- 10:39, 11 May 2018 diff hist +268 m Main Page EPG 110.2
- 10:30, 11 May 2018 diff hist +406 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, added three Federal Aid Projects posters
- 14:56, 10 May 2018 diff hist +22 m 751.14 Steel Superstructure →751.14.5.9 Weathering Steel
- 14:54, 10 May 2018 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements
- 08:07, 10 May 2018 diff hist 0 N File:101 Floodplain Development Permit Application May 2018.pdf current
- 08:07, 10 May 2018 diff hist +4 m Category:101 Standard Forms Per BR, minor correction to Floodplain Development Permit Application
- 13:24, 9 May 2018 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements
- 13:23, 9 May 2018 diff hist -1,251 m Main Page EPG 110.3.4
- 12:29, 9 May 2018 diff hist +920 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, new guidance about the DOL's PW-2 form agreed to by DOL
- 08:48, 9 May 2018 diff hist -34 m Main Page EPG 231.4
- 08:46, 9 May 2018 diff hist +421 m 231.4 Shoulder Width →231.4.1 Introduction: Per DE, revised guidance about guardrail placement from the edge of the shoulder to bring guidance in line with Std Plan 606.00.
- 12:38, 7 May 2018 diff hist 0 m Main Page
- 11:16, 7 May 2018 diff hist 0 N File:Main Page May 7, 2018.jpg current
- 11:16, 7 May 2018 diff hist -35 m Main Page
- 08:17, 4 May 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.5 Electronic Information for Bidder’s Automation: Per Bidding and Contracts, minor correction
- 07:25, 4 May 2018 diff hist 0 N File:910 TSMO.pdf current
- 07:24, 4 May 2018 diff hist +43 m Category:910 Intelligent Transportation Systems Per TS, added TSM&O info
- 15:22, 3 May 2018 diff hist -1 m 751.1 Preliminary Design →751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating
- 13:36, 3 May 2018 diff hist +34 m Main Page
- 13:33, 3 May 2018 diff hist 0 N File:Main Page Apr 3, 2018.gif current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3a, 2018.jpg current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3b, 2018.jpg current
- 13:32, 3 May 2018 diff hist +752 m Main Page
- 10:51, 3 May 2018 diff hist +179 m Main Page EPG 751.1.3.9
- 10:30, 3 May 2018 diff hist +2,950 m 751.1 Preliminary Design Per BR, new bridge preliminary design guidance for how to assess asbestos and lead considerations for structure removal, rehabs and recoatings and how to address these considerations on Bridge Memo
- 11:16, 2 May 2018 diff hist -355 m Main Page EPG 237.14.3.6
- 07:33, 2 May 2018 diff hist +810 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, clarified guidance
- 12:06, 1 May 2018 diff hist +152 m 238.3 Route Surveying →238.3.36.3.3 Field Notebooks: Per BR, corrected error
- 11:17, 1 May 2018 diff hist -1 m Main Page
- 09:21, 1 May 2018 diff hist +150 m Category:747 Bridge Reports and Layouts
- 13:45, 30 April 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, minor correction
- 13:39, 30 April 2018 diff hist -238 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:10, 30 April 2018 diff hist +346 m Main Page EPG 236.16
- 09:04, 30 April 2018 diff hist -2,351 m 236.16 Outdoor Advertising Per Outdoor Advertising, several revisions due to Administrative Rule Revisions
- 08:30, 30 April 2018 diff hist -7 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, minor updates
- 11:24, 27 April 2018 diff hist -149 Main Page
- 11:19, 27 April 2018 diff hist 0 N File:Main Page Apr 27, 2018.jpg current
- 11:18, 27 April 2018 diff hist -116 m Main Page
- 10:29, 27 April 2018 diff hist +99 m 102.2 Contractor Performance Rating System →102.2.7 Performance Discussion: Per CM, guidance for when certified mail is necessary for the Contractor Performance Rating replaced older guidance.
- 13:34, 26 April 2018 diff hist -643 m Main Page
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Non-integral 1 2018.jpg current
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Integral 1 2018.jpg current
- 15:18, 25 April 2018 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: Per BR, corrected dimensions for K5-K8 bars placed in end bent wings and extending into bridge barrier.
- 14:30, 25 April 2018 diff hist -688 m Main Page EPG 751.50
- 14:27, 25 April 2018 diff hist +410 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, new std detailing note about deviations in galvanized pile penetration
- 08:40, 25 April 2018 diff hist -263 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.9 Lane Reduction Transition Markings (MUTCD Section 3B.09): Per TS, deleted Fig. 620.2.9.3 since Fig. 620.2.9.1 already covers Fig. 620.2.9.3's critical concepts.
