User contributions
Jump to navigation
Jump to search
- 12:50, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report a.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report a.pdf current
- 12:49, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 13 to 15.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 13 to 15.pdf current
- 12:38, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 12 to 14.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 12 to 14.pdf current
- 12:36, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 11 to 13.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 11 to 13.pdf current
- 12:31, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 10 to 12.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 10 to 12.pdf current
- 12:29, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 09 to 12.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 09 to 12.pdf current
- 12:27, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 08 to 10.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 08 to 10.pdf current
- 11:26, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 07 to 09.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 07 to 09.pdf current
- 11:25, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 06 to 08.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 06 to 08.pdf current
- 11:24, 23 July 2018 diff hist 0 File:104.2 Project Scoping Process.pdf EPGsysop uploaded a new version of File:104.2 Project Scoping Process.pdf
- 11:21, 23 July 2018 diff hist 0 File:102.2 CPQ.pdf EPGsysop uploaded a new version of File:102.2 CPQ.pdf current
- 11:21, 23 July 2018 diff hist 0 File:101 Request for Transfer of Inpsected Materials.pdf EPGsysop uploaded a new version of File:101 Request for Transfer of Inpsected Materials.pdf current
- 11:20, 23 July 2018 diff hist 0 File:101 Producer Supplier List.pdf EPGsysop uploaded a new version of File:101 Producer Supplier List.pdf current
- 11:19, 23 July 2018 diff hist 0 File:101 No Rise Certificate 2017.pdf EPGsysop uploaded a new version of File:101 No Rise Certificate 2017.pdf current
- 11:16, 23 July 2018 diff hist 0 File:101 No Rise Certificate 2015.pdf EPGsysop uploaded a new version of File:101 No Rise Certificate 2015.pdf current
- 11:03, 23 July 2018 diff hist 0 File:101 Maintenance - Commuter Lot Survey.pdf EPGsysop uploaded a new version of File:101 Maintenance - Commuter Lot Survey.pdf
- 11:01, 23 July 2018 diff hist 0 File:101 Maintenance - blankinspreport.pdf EPGsysop uploaded a new version of File:101 Maintenance - blankinspreport.pdf
- 10:58, 23 July 2018 diff hist 0 File:101 Land Disturbance Inspection QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Inspection QRG.pdf current
- 10:57, 23 July 2018 diff hist 0 File:101 Land Disturbance Initial Setup QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Initial Setup QRG.pdf current
- 10:38, 23 July 2018 diff hist 0 File:101 Land Disturbance Deficiency QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Deficiency QRG.pdf
- 08:07, 23 July 2018 diff hist +4 m Category:753 Bridge Inspection Rating Per BR, updated contact info
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application Oct 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application Oct 2015.pdf current
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application 2015.pdf current
- 07:37, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application.pdf current
- 07:36, 23 July 2018 diff hist 0 File:101 Affidavit for Compliance with Prevailing Wage.pdf EPGsysop uploaded a new version of File:101 Affidavit for Compliance with Prevailing Wage.pdf current
- 08:56, 19 July 2018 diff hist -5,741 Help Article
- 08:54, 19 July 2018 diff hist -5,067 Main Page
- 13:52, 29 June 2018 diff hist +93 m Main Page EPG 618
- 13:51, 29 June 2018 diff hist +4,418 m Category:618 Mobilization Per CM, new guidance clarifies how REs should always have been administering payment for Mobilization according to the current spec
- 15:15, 28 June 2018 diff hist 0 m Main Page
- 15:00, 28 June 2018 diff hist 0 N File:402 CLC Contractor June 2018.pdf
- 15:00, 28 June 2018 diff hist +5 m Category:402 Bituminous Surface Leveling minor correction
- 14:29, 28 June 2018 diff hist 0 N File:Main Page June 28, 2018.jpg current
- 14:29, 28 June 2018 diff hist +417 m Main Page
- 13:03, 28 June 2018 diff hist +68 m Main Page EPG 236.7.5.4
- 12:30, 28 June 2018 diff hist +1,184 m 236.7 Negotiation →236.7.5.4 Acquisition from State of Missouri Agencies: Per RW, clarified when we acquire property from the State of MO, specifically, the Univ. of MO and Dept. of Conservation
- 15:08, 27 June 2018 diff hist +81 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review: Per RW, further clarified guidance
- 10:10, 27 June 2018 diff hist 0 m 751.1 Preliminary Design Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.3 Drilling Operations Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:08, 27 June 2018 diff hist 0 N File:751.1.2.20 Request Jun 2018.xlsx current
- 10:07, 27 June 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 14:27, 26 June 2018 diff hist +121 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.6 Civil Geometry Report: Per CADD, updated reference to document used to produce the Civil Geometry Report. The archaic "MoDOTCivilGeometry Report" was replaced.
