Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751.50, EPG 751.50)
m (EPG 127.13.9)
Line 27: Line 27:
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|colspan="2"|  [[image:Main Page Jan 30, 2014.jpg|center|390px|thumb|<center>'''    Seasonal Maintc. Worker Rocky Olbrey clears right of way along Rte. 43 north of Seneca while Sr. Maintc. Worker Mike Christenson follows in a protection truck.  </center>''']]
 
|-
 
|-
 
|colspan="2"|  [[image:Main Page Jan 29, 2014.jpg|center|390px|thumb|<center>'''    While preparing for a pipe-replacement project on Rte. 179, [http://www.modot.org/central/news_and_information/District5Release.shtml?action=displaySSI&newsId=192669 MODOT workers discovered a late 1920s or early 1930s-era wooden box culvert]. The drainage structure is believed to be the last of its kind on central Missouri highways.  </center>''']]
 
|colspan="2"|  [[image:Main Page Jan 29, 2014.jpg|center|390px|thumb|<center>'''    While preparing for a pipe-replacement project on Rte. 179, [http://www.modot.org/central/news_and_information/District5Release.shtml?action=displaySSI&newsId=192669 MODOT workers discovered a late 1920s or early 1930s-era wooden box culvert]. The drainage structure is believed to be the last of its kind on central Missouri highways.  </center>''']]
 
|-
 
|-
|  [[image:Main Page Jan 24, 2014.jpg|center|390px|thumb|<center>'''    MoDOT's Construction Budget    '''</center>]]
+
|colspan="2"|  [[image:Main Page Jan 24, 2014.jpg|center|390px|thumb|<center>'''    MoDOT's Construction Budget    '''</center>]]
|-
 
|colspan="2"|  [[image:Main Page Jan 23, 2014.jpg|center|390px|thumb|<center>'''    Employees from the joint venture of [http://www.walshgroup.com/news/walsh-alberici-selected-to-build-new-daniel-boone-bridge.html Walsh-Alberici] pour the drilled shaft for a bridge column of the [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm new I-64 Daniel Boone Bridge] over the Missouri River.  The project will have all the traffic in their final positions by October 2015. In late 2015, the current westbound bridge, built in 1935, will be removed. '''</center>]]
 
 
|}
 
|}
  
Line 43: Line 43:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
| [[image:Main Page Jan 22, 2014.jpg|center|390px|thumb|<center>'''    Work proceeds on the [http://www.modot.org/stlouis/major_projects/Route364upgrade.htm Rte. 364 Page Ave. Extension] bridge over Motherhead Rd. in Cottleville.  The 9-mile project is scheduled to open in sections this fall with this section (Rte. K to Rte. 94) to open at the end of October.    '''</center>]]
+
| [[image:Main Page Jan 23, 2014.jpg|center|390px|thumb|<center>'''    Employees from the joint venture of [http://www.walshgroup.com/news/walsh-alberici-selected-to-build-new-daniel-boone-bridge.html Walsh-Alberici] pour the drilled shaft for a bridge column of the [http://www.modot.org/stlouis/major_projects/newdanielboonebridge.htm new I-64 Daniel Boone Bridge] over the Missouri River.  The project will have all the traffic in their final positions by October 2015. In late 2015, the current westbound bridge, built in 1935, will be removed.    '''</center>]]
 
|}
 
|}
  
Line 50: Line 50:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late January, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late January, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 88095 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 131647
+
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 88168 ||'''10.''' [[:Category:200 GEOMETRICS|EPG 200]], 131684
 
|-
 
|-
|'''19.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 90340   ||'''9.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 139361
+
|'''19.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 90365   ||'''9.'''  [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 139535
 
|-
 
|-
|'''18.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 91241   ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 143528
+
|'''18.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 91266   ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 143641
 
|-
 
|-
|'''17.'''    [[:Category:134 Engineering Professional Services|EPG 134]], 92570  ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 158147
+
|'''17.'''    [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 92620  ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 158244
 
