- 12:11, 15 February 2022 diff hist 0 N File:751.22.1.2 type 2 2022.jpg current
- 12:10, 15 February 2022 diff hist -4 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor clarification involving rounding and a minor correction for Type 8
- 14:17, 14 February 2022 diff hist +14 m Recent Policy Changes in the EPG EPG 751.1.3.4, EPG 751.12.1.3, EPG 751.12.2
- 14:08, 14 February 2022 diff hist +213 m 751.12 Barriers, Railings, Curbs and Fences Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 13:56, 14 February 2022 diff hist +1,093 m 751.1 Preliminary Design →751.1.3.4 Barrier or Railing Type, Height and Guidelines for Curb Blockouts: Per BR, aligned bridge barrier and railing guidance between EPG 751.1 and 751.12.
- 09:48, 14 February 2022 diff hist -77 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor deletion associated with previous revision
- 09:21, 10 February 2022 diff hist +19 m Recent Policy Changes in the EPG EPG 616.13.2
- 08:37, 10 February 2022 diff hist -37 m 147.3 Job Order Contracting (JOC) →147.3.11 Request to Subcontract Work (Form C-220): Per CM, updated guidance to reflect that as of Jan 3, 2022, MoDOT no longer monitors subcontractor insurance
- 15:52, 9 February 2022 diff hist 0 N File:616.13.2 Directions 2021.pdf current
- 15:51, 9 February 2022 diff hist 0 N File:616.13 WZ Impact 2022.xlsm current
- 15:51, 9 February 2022 diff hist +530 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: Per TS, new version of the Work Zone Impact Analysis Spreadsheet and spreadsheet directions as well as adding in the smart work zone information.
- 14:38, 9 February 2022 diff hist +59 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.2 Interstate, Freeways and Multi-lane Roadways: inserted link
- 14:00, 9 February 2022 diff hist +2 m 237.8 Contract Time
- 13:51, 9 February 2022 diff hist +2 m 237.9 Submission of Plans and Supporting Documents updated Word Day Study to a dotx file
- 13:50, 9 February 2022 diff hist -445 m Category:124 Quality Control / Quality Assurance (QC/QA) Per DE, deleted references to archaic Project Estimate Quality Assurance Report; also updated Work Day Study to a .dotx file
- 13:46, 9 February 2022 diff hist -6 m Category:101 Standard Forms →Design Forms
- 13:45, 9 February 2022 diff hist 0 N File:124 Work Day Study a.dotx current
- 13:45, 9 February 2022 diff hist +2 m Category:101 Standard Forms →Design Forms
- 13:43, 9 February 2022 diff hist 0 m Category:101 Standard Forms →Design Forms
- 13:41, 9 February 2022 diff hist 0 N File:124 Work Day Study.dotx current