User contributions
Jump to navigation
Jump to search
- 14:58, 16 June 2017 diff hist +92 m Main Page
- 14:52, 16 June 2017 diff hist -8 m 751.6 General Quantities →751.6.2.17 Excavation
- 14:29, 16 June 2017 diff hist -3 m Main Page
- 14:27, 16 June 2017 diff hist +36 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:41, 16 June 2017 diff hist -5 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems
- 12:33, 16 June 2017 diff hist +11 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:32, 16 June 2017 diff hist -66 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:30, 16 June 2017 diff hist +57 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 10:42, 16 June 2017 diff hist -33 m Main Page EPG 751.22.3.15
- 10:38, 16 June 2017 diff hist +222 m 751.9 LFD Seismic Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 10:32, 16 June 2017 diff hist 0 m 751.9 LFD Seismic
- 10:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 10:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg current
- 10:22, 16 June 2017 diff hist -33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 08:58, 16 June 2017 diff hist -9 m Main Page EPG 606.1
- 08:58, 16 June 2017 diff hist +32 m 606.1 Guardrail
- 08:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx
- 08:49, 16 June 2017 diff hist +2 m 606.1 Guardrail
- 08:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls