Category:105 Control of Work

From Engineering Policy Guide
Revision as of 13:54, 28 February 2025 by Hoskir (talk | contribs) (moved 105.1 through 105.22 to their own pages and updated formatting)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forms

The many aspects of control of work, including the responsibilities of the Resident Engineer, preconstruction conferences, duties of inspectors and acceptance of small quantities, are presented in this article. Also discussed is how the district construction and materials engineer is directly responsible to the District Engineer and expected to operate as the District Engineer's representative.