108.12 Notice to Contractor and Surety

From Engineering Policy Guide
Revision as of 08:35, 23 April 2025 by Hoskir (talk | contribs) (moved from main category to new page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Refer to EPG 152 Contactor Bonding Responsibilities and Sec 108.12 for information on notice to the contractor when a contract has been terminated or default has occurred.