User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 16:31, 8 November 2012 diff hist -506 m Main Page E 101
- 16:18, 8 November 2012 diff hist 0 N File:Line Item Adjustments Nov 2012.docx
- 16:18, 8 November 2012 diff hist -5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, added guidance on spreadsheet security messages to the Line Item Adjustment QRG.
- 15:56, 7 November 2012 diff hist -37 m Main Page EPG 141.8
- 15:51, 7 November 2012 diff hist +458 m Category:141 Partnership Development New article, EPG 141.8
- 15:27, 7 November 2012 diff hist +8,019 Nm 141.8 Sponsorship Programs Per Traffic and Maintenance, new article to meet FHWA directive.
- 12:11, 7 November 2012 diff hist +2 m 903.7 Conventional Road Guide Signs →Table 903.7 Guide Sign Sizes: updated links
- 11:42, 7 November 2012 diff hist +471 m Main Page EPG 751 and EPG 124.1
- 11:15, 7 November 2012 diff hist -693 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.1 Quality Control / Quality Assurance for Project Estimates: Per Design, changed requirements for review of project estimate files. Responsibility of conducting QAs is now on the district.
- 10:51, 7 November 2012 diff hist +108 m 751.10 General Superstructure →751.10.1.11 Slab Elevations: Per Bridge and Construction and Materials, clarified estimated camber at 7 days and 90 days for P/S girder design.
- 10:45, 7 November 2012 diff hist +208 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per Bridge and Construction and Materials, clarified estimated camber at 7 days and 90 days for P/S girder design.
- 10:31, 7 November 2012 diff hist 0 N File:751.22.3.8.jpg current
- 10:31, 7 November 2012 diff hist +2,011 m 751.22 Prestressed Concrete I Girders Per Bridge and Construction and Materials, clarified estimated camber at 7 days and 90 days for P/S girder design.
- 09:22, 7 November 2012 diff hist +611 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.13 Inspection of Completed Members: Per Bridge and Construction and Materials, clarified estimated camber at 7 days and 90 days for P/S girder design. "Design camber" was defined.
- 15:34, 6 November 2012 diff hist +31 m Category:101 Standard Forms →Construction and Materials: Per CM, updated two forms
- 14:29, 6 November 2012 diff hist +92 m Main Page EPG 750.3, EPG 903.5
- 13:58, 6 November 2012 diff hist +49 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: added link
- 13:56, 6 November 2012 diff hist +189 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: Per Bridge, clarification to be consistant with current practice
- 13:52, 6 November 2012 diff hist -802 m 751.50 Standard Detailing Notes →E. General Elevation and Plan Notes: Per Bridge, clarification and to be consistant with current practices and practical design
- 13:45, 6 November 2012 diff hist -98 m 750.3 Bridges →750.3.1.8.2 Spread Footings
- 13:44, 6 November 2012 diff hist 0 N File:750.3.1.8.1.jpg current
- 13:42, 6 November 2012 diff hist +5,889 m 750.3 Bridges Per Bridge, update reflects new scour information from new edition of FHWA "HEC-18"; also clarification and to be consistant with current practices and practical design
- 08:40, 6 November 2012 diff hist 0 m 903.5 Regulatory Signs →903.5.40 Seatbelt Signs (R16-2, R16-3, R16-24, R16-27, R16-27a, R16-28)
- 08:38, 6 November 2012 diff hist 0 N File:903.5.40 option.jpg current
- 08:38, 6 November 2012 diff hist 0 N File:R16-27dP.jpg current
- 08:38, 6 November 2012 diff hist 0 N File:R16-27cP.jpg current
- 08:38, 6 November 2012 diff hist 0 N File:R16-27bP.jpg current
- 08:37, 6 November 2012 diff hist 0 N File:R16-27aP.jpg current
- 08:37, 6 November 2012 diff hist +2,222 m 903.5 Regulatory Signs →903.5.40 Seatbelt Signs (R16-2, R16-3, R16-24, R16-27, R16-27a, R16-28): Per Traffic, new buckle up sign assemblies.
- 08:06, 5 November 2012 diff hist 0 N File:146 CUF Nov 2012.pdf
- 08:06, 5 November 2012 diff hist +33 m Category:146 Disadvantaged Business Enterprise (DBE) Per Lawrence Brooks, SL Asst. Distr CM Engr, minor update of CUF form to include its second page that was left out in the previous submitted version.
- 14:44, 2 November 2012 diff hist +258 m LPA:136.13 LPA Policy Changes EPG 136.10.3
- 14:42, 2 November 2012 diff hist +242 m LPA:136.10 Advertisement for Bid and Project Award →136.10.3 Bid Opening Advertisement: Per LPA, LPA website advertisement opportunities have been expanded.
- 14:33, 2 November 2012 diff hist +59 m Main Page
- 08:15, 2 November 2012 diff hist +196 m 750.7 Non-Hydraulic Considerations →750.7.3.3 Environmental Requirements for Culverts: Per Bridge, added links
- 07:07, 2 November 2012 diff hist +165 m Main Page
- 13:40, 1 November 2012 diff hist +27 m Main Page added link
- 13:26, 1 November 2012 diff hist +193 m Main Page EPG 751.12 and EPG 751.50
- 13:21, 1 November 2012 diff hist -357 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per Bridge, removed expansion device movement gauge notes (H11.24 - 26)
- 13:19, 1 November 2012 diff hist -815 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.11 Expansion Device Movement Gauge: Per Bridge, removed movement gauge details
- 11:47, 1 November 2012 diff hist -7 m Main Page
- 11:46, 1 November 2012 diff hist 0 N File:Main Page 4 Nov 1, 2012.jpg current
- 11:46, 1 November 2012 diff hist 0 N File:Main Page 3 Nov 1, 2012.jpg current
- 11:46, 1 November 2012 diff hist 0 N File:Main Page Nov 1, 2012.jpg current
- 11:45, 1 November 2012 diff hist -150 m Main Page new photos
- 10:58, 1 November 2012 diff hist +79 m Main Page EPG 134.1.3
- 10:54, 1 November 2012 diff hist +305 m LPA:136.13 LPA Policy Changes EPG 136.4.1.5
- 10:50, 1 November 2012 diff hist +30 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.5 Consultant Qualification: Per LPA, added guidance that the Bridge Experience Profile and Personal Bridge Experience Record forms must be updated every 3 years
- 10:44, 1 November 2012 diff hist +80 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, added guidance that the Bridge Experience Profile and Personal Bridge Experience Record forms must be updated every 3 years
- 08:12, 1 November 2012 diff hist -976 m Main Page EPG 903.9.4 and EPG 903.10.6