Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (new photo)
m
Line 43: Line 43:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2"|  [[image:Main Page Aug 5, 2013.jpg|center|390px|thumb|<center>'''  Chief Engineer Ed Hassinger speaks with the media at the groundbreaking for the [http://www.modot.org/stlouis/major_projects/ParkovertheHighway.htm Park Over the Highway] in downtown‬ St. Louis. Part of [http://www.cityarchriver.org/ CityArchRiver 2015], the project will improve pedestrian accessibility and create a modern urban national park.       '''</center>]]
+
|colspan="2"|  [[image:Main Page 4a Aug 8, 2013.jpg|center|390px]]
 +
|-
 +
|colspan="2" |<center>'''  Rainfall of more than a foot caused record flooding on the Gasconade R., closing I-44 between Rolla and Jerome (above) and closing US 63 south of Vienna (below). Gov. Nixon declared a state of emergency for south-central and other parts of Missouri.     </center>  
 +
|-
 +
|[[image:Main Page 4b Aug 8, 2013.jpg|center|390px]]
 
|}
 
|}
  

Revision as of 09:56, 8 August 2013

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
To honor 100 years of service to Missouri, we have produced a 5-minute video, MoDOT’s Centennial, that looks back over our landmark events. It revisits our early years and follows the changes that made us who we are today.
The Regional Bridge Crew, repairing a joint on an I-49 bridge north of Jasper, includes, from left, Inter. Maintenance Worker Scott Oliver, Inter. Maintenance Worker Adam Hawkins, Sr. Maintenance Worker Daniel Myers and Sr. Maintenance Worker Chad Barger.
Sr. Historic Preservation Specialist Michael Meyer instructs two interns, Kim Proctor (SE Mo State U. student) and Catherine Gravemann (U. of Mo - Columbia student), about archeology and requirements to determine environmental impacts for the Champ Clark Bridge project.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Main Page 4a Aug 8, 2013.jpg
Rainfall of more than a foot caused record flooding on the Gasconade R., closing I-44 between Rolla and Jerome (above) and closing US 63 south of Vienna (below). Gov. Nixon declared a state of emergency for south-central and other parts of Missouri.
Main Page 4b Aug 8, 2013.jpg
Perhaps you've wondered how many hits the most popular EPG articles have. As of early August, the numbers of hits are:
20. EPG 136.4, 77865 10. EPG 101, 117775
19. EPG 903.5, 79870 9. EPG 616, 117903
18. EPG 751.5, 81526 8. EPG 200, 122926
17. EPG 136.9, 81918 7. EPG 616.23, 141266
16. EPG 903.6, 84746 6. EPG 600, 151849
15. EPG 400, 86521 5. EPG 100, 185715
14. EPG 751.40, 88416 4. EPG 700, 190703
13. EPG 620.2, 91257 3. EPG 900, 209256
12. EPG 903, 99598 2. EPG 751, 215715
11. EPG 136.12, 105508 1. EPG Main Page, 1203708

EPG 109.14 Price Adjustment for Fuel

8/6/13: Concrete approach pavement has been added to the list of eligible fuel adjustment items in the table.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts

8/6/13: A reminder to PMs was added that they must wait on FHWA obligation before issuing a NTP to consultants when a contract uses federal funds.

EPG 134.4 Contract Approval, Execution and Distribution

8/1/13: Agreement from Audits and Investigations is no longer required for the man-hours, salary rates, overhead rates, direct costs and fixed fee included in the consultant contract.

EPG 127.29 Stormwater

7/26/13: This new article provides guidance for the MDNR's MS4 permit, which pertains to illicit discharges.

Ultrathin Bonded Asphalt Wearing Surface

7/24/13: In EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface, the old Ashpalt Cement Price Index Example file was replaced with the new Asphalt Cement Price Adjustment spreadsheet for square yard items.

Constructability of Minor Routes Shouldering Projects

7/24/13: The Modified Shoulder JSP has been replaced with the Optional Shoulder JSP.

EPG 147.1.3.1 The Standard Alternative Technical Concepts (ATC)

7/23/13: Three new pdf files now provide additional guidance for the Standard ATC process.

Cost Estimate Guide for Rural Preliminary Design

7/16/13: EPG 104.7 Estimates presents the latest cost estimates. Most of the estimates remained stable, with the Maintenance Treatment figures showing the most revision.

EPG 751.1.2.18 Soundings (Borings)

7/12/13: A new word document now provides guidance for filling out Form M-40a, Request for Final Soundings of Structures, especially about bridge and roadway classifications.

Elastomeric Bearings

7/11/13: In EPG 751.11.1.1 and EPG 751.11.2.1, guidance was clarified on the use of plain and laminated bearing pads. Bearing pad length requirements for P/S NU girders and P/S Spread Box Beams were added. Also, figures in EPG 751.22.1.4 Span and Structure Lengths were updated to reflect the clarification.

Pre-negotiation and Hourly Rate Reviews

7/11/13: Revisions in EPG 134.3 Consultant Contract Negotiation result from Audits and Investigations ceasing the pre-negotiation reviews and shifting the reviews to project managers and/or contract administrators. Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts, was also added to provide additional help.

Bridge Slabs

7/10/13: Guidance was expanded in EPG 751.6.2.10 Bridge Slabs and the related Standard Detailing Note B3.22 was also updated.

2014-2018 STIP

7/10/13: The link to the latest STIP is available in several articles, including EPG 121.3 The Statewide Transportation Improvement Program (STIP).

Right of Way Negotiation Guidelines and Procedures

7/8/13: When acquiring realty rights, a minimum offer has been established in EPG 236.7.2.3 Prompt Offer of Just Compensation.

EPG 134.3.6 Subconsultants

7/8/13: If a subconsultant is not pre-qualified with MoDOT, the firm shall now include their Consultant Certification of Indirect Cost Form instead of the MRC Form.

Contract Leveling Course

7/8/13: The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in EPG 402 Bituminous Surface Leveling. Also, the CLC Template examples have been expanded to four scenarios involving the use of pilot cars.

EPG 751.50 A1 Notes

7/5/13: The Design Specifications, Loadings & Unit Stresses general notes have been updated to reflect new AASHTO interim dates. Some other notes have also been reorganized.

EPG 616.19 Quality Standards for Temporary Traffic Control Devices

7/1/13: This article has been expanded to provide superior guidance.

Bridge Engineering Assistance Program (BEAP)

6/25/13: EPG 754 Bridge Engineering Assistance Program (BEAP) has been moved to EPG 136.3.8.9 Bridge Engineering Assistance Program (BEAP). The content of the article was only slightly modified.

EPG 616.6.87 Temporary Rumble Strips

6/25/13: New guidance provides examples of when temporary rumble strips may be used.

Traffic Signal Signs

6/18/13: Additional guidance has been provided about the left turn signal remaining in place until the circular red indication is replaced with a red left arrow and the LEFT TURN YIELD ON GREEN sign being maintained until being converted to the flashing yellow arrow indicator.

EPG 616.6.87 Temporary Rumble Strips

6/17/13: Guidance is now available for both long term and short term rumble strips on construction projects.

EPG 237.9 Submission of Plans and Supporting Documents

6/17/13: This article has been generally clarified and updated to reflect current practices.

EPG 236.3.7.5 Distribution of Clearance Certification

6/14/13: This article has been updated to show the current RW email procedure.

Shall, Will, Should and May

6/13/13: The definitions for these terms have been slightly modified for greater consistency.