Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 147.1)
m (EPG Minor Routes)
Line 50: Line 50:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late July, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late July, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 76048 ||'''10.''' [[:Category:101 Standard Forms|EPG 101]], 116293
+
|'''20.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 76267 ||'''10.''' [[:Category:101 Standard Forms|EPG 101]], 116454
 
|-
 
|-
|'''19.'''  [[903.5 Regulatory Signs|EPG 903.5]], 79127 ||'''9.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 116551
+
|'''19.'''  [[903.5 Regulatory Signs|EPG 903.5]], 79223 ||'''9.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 116740
 
|-
 
|-
|'''18.'''  [[751.5 Standard Details|EPG 751.5]], 80887 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 122158
+
|'''18.'''  [[751.5 Standard Details|EPG 751.5]], 80960 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 122243
 
|-
 
|-
|'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 81224   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 139660
+
|'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 81290   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 139841
 
|-
 
|-
|'''16.'''  [[903.6 Warning Signs|EPG 903.6]], 84003 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 150733
+
|'''16.'''  [[903.6 Warning Signs|EPG 903.6]], 84094 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 150846
 
|-
 
|-
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 86046   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 184111
+
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 86082   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 184341
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 88004 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 189252
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 88055 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 189403
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 89436   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 207793
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 89539   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 207969
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 98525 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 212743
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 98681 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 213011
 
|-
 
|-
|'''11.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 101632 ||'''1.''' EPG Main Page, 1181115
+
|'''11.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 101974 ||'''1.''' EPG Main Page, 1182883
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[http://epg.modot.org/index.php?title=Category:Minor_Routes_Shouldering_Project_Guidelines#Constructability Constructability of Minor Routes Shouldering Projects]'''
 +
 +
7/24/13: The Modified Shoulder JSP has been replaced with the Optional Shoulder JSP.
 +
 
'''[[147.1 Alternative Technical Concepts#147.1.3.1 The Standard ATC|EPG 147.1.3.1 The Standard Alternative Technical Concepts (ATC)]]'''
 
'''[[147.1 Alternative Technical Concepts#147.1.3.1 The Standard ATC|EPG 147.1.3.1 The Standard Alternative Technical Concepts (ATC)]]'''
  
Line 167: Line 171:
  
 
6/6/13: The latest version of this sign is now available for viewing.
 
6/6/13: The latest version of this sign is now available for viewing.
 
'''Addressing Prevailing Wages and Subcontracts for Professional Services'''
 
 
6/4/13: Guidance about how to administer contract work performed by "Professional Services" was clarified in both [[:Category:108 Prosecution and Progress#In addition to the submission of the|EPG 108.1 Subletting of Contract]] and [[:Category:110 State and Federal Wage Rates and Other Requirements#Professional Services|EPG 110.3 Prevailing Wages and Records]].
 

Revision as of 11:22, 24 July 2013

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Sr. Design Technician Chuck Schumann was the first on the scene of an accident near Moberly. He called 911, pried open the car's door and got the woman to safety until emergency personnel arrived.
A Massman, Traylor, Alberici (MTA) employee conducts a splice inspection on the final section of the middle span of the Stan Musial Veterans Memorial Bridge connecting St. Louis and Illinois. If you are wondering, he is on the Illinois side of the bridge.
Sometimes the EPG is proud to just show off our skillful employees. Some of the Normandy Maintenance Building employees enjoy a recent photo. From left to right: Tim Grady (Int. Mntc. Worker), Mike Catching (Mntc. Crew Leader), Rich Jones (Sr. Mntc. Worker), Stacy Gerard (Mntc. Crew Leader), Ralph Brooks (Mntc. Supervisor, center, standing), Matt McCarty (Mntc. Worker), Ken Wich (Sr. Mntc. Worker) and Bill Bernsen (Int. Mntc. Worker).

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Crews from Fred Weber Inc., Millstone Bangert Inc. and Kolb Grading, forming the joint venture Page Constructors LLC, drive pile for the Gutermuth Rd. bridge over the Rte. 364 Page Ave. Phase 3 in Cottleville.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late July, the numbers of hits are:
20. EPG 136.4, 76267 10. EPG 101, 116454
19. EPG 903.5, 79223 9. EPG 616, 116740
18. EPG 751.5, 80960 8. EPG 200, 122243
17. EPG 136.9, 81290 7. EPG 616.23, 139841
16. EPG 903.6, 84094 6. EPG 600, 150846
15. EPG 400, 86082 5. EPG 100, 184341
14. EPG 751.40, 88055 4. EPG 700, 189403
13. EPG 620.2, 89539 3. EPG 900, 207969
12. EPG 903, 98681 2. EPG 751, 213011
11. EPG 136.12, 101974 1. EPG Main Page, 1182883

Constructability of Minor Routes Shouldering Projects

7/24/13: The Modified Shoulder JSP has been replaced with the Optional Shoulder JSP.

