Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (new photos)
m
Line 28: Line 28:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2"|  [[image:Main Page Feb 4a, 2014.jpg|center|390px|thumb|<center>'''  Chief Engineer Ed Hassinger, Distr. Engineer David Silvester and Asst. Distr. Engineer Travis Koestner were joined by (L to R, below) Asst. Maintc. Supervisor Pedro Chaidez, Maintc. Superintendent Mike Belt and Maintc. Supervisors Kyle Fischer and Jim William on the floor of the capitol as the [http://www.house.mo.gov/ 97th General Assembly] commended MoDOT for our response to recent winter storms.''' <br/> [[image:Main Page Feb 4b, 2014.jpg|center|390px]]  </center>]]
+
|colspan="2"|  [[image:Main Page Feb 4a, 2014.jpg|center|390px|thumb|<center>'''  Chief Engineer Ed Hassinger, Distr. Engineer David Silvester and Asst. Distr. Engineer Travis Koestner were joined by (L to R, below) Asst. Maintc. Supervisor Pedro Chaidez, Maintc. Superintendent Mike Belt and Maintc. Supervisors Kyle Fischer and Jim Williams on the floor of the capitol as the [http://www.house.mo.gov/ 97th General Assembly] commended MoDOT for our response to recent winter storms.''' <br/> [[image:Main Page Feb 4b, 2014.jpg|center|390px]]  </center>]]
 
|-
 
|-
 
|colspan="2"|  [[image:Main Page Feb 4, 2014.jpg|center|390px|thumb|<center>'''  Gov. Nixon shakes hands with Sr. Maintc. Worker Debbie Rodriguez as she prepares for this week's snow fight.  '''</center>]]
 
|colspan="2"|  [[image:Main Page Feb 4, 2014.jpg|center|390px|thumb|<center>'''  Gov. Nixon shakes hands with Sr. Maintc. Worker Debbie Rodriguez as she prepares for this week's snow fight.  '''</center>]]

Revision as of 11:56, 4 February 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Chief Engineer Ed Hassinger, Distr. Engineer David Silvester and Asst. Distr. Engineer Travis Koestner were joined by (L to R, below) Asst. Maintc. Supervisor Pedro Chaidez, Maintc. Superintendent Mike Belt and Maintc. Supervisors Kyle Fischer and Jim Williams on the floor of the capitol as the 97th General Assembly commended MoDOT for our response to recent winter storms.
Main Page Feb 4b, 2014.jpg
Gov. Nixon shakes hands with Sr. Maintc. Worker Debbie Rodriguez as she prepares for this week's snow fight.
Main Page Jan 30a, 2014.jpg
The third and final span of the old Hurricane Deck Bridge at the Lake of the Ozarks has been demolished.
Main Page Jan 30b, 2014.jpg
Main Page Jan 30c, 2014.jpg

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Seasonal Maintc. Worker Rocky Olbrey clears right of way along Rte. 43 north of Seneca while Sr. Maintc. Worker Mike Christenson follows in a protection truck.
Perhaps you've wondered how many hits the most popular EPG articles have. As of early February, the numbers of hits are:
20. EPG 751.5, 88597 10. EPG 200, 131844
19. EPG 136.9, 90521 9. EPG 136.12, 140560
18. EPG 136.4, 91464 8. EPG 101, 144385
17. EPG 400, 92703 7. EPG 616.23, 158722
16. EPG 903.6, 92948 6. EPG 600, 164863
15. EPG 134, 93076 5. EPG 100, 200258
14. EPG 751.40, 96476 4. EPG 700, 207106
13. EPG 620.2, 100718 3. EPG 900, 225615
12. EPG 903, 110766 2. EPG 751, 243013
11. EPG 616, 130786 1. EPG Main Page, 1423079

New QRG

2/4/14: Moving Files from SharePoint to CIA details how the project office is to move quality management documentation from the external SharePoint to the appropriate folder on V:\Contract Information Archive.

Subcontracts QRG

1/31/14: This QRG has been clarified.

EPG 127.13.9 Reasonableness

1/30/14: Mandatory Reasonableness Factor #3 was clarified to state that "Noise abatement measures must provide...a minimum of 7 dBA for 67 percent of benefitted first-row receptors."