|-
 
|-
|'''16.'''   [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 92602  ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 164608
+
|'''16.'''   [[:Category:134 Engineering Professional Services|EPG 134]], 92651  ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 164646
 
|-
 
|-
|'''15.'''  [[903.6 Warning Signs|EPG 903.6]], 92751 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 199874
+
|'''15.'''  [[903.6 Warning Signs|EPG 903.6]], 92785 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 199952
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 95859 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 206645
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 95886 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 206732
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 100478   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 225181
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 100514   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 225272
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 110513 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 242206
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 110578 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 242316
 
|-
 
|-
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 130563 ||'''1.''' EPG Main Page, 1416867
+
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 130594 ||'''1.''' EPG Main Page, 1417834
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[127.13 Noise#127.13.9 Reasonableness|EPG 127.13.9 Reasonableness]]'''
 +
 +
1/30/14:  Mandatory Reasonableness Factor #3 was clarified to state that "Noise abatement measures must provide...a minimum of 7 dBA for 67 percent of ''benefitted'' first-row receptors."
 +
 
'''EPG 751.10 General Superstructure'''
 
'''EPG 751.10 General Superstructure'''
  
Line 167: Line 171:
  
 
12/3/13: Guidance in several locations of this article was updated to reflect that pre-audits are no longer conducted for consultant or utility contracts.
 
12/3/13: Guidance in several locations of this article was updated to reflect that pre-audits are no longer conducted for consultant or utility contracts.
 
'''[[:Category:701 Drilled Shafts|EPG 701 Drilled Shafts]]'''
 
 
12/2/13:  References to limestone and other rock were clarified. Compressive strengths were identified in the guidance.
 

Revision as of 09:59, 30 January 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Seasonal Maintc. Worker Rocky Olbrey clears right of way along Rte. 43 north of Seneca while Sr. Maintc. Worker Mike Christenson follows in a protection truck.
While preparing for a pipe-replacement project on Rte. 179, MODOT workers discovered a late 1920s or early 1930s-era wooden box culvert. The drainage structure is believed to be the last of its kind on central Missouri highways.
MoDOT's Construction Budget

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Employees from the joint venture of Walsh-Alberici pour the drilled shaft for a bridge column of the new I-64 Daniel Boone Bridge over the Missouri River. The project will have all the traffic in their final positions by October 2015. In late 2015, the current westbound bridge, built in 1935, will be removed.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late January, the numbers of hits are:
20. EPG 751.5, 88168 10. EPG 200, 131684
19. EPG 136.9, 90365 9. EPG 136.12, 139535
18. EPG 136.4, 91266 8. EPG 101, 143641
17. EPG 400, 92620 7. EPG 616.23, 158244
16. EPG 134, 92651 6. EPG 600, 164646
15. EPG 903.6, 92785 5. EPG 100, 199952
14. EPG 751.40, 95886 4. EPG 700, 206732
13. EPG 620.2, 100514 3. EPG 900, 225272
12. EPG 903, 110578 2. EPG 751, 242316
11. EPG 616, 130594 1. EPG Main Page, 1417834

EPG 127.13.9 Reasonableness

1/30/14: Mandatory Reasonableness Factor #3 was clarified to state that "Noise abatement measures must provide...a minimum of 7 dBA for 67 percent of benefitted first-row receptors."

EPG 751.10 General Superstructure

1/29/14: In order to provide a taller joint filler on various P/S girders to reduce costly girder steps: P/C P/S panel deck cantilever reinforcement details was added in EPG 751.10.1.7.2; Deck joint guidance was expanded in EPG 751.10.1.12; and joint filler dimensions were revised in EPG 751.10.2.1.

Standard Detailing Note C2a.3

1/29/14: This note was revised so that "to the nearest inch" is now underlined.

