User contributions
Jump to navigation
Jump to search
- 11:28, 27 March 2024 diff hist +874 751.36 Driven Piles →751.36.5.11 Check Pile Drivability: updated per RR3857
- 11:06, 27 March 2024 diff hist +129 751.36 Driven Piles →751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857
- 11:05, 27 March 2024 diff hist +91 751.36 Driven Piles →751.36.5.7.2.1 Design Values for Individual HP Pile: updated per RR3857
- 10:28, 27 March 2024 diff hist +22 m 751.1 Preliminary Design →751.1.2.22 Types of Piling: updated formatting current
- 10:25, 27 March 2024 diff hist -2 751.36 Driven Piles →751.36.5.7.1.1 Design Values for Individual HP Pile: updated per RR3857
- 10:14, 27 March 2024 diff hist +1,417 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn): updated per RR3857
- 10:00, 27 March 2024 diff hist +27 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout: updated formatting on table
- 09:58, 27 March 2024 diff hist +174 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout: updated per RR3857
- 09:39, 27 March 2024 diff hist +584 751.1 Preliminary Design →751.1.2.22 Types of Piling: updated per RR3857
- 09:24, 27 March 2024 diff hist +136 m 320.4 Procedure for Final Sounding updated link to Request for Final Soundings current
- 09:17, 27 March 2024 diff hist +68 m 320.3 Drilling Operations updated link to Request for Final Soundings current
- 09:13, 27 March 2024 diff hist +82 m 751.1 Preliminary Design moved TOC to right side
- 09:12, 27 March 2024 diff hist +259 m 751.1 Preliminary Design →751.1.2.19 Soundings (Borings): updated link to Request for Final Soundings
- 08:58, 27 March 2024 diff hist +34 m Category:101 Standard Forms →Bridge: updated link to Request for Final Soundings
- 08:50, 27 March 2024 diff hist +66 m Category:747 Bridge Reports and Layouts →747.2.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: updated link to request for final soundings current
- 13:28, 26 March 2024 diff hist 0 m Category:134 Engineering Professional Services →134.2.2.3 Solicitation and Selection Step 3 – Central Office Review of Solicitation Request: updated per email from Michelle N. current
- 12:34, 26 March 2024 diff hist -2 m Job Special Provisions fixed link to JSP2401
- 12:22, 26 March 2024 diff hist +213 Category:139 Design - Build →139.9.2 Contract Invoicing and Payment: updated per RR3856 current
- 12:09, 26 March 2024 diff hist +117 236.10 Right Of Way Condemnation →236.10.7.3 Alternative Location Proposals (RSMo 523.265): updated per RR3855 current
- 12:07, 26 March 2024 diff hist +117 Category:235 Preliminary Plans →235.6 Approval of Preliminary Plan: updated per RR3855 current