EPG 751.10 General Superstructure

1/29/14: In order to provide a taller joint filler on various P/S girders to reduce costly girder steps: P/C P/S panel deck cantilever reinforcement details was added in EPG 751.10.1.7.2; Deck joint guidance was expanded in EPG 751.10.1.12; and joint filler dimensions were revised in EPG 751.10.2.1.

Standard Detailing Note C2a.3

1/29/14: This note was revised so that "to the nearest inch" is now underlined.

EPG 134.4 Contract Approval, Execution and Distribution

1/27/14: A note was added to remind project managers and contract administrators to get funds obligated prior to issuing a Notice to Proceed.

Bridge Memorandums

1/24/14: Bridge Memo guidance has been expanded and clarified in both EPG 751.1.2.17 Bridge Memorandums and EPG 751.1.3.1 Overview.

Concrete Mix Design Creation QRG

1/22/14: This QRG was updated to reflect previous spec and organization changes.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts

1/21/14: Guidance for the MOU process has been updated to reflect that all MOUs are now federally funded.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

1/13/14: Best management practices (BMPs) have been both altered and removed. MoDOT will no longer utilize the nomenclature "Type I" and "Type II" ditch checks, but will utilize "Rock Ditch Check" and "Alternate Ditch Check". Please familiarize yourself with the newly revised SWPPP guidance.

EPG 950 Automated Traffic Enforcement

1/10/14: There have been numerous clarifications in this article as well as the addition of new guidance for established practices (such as EPG 950.2.2 Automated Speed Enforcement by a Law Enforcement Officer).

MAP-21's Transportation Alternatives Program (TAP)

1/9/14: New LPA guidance, EPG 136.3.18 Transportation Alternatives Program (TAP), is now available. TAP includes the pre-MAP-21 programs of Transportation Enhancements, Recreational Trails, Safe Routes to School and Scenic Byways.

Driving Pile to Rock

1/7/14: Driving pile to rock criteria has been clarified. Much of EPG 702 Load-Bearing Piles has been re-written to reflect the requirement of pile point reinforcement on all piles driven to bear on rock and the elimination of the 75% hammer efficiency requirement for single acting diesel hammers. EPG 751.36.2 Steel Pile was also revised to reflect this established practice.

IRI Data Entry

1/7/14: Additional guidance is now available for IRI data entry in EPG 106.3.2.59.3.1 Segment Smoothness.

LEFT TURN YIELD ON FLASHING ARROW Sign

1/7/14: Guidance in EPG 903.5.30 Traffic Signal Signs has been updated to show this sign is no longer a special sign but is now identified as R10-27a.

Waterjetting

1/3/14: New waterjetting guidance to reflect established practice has been added to EPG 751.36.

Flourescent Yellow-Green Signs

1/3/14: In Table 903.2.20.2 Common Uses of Sign Background Colors, flourescent yellow-green was removed as a color choice from pedestrian and bicycle warning signs. MoDOT reserves yellow-green for school signs only to make school signs stand out.

Cast In Place Standard Detailing Notes

1/3/14: In A1.2, a note was added for CIP steel pipe pile design stresses. In G5 and G6, CIP pile and as-built foundation notes were updated.

EPG 751.1.3.3 Railing Type, Height and Guidelines for Curb Blockouts

12/31/13: EPG 751.1.3.3 was re-titled and re-written to reflect current practice. A handy new table, Common Bridge Rails is also now provided.

Job Order Contracting (JOC)

12/26/13: A new JOC that combines the use of guardrail and guard cable has been added.

Bridge Numbering Guidelines with Examples

12/20/13: Guidance about the bridge numbering system has been revised to match current practice.

Table 903.7 Guide Sign Sizes

12/17/13: Numerous sign dimensions have been revised in this table.

EPG 751.1.4.2 Types of Walls

12/16/13: Aesthetic enhancement guidance was clarified to encourage form liners and concrete stains.

Milestones QRG

12/5/13: This QRG has been updated.

EPG 133.4.6 Statewide Winter Road Condition Report

12/5/13: Guidance of the road condition terminology has been clarified.