EPG 147.1.3.1 The Standard Alternative Technical Concepts (ATC)

7/23/13: Three new pdf files now provide additional guidance for the Standard ATC process.

Cost Estimate Guide for Rural Preliminary Design

7/16/13: EPG 104.7 Estimates presents the latest cost estimates. Most of the estimates remained stable, with the Maintenance Treatment figures showing the most revision.

EPG 751.1.2.18 Soundings (Borings)

7/12/13: A new word document now provides guidance for filling out Form M-40a, Request for Final Soundings of Structures, especially about bridge and roadway classifications.

Elastomeric Bearings

7/11/13: In EPG 751.11.1.1 and EPG 751.11.2.1, guidance was clarified on the use of plain and laminated bearing pads. Bearing pad length requirements for P/S NU girders and P/S Spread Box Beams were added. Also, figures in EPG 751.22.1.4 Span and Structure Lengths were updated to reflect the clarification.

Pre-negotiation and Hourly Rate Reviews

7/11/13: Revisions in EPG 134.3 Consultant Contract Negotiation result from Audits and Investigations ceasing the pre-negotiation reviews and shifting the reviews to project managers and/or contract administrators. Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts, was also added to provide additional help.

Bridge Slabs

7/10/13: Guidance was expanded in EPG 751.6.2.10 Bridge Slabs and the related Standard Detailing Note B3.22 was also updated.

2014-2018 STIP

7/10/13: The link to the latest STIP is available in several articles, including EPG 121.3 The Statewide Transportation Improvement Program (STIP).

Right of Way Negotiation Guidelines and Procedures

7/8/13: When acquiring realty rights, a minimum offer has been established in EPG 236.7.2.3 Prompt Offer of Just Compensation.

EPG 134.3.6 Subconsultants

7/8/13: If a subconsultant is not pre-qualified with MoDOT, the firm shall now include their Consultant Certification of Indirect Cost Form instead of the MRC Form.

Contract Leveling Course

7/8/13: The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in EPG 402 Bituminous Surface Leveling. Also, the CLC Template examples have been expanded to four scenarios involving the use of pilot cars.

EPG 751.50 A1 Notes

7/5/13: The Design Specifications, Loadings & Unit Stresses general notes have been updated to reflect new AASHTO interim dates. Some other notes have also been reorganized.

EPG 616.19 Quality Standards for Temporary Traffic Control Devices

7/1/13: This article has been expanded to provide superior guidance.

Bridge Engineering Assistance Program (BEAP)

6/25/13: EPG 754 Bridge Engineering Assistance Program (BEAP) has been moved to EPG 136.3.8.9 Bridge Engineering Assistance Program (BEAP). The content of the article was only slightly modified.

EPG 616.6.87 Temporary Rumble Strips

6/25/13: New guidance provides examples of when temporary rumble strips may be used.

Traffic Signal Signs

6/18/13: Additional guidance has been provided about the left turn signal remaining in place until the circular red indication is replaced with a red left arrow and the LEFT TURN YIELD ON GREEN sign being maintained until being converted to the flashing yellow arrow indicator.

EPG 616.6.87 Temporary Rumble Strips

6/17/13: Guidance is now available for both long term and short term rumble strips on construction projects.

EPG 237.9 Submission of Plans and Supporting Documents

6/17/13: This article has been generally clarified and updated to reflect current practices.

EPG 236.3.7.5 Distribution of Clearance Certification

6/14/13: This article has been updated to show the current RW email procedure.

Shall, Will, Should and May

6/13/13: The definitions for these terms have been slightly modified for greater consistency.

Contract Leveling Course Projects

6/12/13: The tacking rate was adjusted to a minimum of 0.08 gal/yd2 to be consistent with other standards. Maintenance operation guidance about pavement markings and eliminating pavement edge drop-offs was also clarified.

Pile Driving Set Calculator

6/12/13: In EPG 702.1.4.1 Pile Formula, the pile driving set calculator was updated by removing the hammer efficiency from the calculations. The spreadsheet formula is used to calculate the pile set to help determine when to stop driving pile.

Work Zone Traffic Control, Pilot Cars and Law Enforcement Services

6/11/13: In EPG 616.3.10, EPG 616.3.13, EPG 616.16 and EPG 616.18, additional guidance was provided about signing for side roads when a pilot car is being used in a one-lane two-way operation, the use of bump signs in work zones and the expectations and type of law enforcement used in work zones.

Table 903.7.51 Approved Missouri Scenic Byways

6/10/13: The table of approved Mo Scenic Byways has been updated with the addition of three new byways.

New Sponsor-A-Highway Signs

6/6/13: The latest version of this sign is now available for viewing.