User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:07, 18 February 2021 diff hist +122 m LPA:136.13 LPA Policy Changes Fig. 136.3.20, BEAP Project Tracking Form
- 11:05, 18 February 2021 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20 BEAP Project Tracking Form
- 11:04, 18 February 2021 diff hist 0 N File:Fig.136.3.20 2021.docx
- 11:03, 18 February 2021 diff hist -10 m LPA:136.3 Federal Aid Basics Per BR, minor revisions for Fig. 136.3.20, BEAP Project Tracking Form
- 09:18, 18 February 2021 diff hist -61 m 147.3 Job Order Contracting (JOC) removed errant link
- 08:18, 18 February 2021 diff hist -197 m Recent Policy Changes in the EPG EPG 147.3
- 08:14, 18 February 2021 diff hist +325 m 147.3 Job Order Contracting (JOC) Per DE, FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.
- 13:15, 17 February 2021 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor corrections
- 11:17, 17 February 2021 diff hist +74 m Recent Policy Changes in the EPG EPG 902.5.8.4
- 11:01, 17 February 2021 diff hist +42 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.4 Record Keeping
- 10:58, 17 February 2021 diff hist +144 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8 Responsibility for Operation and Maintenance (MUTCD Section 4D.02): Per TS, new Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:22, 17 February 2021 diff hist 0 N File:902.5.8.3.1 checklist.xlsx current
- 10:20, 17 February 2021 diff hist +133 m Category:101 Standard Forms →Financial Services: Per TS, added Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:16, 17 February 2021 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.36.2 Yellow Change and Red Clearance Intervals (MUTCD Section 4D.26): Per TS, minor correction
- 09:46, 17 February 2021 diff hist +38 m Recent Policy Changes in the EPG EPG 237.13.1
- 09:38, 17 February 2021 diff hist 0 N File:237.13.1 no typical.jpg current
- 09:38, 17 February 2021 diff hist +655 m 237.13 Contract Plan File Name Convention →237.13.1 Design Contract Plans: Per Bid & Contracts, clarified how to name contract plan files when typical sections are not included in the plans
- 09:51, 16 February 2021 diff hist +149 m 231.2 Clear Zones →231.2.1 Introduction: Per TS, minor clarifications current
- 09:24, 11 February 2021 diff hist +60 m Recent Policy Changes in the EPG EPG 127.1.2.1
- 09:21, 11 February 2021 diff hist +23 m 127.1 Request for Environmental Services →127.1.2.1 Location/Conceptual Plan Stage: Per Env'l, clarified that NEPA can be approved at location/conceptual plan stage for simple projects but occurs later for more complicated projects.