EPG 134.4 Contract Approval, Execution and Distribution

1/27/14: A note was added to remind project managers and contract administrators to get funds obligated prior to issuing a Notice to Proceed.

Bridge Memorandums

1/24/14: Bridge Memo guidance has been expanded and clarified in both EPG 751.1.2.17 Bridge Memorandums and EPG 751.1.3.1 Overview.

Concrete Mix Design Creation QRG

1/22/14: This QRG was updated to reflect previous spec and organization changes.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts

1/21/14: Guidance for the MOU process has been updated to reflect that all MOUs are now federally funded.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

1/13/14: Best management practices (BMPs) have been both altered and removed. MoDOT will no longer utilize the nomenclature "Type I" and "Type II" ditch checks, but will utilize "Rock Ditch Check" and "Alternate Ditch Check". Please familiarize yourself with the newly revised SWPPP guidance.

EPG 950 Automated Traffic Enforcement

1/10/14: There have been numerous clarifications in this article as well as the addition of new guidance for established practices (such as EPG 950.2.2 Automated Speed Enforcement by a Law Enforcement Officer).

MAP-21's Transportation Alternatives Program (TAP)

1/9/14: New LPA guidance, EPG 136.3.18 Transportation Alternatives Program (TAP), is now available. TAP includes the pre-MAP-21 programs of Transportation Enhancements, Recreational Trails, Safe Routes to School and Scenic Byways.

Driving Pile to Rock

1/7/14: Driving pile to rock criteria has been clarified. Much of EPG 702 Load-Bearing Piles has been re-written to reflect the requirement of pile point reinforcement on all piles driven to bear on rock and the elimination of the 75% hammer efficiency requirement for single acting diesel hammers. EPG 751.36.2 Steel Pile was also revised to reflect this established practice.

IRI Data Entry

1/7/14: Additional guidance is now available for IRI data entry in EPG 106.3.2.59.3.1 Segment Smoothness.

LEFT TURN YIELD ON FLASHING ARROW Sign

1/7/14: Guidance in EPG 903.5.30 Traffic Signal Signs has been updated to show this sign is no longer a special sign but is now identified as R10-27a.

Waterjetting

1/3/14: New waterjetting guidance to reflect established practice has been added to EPG 751.36.

Flourescent Yellow-Green Signs

1/3/14: In Table 903.2.20.2 Common Uses of Sign Background Colors, flourescent yellow-green was removed as a color choice from pedestrian and bicycle warning signs. MoDOT reserves yellow-green for school signs only to make school signs stand out.

Cast In Place Standard Detailing Notes

1/3/14: In A1.2, a note was added for CIP steel pipe pile design stresses. In G5 and G6, CIP pile and as-built foundation notes were updated.

EPG 751.1.3.3 Railing Type, Height and Guidelines for Curb Blockouts

12/31/13: EPG 751.1.3.3 was re-titled and re-written to reflect current practice. A handy new table, Common Bridge Rails is also now provided.

Job Order Contracting (JOC)

12/26/13: A new JOC that combines the use of guardrail and guard cable has been added.

Bridge Numbering Guidelines with Examples

12/20/13: Guidance about the bridge numbering system has been revised to match current practice.

Table 903.7 Guide Sign Sizes

12/17/13: Numerous sign dimensions have been revised in this table.

EPG 751.1.4.2 Types of Walls

12/16/13: Aesthetic enhancement guidance was clarified to encourage form liners and concrete stains.

Milestones QRG

12/5/13: This QRG has been updated.

EPG 133.4.6 Statewide Winter Road Condition Report

12/5/13: Guidance of the road condition terminology has been clarified.

Job Order Contracting (JOC)

12/3/13: The new Guardrail and Guard Cable JSP templates are now available in the template listing.

EPG 643.2 Local Utility Adjustments - Public and Private

12/3/13: Guidance in several locations of this article was updated to reflect that pre-audits are no longer conducted for consultant or utility contracts.