New pages
Jump to navigation
Jump to search
3 September 2026
- 17:0717:07, 3 September 2026 909.3 Congested Route (Recurring Delays) (hist | edit) [26,928 bytes] Hoskir (talk | contribs) (created page per rr4165)
24 July 2026
- 15:5815:58, 24 July 2026 134.1 Introduction (hist | edit) [11,573 bytes] Hoskir (talk | contribs) (moved 134.1 to its own page)
- 15:1015:10, 24 July 2026 134.2 Solicitation and Selection Process (hist | edit) [37,877 bytes] Hoskir (talk | contribs) (moved 134.2 to new page)
- 13:2713:27, 24 July 2026 134.3 Consultant Contract Negotiation (hist | edit) [18,529 bytes] Hoskir (talk | contribs) (134.3 moved to its own page)
- 13:1313:13, 24 July 2026 134.6 Dispute Resolution (hist | edit) [8,532 bytes] Hoskir (talk | contribs) (moved 134.6 to its own page)
- 12:5212:52, 24 July 2026 134.4 Contract Approval, Execution and Distribution (hist | edit) [5,365 bytes] Hoskir (talk | contribs) (moved 134.4 to its own page)
- 12:4412:44, 24 July 2026 134.5 Consultant Contract Administration (hist | edit) [24,374 bytes] Hoskir (talk | contribs) (moved 134.5 to its own page)
21 July 2026
- 13:2513:25, 21 July 2026 236.19 Dedication of Thoroughfares (hist | edit) [4,278 bytes] Hoskir (talk | contribs) (added new article per RR4230)
15 July 2026
- 09:0409:04, 15 July 2026 130.1 Discussion (hist | edit) [6,221 bytes] Hoskir (talk | contribs) (moved 130.1 to its own page and updated formatting)
- 08:3808:38, 15 July 2026 130.2 Design Phase Value Engineering (hist | edit) [15,079 bytes] Hoskir (talk | contribs) (moved 130.2 to its own page and updated some formatting)
14 July 2026
- 16:0116:01, 14 July 2026 130.3 Post-Award Value Engineering (PAVE) (hist | edit) [2,748 bytes] Hoskir (talk | contribs) (moved 130.3 to its own page)
- 15:5515:55, 14 July 2026 130.4 Value Engineering Change Proposals (hist | edit) [748 bytes] Hoskir (talk | contribs) (moved 130.4 to its own page)
- 15:5415:54, 14 July 2026 130.5 NEPA Considerations (hist | edit) [1,123 bytes] Hoskir (talk | contribs) (moved 130.5 to its own page)
- 15:3215:32, 14 July 2026 129.1 Environmental Justice, ADA, LEP and Title VI (hist | edit) [5,283 bytes] Hoskir (talk | contribs) (moved 129.1 to its own page)
- 15:2315:23, 14 July 2026 129.2 The Public Involvement Plan (PIP)/Communication Plan (hist | edit) [4,505 bytes] Hoskir (talk | contribs) (moved 129.2 to its own page)
9 July 2026
- 12:5112:51, 9 July 2026 106.3.2.100 TM-100, Procedure to Calculate the Slope Ratio (SR) and Stripping Inflection Point (SIP) using the Hamburg Wheel-Track (HWT) Test (hist | edit) [5,520 bytes] Hoskir (talk | contribs) (Created page with "<div style="float: right; width: 550px; margin-top: 5px; margin-left: 30px; margin-bottom: 30px;">__TOC__</div> ==106.3.2.100.1 Run the HWT test in accordance with AASHTO T 324 at 50 +/- 1 ยบ C for 20,000 passes (regardless of the mix type and contract binder grade)== Record rut depth at each cycle or at regular cycle intervals during the test. ==106.3.2.100.2 Plot the average rut depth versus number of cycles up to the 20,000 passes== Create a graph using Hamburg Test...")