- 08:27, 24 April 2018 diff hist +9 m Category:403 Asphaltic Concrete Pavement →403.1.18 Quality Assurance (Sec 403.18)
- 15:20, 23 April 2018 diff hist +1 m Main Page
- 09:12, 23 April 2018 diff hist +9 Category:1091 Lighting Equipment
- 09:11, 23 April 2018 diff hist -9 Category:1091 Lighting Equipment
- 09:09, 23 April 2018 diff hist 0 Category:1091 Lighting Equipment
- 11:08, 20 April 2018 diff hist +38 m Category:130 Value Engineering →130.2 Value Engineering Change Proposals: Per EPS, updated link
- 14:52, 16 April 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 12:51, 16 April 2018 diff hist -936 m Main Page EPG 903.4.6
- 12:48, 16 April 2018 diff hist +70 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 12:24, 16 April 2018 diff hist +257 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses: Per BR and TS, corrected verbiage that has caused complexities. MoDOT may be the designer and if not, others will submit signed & sealed dwgs.
- 10:24, 16 April 2018 diff hist +412 m Category:235 Preliminary Plans →235.8.2 FAA’s Notice Criteria Tool: Per Bidding and Contract, additional guidance for core teams on appropriately considering the max equipment height for construction projects involving airports
- 13:59, 13 April 2018 diff hist -10 m Main Page EPG 751.50
- 12:34, 13 April 2018 diff hist +2,646 751.50 Standard Detailing Notes Per BR, new clarifying note D1.5; archaic option in D1.21 replaced with current option; new H9.29 for 2 thrie beam std dwgs
- 07:45, 13 April 2018 diff hist 0 m 949.2 Speed Limit Guidelines →949.2.3 Additional Guidelines for Establishing Speed Limits: Per TS, minor clarification
- 12:56, 11 April 2018 diff hist -566 m Main Page EPG 751.8
- 12:51, 11 April 2018 diff hist 0 N File:751.8.3.4.jpg current
- 12:50, 11 April 2018 diff hist +1,473 m 751.8 LRFD Concrete Box Culverts Per BR, added guidance for culvert wing walls on rock.
- 08:01, 11 April 2018 diff hist +60 m 127.25 Maintenance Environmental Policies
- 07:57, 11 April 2018 diff hist -192 m 127.25 Maintenance Environmental Policies Per Env'l, updated several links
- 12:53, 10 April 2018 diff hist +10 m Main Page EPG 110.1
- 11:28, 10 April 2018 diff hist +715 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 11:17, 10 April 2018 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:16, 10 April 2018 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:15, 10 April 2018 diff hist +269 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects
- 11:11, 10 April 2018 diff hist +437 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects.
- 09:30, 10 April 2018 diff hist -2 m 751.6 General Quantities →751.6.1 Index of Quantities
- 09:06, 10 April 2018 diff hist +189 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added Open Cell Foam Joint System pay items
- 13:05, 9 April 2018 diff hist -193 m Main Page EPG 127.29.7
- 13:01, 9 April 2018 diff hist +695 127.29 Stormwater →127.29.7 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, added guidance per permit agreement with MDNR.
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6c, 2018.jpg current
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6b, 2018.gif current
- 14:36, 6 April 2018 diff hist 0 Main Page
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6a, 2018.jpg current
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6, 2018.jpg current
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5
- 09:07, 5 April 2018 diff hist +2,610 Category:749 Hydrologic Analysis Per BR, revised Time of Concentration equation guidance by providing optional combination of Kirby-Hathaway & Kirpich equations and adding the optional low slope factor presented in the new research.
- 15:26, 4 April 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 15:19, 4 April 2018 diff hist +53 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms: Per CADD, minor revisions to glossary terms
- 15:10, 4 April 2018 diff hist +12 m Category:747 Bridge Reports and Layouts Per BR, Bridge Survey Report further edited
- 15:09, 4 April 2018 diff hist +6 m 238.3 Route Surveying
- 15:08, 4 April 2018 diff hist +6 m Category:101 Standard Forms
- 15:07, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report April 2018.docx current
- 15:07, 4 April 2018 diff hist +6 m Main Page
- 14:34, 4 April 2018 diff hist -311 m Main Page Bridge Survey Report
- 14:29, 4 April 2018 diff hist -41 m Category:101 Standard Forms →Bridge: Per BR, updated Bridge Survey Report