 754 Bridge Engineering Assistance Program (BEAP) 9/12/11: A different group of BEAP consultants for the next three years has been selected. EPG 754 has also been generally updated and clarified. Curb Plates no longer Required 9/9/11: Curb plates will no longer be required for silicone expansion, strip seal and preformed compression joint seal expansion systems. Numerous figures have been updated in EPG 751.13. Bituminous Pavement Layer Design 9/8/11: The minimum thickness for BP-1 has been increased to 1 3/4 in. and SP95's minimum thickness increased to 1 1/2 inch. Contract Finalization and Key Dates QRGs |