- 10:25, 26 June 2018 diff hist -121 m Main Page EPG 238.2.17
- 08:32, 26 June 2018 diff hist +162 m 238.2 Land Surveying Per RW, clarified EPG 238.2.17 with current business practices. Updated Exhibit A - legal descriptions-survey approval and Form 238.2.18.2 Plat Review Checklist.
- 13:17, 22 June 2018 diff hist +1 m Main Page
- 09:28, 22 June 2018 diff hist -5 m Category:134 Engineering Professional Services →134.1.1 Federal Law: updated broken CFR 172.3 link
- 10:28, 21 June 2018 diff hist 0 N File:127.25.2.1 Hazardous June 2018.docx current
- 10:27, 21 June 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per Env'l, updated "Hazardous Materials Response Plan" document
- 08:58, 21 June 2018 diff hist -3 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, updated " checklist of the jobsite posters" link
- 08:43, 21 June 2018 diff hist +12 m Category:101 Standard Forms →Construction and Materials: Per CM, retitled all of the On-Call spreadsheets to begin with JOC. Updated their links. Added new Microsurfacing JOC.
- 12:42, 19 June 2018 diff hist -6 m 606.1 Guardrail →606.1.3.5.1 Closures of Existing Streets and Roads: Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT.
- 12:40, 19 June 2018 diff hist 0 N File:616.8.8a MT 2018.pdf current
- 12:39, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H)
- 12:37, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT. A reference to EPG 606.1.3.5 was added to TA-8a.
- 11:14, 15 June 2018 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added On-Call Lighting Repair Job Order
- 09:16, 15 June 2018 diff hist +22 m 236.7 Negotiation →236.7.6.3 Acquisition Procedure: updated link
- 09:15, 15 June 2018 diff hist -54 m 236.4 Description Writing and Titles →236.4.4.8 Obtaining Title Insurance: Per RW, clarified EPG 236.4.4.8 Obtaining Title Insurance with guidance reflecting current title commitment business practices.
- 08:21, 15 June 2018 diff hist -2 m Main Page
- 08:13, 14 June 2018 diff hist +47 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added pay item
- 15:10, 13 June 2018 diff hist +98 m Category:751 LRFD Bridge Design Guidelines Per BR, guidance about specs for designing retaining walls to long-established current standards
- 09:17, 13 June 2018 diff hist +81 m Category:751 LRFD Bridge Design Guidelines Per BR, updated link to report
- 13:22, 11 June 2018 diff hist +197 m Category:321 Geotechnical Engineering Per Geotech, updated some FHWA reference documents
- 09:52, 11 June 2018 diff hist -62 m 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA) Per TP, updated Long-Range Plan link
- 09:49, 11 June 2018 diff hist -14 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated Long-Range Plan links
- 12:13, 7 June 2018 diff hist 0 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.3 Quantity Sheet Procedure (Column Headings): corrected link
- 11:27, 7 June 2018 diff hist +266 m 616.22 Advanced Work Zone Training Per WZQC, updated training link
- 11:25, 7 June 2018 diff hist +107 m 616.21 Work Zone Technician Training Per WZQC, updated training link
- 14:27, 6 June 2018 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 14:27, 6 June 2018 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 14:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf current
- 14:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:47, 6 June 2018 diff hist 0 m Main Page
- 13:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf current
- 13:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:31, 5 June 2018 diff hist -5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:30, 5 June 2018 diff hist -10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:28, 5 June 2018 diff hist -5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf current
- 13:27, 5 June 2018 diff hist -2 m 237.9 Submission of Plans and Supporting Documents
- 13:26, 5 June 2018 diff hist -8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:41, 5 June 2018 diff hist -239 m Main Page EPG 751.11.2.1
- 10:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
- 15:17, 1 June 2018 diff hist +4 m Main Page
- 11:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:47, 1 June 2018 diff hist +2 Main Page
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals