Difference between revisions of "Category:134 Engineering Professional Services"

From Engineering_Policy_Guide
Jump to navigation Jump to search
 
(247 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{| style="padding: 0.3em; text-align: center; border: 2px solid #cccccc; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
+
{| style="margin: 1em auto 1em auto" align="right"
 
|-
 
|-
|'''Additional Information'''
+
|[[Image:EPSG pic.jpg|right|400px]]
 
|-
 
|-
 
|
 
|
[http://www.modot.org/business/standards_and_specs/documents/ComputerDeliverableContractPlans.pdf Specifications of Computer Deliverable Contract Plans]
+
{| style="padding: 0.3em; text-align: left; margin-left:9px; border: 2px solid #cccccc; font-size: 95%; background:#f5f5f5" width="395px" align="right"
 +
|-
 +
|align="center"|'''Helpful Links for Engineering Policy'''
 +
|-
 +
|[http://www.modot.org/business/consultant_resources/BridgeSpecialProvisions.htm Bridge Special Provisions]
 +
|-
 +
|[http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings]
 +
|-
 +
|[https://www.modot.org/cadd-environment OpenRoads Designer and Microstation Drawing Standards]
 +
|-
 +
|[http://www.modot.org/business/consultant_resources/ProjectCostEstimation.htm Project Cost Estimation]
 +
|-
 +
|[[:Category:321 Geotechnical Engineering|EPG 321 Geotechnical Engineering]]
 +
|-
 +
|[https://gpsweb3.modot.mo.gov/ MoDOT GPS Reference Station Network]
 +
|-
 +
|[https://www.modot.org/sites/default/files/documents/design/lpa/lpabrochure04.17.13.pdf Engineering Consultant Services Brochure]
 +
|}
 
|}
 
|}
  
When projected workloads and available resources indicate the need for a consultant’s professional services on a project, the [[#134.3 Engineering Professional Services Guidelines|Engineering Professional Services Guidelines]] (EPS) provide Missouri Department of Transportation (MoDOT) staff with the basic information needed to engage a consultant for the provision of specific services.
 
  
 +
==134.1 Introduction==
  
 +
In order to deliver projects, there may be occasions when additional engineering professional services and expertise are needed for a variety of reasons. EPG 134 Engineering Professional Services is a guide for soliciting, selecting and managing consultant contracts. Professional services are defined under the federal law, The Brooks Act, 40 USC 1102. Most consulting services used by MoDOT are included in the federal description of professional services, therefore MoDOT must follow the federal guidelines outlined in the Brooks Act for soliciting and selecting a consultant. All documentation related to the professional services procurement must be stored in eProjects under the “DE Consultant Document” content type.
  
==134.1 Guideline Summary==
+
===134.1.1 Federal Law===
 +
The Brooks Act, [https://www.gpo.gov/fdsys/pkg/USCODE-2012-title40/html/USCODE-2012-title40-subtitleI-chap11.htm 40 USC 1101 – 1104], [https://www.law.cornell.edu/cfr/text/23/172.3 23 CFR 172.3] (Public Law 92-582, 1972) and regulation found in [https://www.law.cornell.edu/cfr/text/23/172.5 23CFR172.5] requires agencies to “promote open competition by advertising, ranking, selecting and negotiating contracts based on demonstrated competence and qualifications for the type of engineering and design services being procured, and at a fair and reasonable price.” <u>This requirement applies to all Federal-aid Highway Program projects where engineering or design-related services are procured to develop a construction project.</u> This is commonly referred to as Qualifications Based Selection or QBS, meaning a firm is chosen based on qualifications and not price.
  
These guidelines include consultant selection, contracting procedures and dispute resolution.
+
===134.1.2 State Law===
 +
Commonly referred to as the “Mini-Brooks Act”, the State of Missouri, in [https://revisor.mo.gov/main/OneChapter.aspx?chapter=8 sections 8.285 thru 8.291 RsMO], requires Qualification Based Selection (QBS) for all architectural, engineering and land surveying professional services and reflects the language contained in the federal legislation. <u>This requirement applies to ALL projects in Missouri regardless if it contains federal funds or not.</u> However, federal laws supersede state laws if federal funds are used on a project.  
  
The [[:category:134 Engineering Professional Services#134.3.1 Consultant Selection|Consultant Procurement Process]] describes policies and procedures related to hiring a consultant:
+
===134.1.3 Consultant Qualification===
 +
{| style="padding: 0.3em; text-align: left; margin-left:9px; border: 2px solid #cccccc; font-size: 95%; background:#f5f5f5" width="375px" align="right"
 +
|-
 +
|align="center"|'''Forms and Figures'''
 +
|-
 +
|[[media:134.2.2 Jan 2020.docx|Fig. 134.2.2 Processing Standard Consultant Contracts Checklist]]
 +
|-
 +
|[[media:134.2.2.2 2019.docx|Fig. 134.2.2.2, Solicitation and Request Letter]]
 +
|-
 +
|[[media:134.2.2.5.1 May 2017.doc|Fig. 134.2.2.5.1, Consultant Rating Form]]
 +
|-
 +
|[https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.2.2.5.2.doc Fig. 134.2.2.5.2, Consultant Selection Rating Summary]
 +
|-
 +
|[[media:134.2.2.5.3 Oct 2021.docx|Fig. 134.2.2.5.3, Consultant Selection Approval Letter]]
 +
|-
 +
|[[media:134.2.2.5.4 2021.docx|Fig. 134.2.2.5.4, District/Division Approval of Short List]]
 +
|-
 +
|[https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.2.2.5.5.doc Fig. 134.2.2.5.5, Sample Criteria and Point Values for Rating Presentations/Interviews]
 +
|-
 +
|[[media:134.2.2.5.6 2016.docx|Fig. 134.2.2.5.6, Invitation to Present]]
 +
|-
 +
|[[media:134.2.2.5.7 2016.docx|Fig. 134.2.2.5.7, Sample Letter to Interview ]]
 +
|-
 +
|[[media:134.2.4 July 11 2017.doc|Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist]]
 +
|-
 +
|[[media:134.3.1 2017.doc|Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts]]
 +
|-
 +
|[[media:134.3.2 2021.pdf|Fig. 134.3.2, MoDOT Allowable Profit Curve]]
 +
|-
 +
|[https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.3.6.1.1%20Common%20Unallowable%20Costs.pdf Fig. 134.3.6.1.1, Common Unallowable Costs]
 +
|-
 +
|[https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.3.6.1.2.pdf Fig. 134.3.6.1.2, Overhead Schedule Example ]
 +
|-
 +
|[[media:134.4.1 2022.docx|Fig. 134.4.1, PSC Approval to Execute Contract ]]
 +
|-
 +
|[[media:134.4.2 2016.docx|Fig. 134.4.2, Notice to Proceed (NTP) Letter ]]
 +
|-
 +
|[[media:134_5_1_1_2021.xlsx|Fig. 134.5.1.1, Blank Consultant Invoice ]]
 +
|-
 +
|[[media:134.5.1.2 July 31, 2012.docx|Fig. 134.5.1.2, MoDOT Consultant Invoice Checklist ]]
 +
|- 
 +
|[[media:134.5.1.3 2020.xlsx|Fig. 134.5.1.3, Blank Consultant Invoice - Hourly Rate Contracts (only)]] 
 +
|- 
 +
|[[media:134.5.1.4.docx|Fig. 134.5.1.4, MoDOT Consultant Invoice Checklist - Hourly Rate Contracts (only)]] 
 +
|-
 +
|[[media:134.5.1.5 Sept 2012.xlsx|Fig. 134.5.1.5, Example Invoice ]]
 +
|-
 +
|[[media:134.5.2 2017.docx|Fig. 134.5.2, PSC Approval to Execute Supplemental Agreement ]]
 +
|-
 +
|align="center"|'''Additional Information'''
 +
|-
 +
|[[237.14 Electronic Design Data Delivery (BIM Deliverables)#237.14.4 Specifications of Electronic Design Data for Consultants and MoDOT|EPG 237.14.4 Specifications of Electronic Design Data for Consultants and MoDOT]]
 +
|}
 +
All <u>prime consultants</u> must be prequalified to perform engineering services on any project. To become prequalified, consultant firms must submit the following:  
  
:1. Approval to hire a consultant
+
:1. Statement of Qualifications (SOQ)
 +
:2. Registered to conduct business in the State of Missouri (Certificate of Good Standing) and hold a Certificate of Authority with the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects. (Note: A Certificate of Authority is not required for sole proprietorships or partnerships. It is only required if the firm is incorporated or registered as a limited liability company. For sole proprietorships and/or partnerships, individual professional license certificates must be submitted in lieu of the Certificate of Authority. In addition, the Certificate of Authority is not required for firms that do work outside the jurisdiction of the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects.)
 +
:3. Current E-Verify MOU and E-Verify Affidavit
 +
::* E-Verify MOU – one-time submittal
 +
::* E-Verify Affidavit - yearly
 +
:4. Current Annual Financial Prequalification with MoDOT
 +
::* Step-by-step [https://www.modot.org/consultant-prequalification instruction for becoming prequalified] and a [https://www.modot.org/consultant-prequalification-list list of pre-qualified consultant firms] can be found on [https://www.modot.org/design-related-consultant-services MoDOT's Consultant Services webpage].
 +
::* This annual financial prequalification is valid for one year.
 +
<div id="5. MoDOT Bridge Consultants Only (Not required for LPA Consultants)"></div>
 +
:5. <u>MoDOT Bridge Consultants Only (Not required for LPA Consultants)</u>): All bridge plans for MoDOT projects must be signed and sealed by a professional engineer from a prequalified firm for bridge design (with the firm’s logo shown in the title block of the bridge plans). For consultants who wish to become prequalified to perform bridge design, the consultant must submit a Bridge Experience Profile and a Personal Bridge Experience Record. These forms can be found on [https://www.modot.org/bridge-information MoDOT's Consultant Resources webpage] and must be updated every 3 years. In addition, the consultant must have a QA/QC plan on file with MoDOT which must be updated every 3 years. The prime consultant is not required to be prequalified for bridge design <u>unless</u> the scope of work performed by their firm includes bridge design. For more information, please contact MoDOT's Bridge Division.
  
:2. Soliciting letters of interest from consultants
+
The prequalification process complies with AASHTO guidelines published in the [https://audit.transportation.org/wp-content/uploads/sites/14/2019/08/UAAG-3-FINAL.pdf ''Uniform Audit & Accounting Guide, 2012 Edition''].  This prequalification process ensures projects are in compliance with state and federal regulations.  
  
:3. Selecting a consultant
+
The prequalification is only required for prime consultants.  Subconsultants are strongly encouraged to become prequalified in order to reduce repetitive paperwork for future projects.  For more information on subconsultant requirements see [[#134.3.5 Subconsultants|EPG 134.3.5 Subconsultants]].
  
:4. Approval of selected consultant
+
For prequalification requirements for LPA consultants, see [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4.1.5 Consultant Qualification]].
 +
<div id="Non-Profit and Governmental Indirect Cost Rate Requirements"></div>
  
[[:category:134 Engineering Professional Services#134.3.2 Contracting Procedures|Contracting Procedures]] describes the activities a MoDOT project manager performs while the contract is active:
+
'''Non-Profit and Governmental Indirect Cost Rate Requirements'''
  
:1. Which contract to use
+
In order to claim indirect costs for grant reimbursement, each such sub-recipient is required to annually submit a signed cost allocation plan for review and acceptance by MoDOT. The rate must be audited by an independent certified public accountant (CPA) firm with experience in preparing cost allocation plans for non-profit or governmental organizations in accordance with [http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title02/2cfr200_main_02.tpl 2 Code of Federal Regulations (CFR) 200].  
  
:2. Negotiating man-hours of effort required by the consultant
+
Compliance with 2 CFR 200 requires MoDOT to review the following documents:
  
:3. Pre-audit process
+
:1. Cost allocation plan
 +
:2. Organization chart
 +
:3. Employee time sheet sample showing allocation of direct and indirect labor hours
 +
:4. Audited schedules of indirect costs and fringe benefits
 +
:5. Audited, reviewed or compiled financial statements
 +
:6. Certification of indirect costs
 +
:7. Listing of grants/contracts with MoDOT
  
:4. Executing the contract
+
===134.1.4 Conflict of Interest===
 +
A conflict of interest occurs when a consultant has a financial or personal interest in a project.
  
:5. Invoice procedures
+
MoDOT evaluates the following on a case-by-case basis
 +
:1. Whether or not a conflict of interest exists
 +
:2. Whether or not the conflict of interest can be avoided or neutralized
 +
:3. The appropriate steps to avoid or neutralize conflict of interest in evaluating the above, MoDOT uses the following in making such determinations.
 +
:* Section 105.452 RSMo 2000 and Section 105.454 RSMo. 2005 are general conflict of interest statutes applicable to all state officials and employees including MHTC members and MoDOT employees.  These statutes prohibit actual conflicts of interest including, but not limited to:
 +
::* favorably acting or refraining from acting on any matter or using decision making authority to obtain financial gain (§105.452(1), (4) and (5) RSMo. 2000);
 +
::* disclosing and/or using confidential information obtained in his/her official capacity in any matter with the intent to result in financial gain (§105.452(2) and (3) RSMo. 2000);
 +
::* performing any service for an agency in which he/she is an officer or employee or has supervisory authority for payment in excess of $500 per transaction or [$1500] $5000 per year without competitive bidding (§105.454(1), (3) RSMo. 2005); and
 +
::* selling or leasing any property to an agency in which he/she is an officer or employee or has supervisory authority over for payment in excess of $500 per transaction or [$1500] $5000 per year without competitive bidding (§105.454(2), (3) RSMo. 2005).  However, this provision does not apply to property that is condemned by the agency from its officer or employee (§105.466.3 RSMo. 2005).
  
:6. Evaluating the consultant’s performance
+
The Federal Highway Administration (FHWA) addresses Conflicts of Interest in relation to federally funded highway projects in general at 23 CFR §1.33. MoDOT adopts these rules for use on all federally funded contracts.
  
The [[:category:134 Engineering Professional Services#134.3.3 Dispute Resolution|Dispute Resolution Process]] describes the formal process for resolving a disagreement between the consultant and MoDOT:
+
===134.1.5 Suspension/Debarment===
 +
All consultants receiving individual awards and all subrecipients/subconsultants must certify that the organization and its principles are not suspended or debarred. MoDOT’s Professional Services Coordinator will check SAM.gov / Exclusions to identify any consultants who have become suspended or debarred and will remove said consultant from the pre-qualified consultant list. Any consultant who becomes suspended or debarred shall not perform work on any MoDOT or LPA project.
  
:1. How the process is started
+
===134.1.6 Frequently Asked Questions===
 +
A list of FAQs regarding consultant issues can be found on [http://www.fhwa.dot.gov/programadmin/172qa.cfm FHWA’s website].
  
:2. Documentation required
+
===134.1.7 Workforce Diversity===
 +
Diversity includes all the characteristics and experiences that define each individual.  Diversity includes a wide range of individual characteristics such as age, religion, gender, race, ethnicity, disability and sexual orientation.  Diversity can also include such things as communication style, work style, economic status and geographic origin.  MoDOT supports and encourages diversity within the transportation industry. MoDOT’s desire is for the diversity of its consultants and contractors to reflect the diversity of the citizens of Missouri.
  
:3. Meetings between consultant and MoDOT
+
MoDOT’s engineering consultant solicitations require the consultant to describe their company’s approach to promoting and developing a diverse workforce. This category within the solicitation is a pass/fail category.  An example of promoting and developing diversity is being involved with local secondary and higher education facilities to educate individuals in the field of engineering.  Developing a cooperative/training program targeting the wide range of individual characteristics as listed above would be another example how firms are embracing workforce diversity. Continual efforts of encouraging a wide range of diverse individuals to the field of engineering will in turn develop a more diverse workforce.
  
:4. Concluding the process
+
Workforce diversity within the consulting firm as a whole can sometimes vary drastically from the diversity within the project team producing the work.  Assembling diverse project teams is a way to support workforce diversity.  Engineering consulting firms will be required to report on the '''project team’s''' diversity in the workforce diversity verification section of the template invoice, [[media:134_5_1_1_2021.xlsx|Fig. 134.5.1.1, Blank Consultant Invoice]].  See [[#134.5.1.1 Workforce Diversity Verification|EPG 134.5.1.1]] for workforce diversity reporting requirements.
  
==134.2 The Professional Services Committee (PSC) and Qualifications Based Selection (QBS)==
+
Workforce diversity differs from Disadvantaged Business Enterprise (DBE).  DBE focuses on firms owned and operated by socially and economically disadvantaged individuals.  For more information on DBE, visit [https://www.modot.org/welcome-external-civil-rights MoDOT’s External Civil Rights webpage].
  
The PSC ensures that MoDOT follows state and federal guidelines for the use of engineering consultantsThe committee is composed of the Director of Program Delivery (who chairs the committee), the State Design Engineer and the State Bridge Engineer.
+
==134.2 Solicitation and Selection Process==
 +
When MoDOT needs consultant services, specific processes for soliciting and selecting a consultant must be followed.  MoDOT must use the Qualifications Based Selection (QBS) for the procurement of engineering and design related servicesThis is mandated by both the federal and state law.  See [[#134.1.1 Federal Law|EPG 134.1.1 Federal Law]] and [[#134.1.2 State Law|EPG 134.1.2 State Law]] for the applicable laws.  If MoDOT does not follow the solicitation and selection process, federal funds could be jeopardized.
  
MoDOT is committed to getting the best value for every dollar spent.  How is that accomplished when selecting professional services where low bid selection may compromise the quality of the servicesThe process is called QBS and is governed by both state and federal regulations.
+
===134.2.1 Professional Services Committee (PSC)===
 +
The PSC ensures MoDOT follows state and federal laws for the use of professional services. The committee is composed of the Transportation Planning Director, State Design Engineer (chair) and the State Bridge Engineer. The committee may incorporate additional Division Directors/Engineers for contracts involving areas under their responsibility.  
  
At the federal level, the Brooks Act (Public Law 92-582, 1972) requires agencies to “promote open competition by advertising, ranking, selecting, and negotiating contracts based on demonstrated competence and qualifications for the type of engineering and design services being procured, and at a fair and reasonable price. This requirement applies to all federally funded projects.
+
MoDOT is committed to getting the “best value for every dollar spent”.  This is accomplished in the consultant selection by using the QBS process and selecting the most qualified consultant not the lowest bidderThe PSC ensures MoDOT follows the QBS process for all MoDOT consultant procurements with the exception of the Design-Build projects where the Design Build Project Director is responsible for ensuring QBS is followed.
  
The State of Missouri, in Sections 8.285 thru 8.291 RSMo, requires QBS for all architectural and engineering professional services and reflects the language contained in the federal legislation.
+
PSC approval is required at the following stages: 
  
MoDOT’s QBS process can be summarized in 7 Steps:
+
:1. The PSC approves the district or division engineer’s request to solicit consultants to provide professional services for MoDOT. The PSC also approves the dollar amount of PE/CE budgeted for this professional services contract.
 +
:2. For standard contracts and supplemental agreements, the PSC approves the negotiated number of task-hours and the “not to exceed” amount of the contract concurrent with the execution of the contract. The division liaisons review and provide comments prior to the PSC approval.
 +
:3. For on-call contracts, the PSC approves district and division consultant selections for master agreements.
  
:1. MoDOT solicits qualifications for identified professional services.
+
===134.2.2 Consultant Solicitation and Selection Process - Standard Solicitation Method===
 +
Outlined below is the step-by-step process for Standard Consultant Solicitation and Selection Method. The standard solicitation method is used for most MoDOT Consultant projects.  This method gives all consultants equal consideration during the solicitation process. [[media:134.2.2 Jan 2020.docx|Fig. 134.2.2 Processing Standard Consultant Contracts Checklist]] has been developed to help project managers through the paperwork process of hiring a consultant using the standard method.
  
:2. Interested professionals submit qualifications.
+
====134.2.2.1 Solicitation and Selection Step 1 – PE Funding====
 +
After the need to procure a consultant has been identified, the MoDOT Project Manager (PM) or Contract Administrator (CA) must first ensure that Preliminary Engineering (PE) funds are identified in [[121.3 The Statewide Transportation Improvement Program (STIP)|the approved STIP]] or STIP amendment for this project and if applicable, the TIP or appropriate MoDOT Budget.  The PM/CA should work with their District Planning Manager if there is a need to revise the STIP and/or TIP to adjust the funding levels to match the project costs.
  
:3. MoDOT evaluates the firms based on a) [[:Category:143 Practical Design|practical design]], b) experience and competence, c) the capacity of the firm to perform the work in the timeframe needed, d) past performance, and e) proximity to and familiarity with the project area.  The top 2 - 5 firms are placed on the “short list.
+
====134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC====
 +
The PM/CA will work with the core team members to develop a more detailed scope of services for the consultant contract.  The PM/CA will also need to identify the following items prior to sending a request to solicit for a consultant services to the PSC:
 +
:'''1. Construction Project Information''' – Project Description
 +
:'''2. Construction Project Information''' – Fiscal Year for Construction Project Award
 +
:'''3. Construction Project Information''' – Estimated project construction amount
 +
:'''4. Scope of Services''' – Detailed description of anticipated consultant services.
 +
:'''5. Project Funding''' – Total consultant contract costs (not to exceed amount).
 +
:'''6. Project Funding''' – Total consultant contract costs broken down by fiscal year.
 +
:'''7. Project Funding''' – Anticipated budget to be used for consultant services.
 +
:'''8. Project Funding''' – State or federal funds for PE. All projects must be evaluated to determine if it will have federal assistance. Work with your Design Liaison Engineer to make this determination.
 +
:'''9. Project Funding''' – Amount of PE dollars in the STIP
 +
:'''10. Project Funding''' – Cost Share/Cost Participation Information or federal earmark (if applicable)
 +
:'''11. DBE Requirements''' –Once the scope of work is defined, the MoDOT PM/CA must obtain a DBE Goal by sending the appropriate project information to MoDOT External Civil Rights (ECR) for review at DBEConsultGoal@modot.mo.gov. The DBE goal shall be included in the PSC solicitation request letter and the solicitation itself.  All consultant contracts <u>that utilize federal funds</u> must be reviewed by ECR, regardless of the dollar amount of the contract.
 +
:'''12.''' Will consultant selection process include interviews or presentation – can be determined by the PSC
 +
:'''13. Period of Service''' – for the consultant contract.
 +
:'''14. Selection Process''' – for procurement of consultant (ex: Standard Solicitation, Modified Solicitation etc.).  See [[#Consultant Presentations and Interviews|Consultant Presentations and Interviews]], below, to determine if they are needed.
 +
:'''15. Selection/Procurement Schedule''' – Anticipated schedule for procurement.
 +
:'''16. Anticipated Incentive/Disincentive Provisions''' – for the consultant contract (if applicable) See [[#134.5.6 Incentive and Disincentive Program|EPG 134.5.6 Incentive and Disincentive Program]].
 +
:'''17.''' The PM/CA should identify any additional division director(s) (e.g., Bridge, State Highway Safety and Traffic, Right of Way, Environmental, Construction, etc.) who may need to review and sign the PSC letter.
  
:4. MoDOT evaluates the firms on the short list to determine the firm most qualified to perform the services.  This may include interviews or presentationsPerformance evaluations from the Design Consultant Database are reviewed for past performance ratings.
+
All of the items listed above must be included in the [[media:134.2.2.2 2019.docx|Solicitation and Request Letter]] prepared by the PM/CA and sent to the Design Liaison and all needed divisions for review. Once all the reviews have been completed and all comments addressed, the letter is sent to the PSC via the email group CODEPSCReview with the names of all signers needed. The solicitation must not contain any information concerning task-hours, labor rates or cost information. If a maximum known dollar value is available to fund the professional services contract, the dollar value may be noted in the solicitation to avoid submission of letters by consultants unable to provide the services for the expenditure MoDOT has determined as reasonable for the projects. Cost information can only be considered '''''after''''' a consultant has been selected and a contract is being negotiatedThe solicitation should contain ALL of the rating categories that will be used to rate the consultantMoDOT must follow [https://revisor.mo.gov/main/OneSection.aspx?section=8.289&bid=150&hl= RsMO 8.289] when evaluating the consultant but additional criteria can be added as long as it is published in the solicitation. PM/CAs must indicate on the Solicitation and Request Letter if consultant services are being requested for planning studies for more than Asset Management improvements. More-than Asset Management planning studies must meet the following criteria:
  
:5. MoDOT provides an initial scope of services. The best scope and method of delivery are negotiated between MoDOT and the consultant.
+
:1. District has demonstrated that its asset management goals can be met over the next ten years, and
 +
:2. District has the financial ability to fund, or has written commitment from another entity to fund the construction of a significant portion, or more, of any improvement resulting from the study within ten years of the initiation of the study, and
 +
:3. The region has prioritized the study along with roadway and bridge improvements and is willing to fund the study with STIP right of way and construction funds or funding from others, or
 +
:4. The cost of the study is funded by another entity, with minimal MoDOT funding involvement for oversight and guidance.
  
:6. Consulting firm determines the hours and fee needed to deliver the services.
+
The cost of more-than-TCOS planning studies will result in an adjustment to the district’s STIP right of way and construction funds, except for studies funded by other entities.
  
:7. MoDOT and the consultant negotiate to assure the hours and fees are reasonable and fair. If an agreement cannot be reached with the first short listed firm, negotiations may be terminated and initiated with the second firm.
+
====134.2.2.3 Solicitation and Selection Step 3 – Central Office Review of Solicitation Request====
 +
After all district / division reviews are complete and comments addressed the [[media:134.2.2.2 2019.docx|Solicitation and Request Letter]] is emailed to the PSC at [mailto:CODEPSCreview CODEPSCreview] email group. The PSC members will review the request and sign for approval with the PSC chair making the final approval signature. Central Office will then post the solicitation/Request For Qualifications (RFQ) to the [http://www.modot.mo.gov/business/consultant_resources/consultant_home.htm MoDOT's Consultant Services Webpage]. An electronic notification of the RFQ is sent to Design Consultant Distribution List alerting interested parties of the opportunity.
  
The PSC is responsible for ensuring MoDOT follows the QBS process.
+
Consultant solicitations will be posted to MoDOT’s webpage twice a month, according to the RFQ Calendar found on the [https://www.modot.org/modot-solicitations-rfq MoDOT Solicitations (RFQ) site].
  
However, there are two primary exceptions to this process.  They are:
+
====134.2.2.4 Solicitation and Selection Step 4 – Consultant Response to the Solicitation/RFQ====
 +
Interested firms who wish to respond to the RFQ can submit a letter of interest. Cost information shall not be provided from the consultant at this time in the solicitation process.  Cost can only be considered '''''after''''' a consultant is selected and the contract is being negotiated.
  
:1. Execution of contracts involving emergency projects and
+
====134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant====
 +
After the RFQ submittal deadline, MoDOT will evaluate the letters of interest or SOQ. The PM/CA verifies all firms are prequalified.  [https://www.modot.org/consultant-prequalification-list MoDOT's Approved Consultant Prequalification List] contains the prequalification information on the firms. According to state law [https://revisor.mo.gov/main/OneSection.aspx?section=8.289&bid=150&hl= RsMO 8.291], MoDOT must list a minimum of three highly qualified firms and then select the firm best qualified to perform the work, based on the rating criteria outlined in the RFQ. See [[#Consultant Presentations and Interviews|Consultant Presentations and Interviews]] below for more information on presentations and interviews. When fewer than three responses are received, it is suggested the RFQ be re-advertised at least once. However, if the PM/CA suspects the readvertisement would not likely produce additional respondents, they should reach out to firms who received the solicitation but did not respond to attempt to gain information as to why the firm(s) did not respond; and if they would be likely to respond if the advertisement were extended or not. A written summary of the phone conversations should be kept in the project file and presented to the PSC for approval to move forward with less than 3 or to readvertise. If fewer than three responses are received again or if the decision is made by the PSC not to readvertise, then the PM/CA and District Design Liaison must consider whether there was some aspect of the RFQ that was overly restrictive or otherwise had an adverse impact on the completion of the project. If the decision is made to proceed without readvertisement, then the district should document the RFQ requirements were not restrictive, it was adequately publicized, and the one or two firms who responded are qualified to perform the tasks outlined for the project. The selection team will then rate all firms based on the criteria outlined in the RFQ. Past performance evaluations may be considered as part of the firm’s evaluation. '''Price quotations shall not be requested or used for consideration prior to selecting a firm.'''  Price can only be determined AFTER the consultant is selected.   
  
:2. Execution of contracts to procure consultants for MoDOT’s three Design/Build projects has been given to the specific Project Directors.
+
'''The Selection Team.''' The district and/or division forms a team to review the consultant responses and select a firm to provide the necessary services. In most cases, the team shall include at least three members, one of whom is from the Central Office (usually a Design, Construction or Structural Liaison Engineer). If a major component of the project is a specialty area supported only by Central Office staff, that division should be asked to participate as well. If the project is a project designated for federal involvement for any element related to Design or Construction Inspection, the Federal Highway Administration (FHWA) shall be offered the opportunity to participate as an observer. Should another entity (KDOT, IDOT, [https://www.modot.org/missouri-metropolitan-planning-organizations MPO], city, county, etc.) be funding part of the cost of the work that entity shall be offered the opportunity to participate as a member of the selection team.  
  
==134.3 Engineering Professional Services Guidelines==
+
'''Rating/Scoring the Consultants.''' Consultants MUST be rated based on the rating criteria that was published in the advertised solicitation. Adding or deleting any rating criteria after the solicitation expires is not allowed. If PM/CA wishes to have the option to shortlist respondents, the short-listing procedures and the weighted rating criteria used to short-list respondents must be included in the solicitation.
{| style="padding: 0.3em; text-align: center; margin-left:8px; border: 2px solid #cccccc; font-size: 95%; background:#f5f5f5" width="205px" align="right"
+
|-
+
In order to short-list when presentations and interviews are not being conducted, a minimum of 10 respondents must be received, and the PM/CA shall have the ability to short-list down to a minimum of 3 qualified respondents. The rating criteria used to short-list shall include but is not limited to: The firms Pre-Qualification is current, Workforce Diversity, the firms listed experience as related to the advertised work, & the firms project team’s accessibility & availability. Shortlist scoring & a written summary of the shortlist selection shall be included in the eProject file, or wherever project files are retained, along with the eventual final scoring & selection of the most qualified firm.
|'''Forms'''
 
|-
 
|[http://www.modot.org/business/standards_and_specs/documents/ComputerDeliverableContractPlans.pdf Specifications of Computer Deliverable Contract Plans]
 
|-
 
|[http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC_Approval_To_Solicit_with_Cover_Letter_&_Table.docx PSC Approval to Solicit Consultants Letter]
 
|-
 
|[[Media:Rating Form for Selecting Short List.doc|Rating Form for Selecting Short List]]
 
|-
 
|[http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC_Short_List_Approval_Letter.docx PSC Review of Short List Letter (Short List Approval Letter)]
 
|-
 
|[[Media:Invitation to Present.doc|Invitation to Present]]
 
|-
 
|[[Media:Criteria and Point Values for rating Presentations and Interviews.doc|Criteria and Point Values for rating Presentations and Interviews]]
 
|-
 
|[[Media:Rating Summary for Documenting Selection Process.doc|Rating Summary for Documenting Selection Process]]
 
|-
 
|[[Media:Invitatin to Interview.doc|Invitation to Interview Letter]]
 
|-
 
|[http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Consultant%20Selection%20%20letter.doc PSC Consultant Selection Approval Letter]
 
|-
 
|[http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC_Approval_Letter_Request_To_Execute_Contract_DBE.docx PSC Approval to Execute Contract Letter (Request to Execute Contract)]
 
|-
 
|[[Media:Notice to Proceed Letter.doc|Notice to Proceed Letter]]
 
|-
 
|[[Media:Invoice for Professional Services.doc|Invoice for Professional Services]]
 
|-
 
|[[Media:Progress Report.doc|Progress Report]]
 
|-
 
|[http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Letter%20Request%20to%20Execute%20Supplemental%20Contract%20DBE.dot PSC Approval to Execute Supplemental DBE Agreement Letter]
 
|-
 
|[[Media:Recovery of Cost Due to Consultant Design Error.doc|Recovery of Cost Due to Consultant Design Error]]
 
|-
 
|[http://epg.modot.mo.gov/forms/DE-Engineering%20Professional%20Services/Attachment17ConsultantSelectionAndContractAdministrationSummary.dot Consultant Selection And Contract Administration Summary] 
 
|-
 
|[http://epg.modot.mo.gov/forms/DE-Engineering%20Professional%20Services/Attachment18ConsultantSelectionAndContractAdministrationSummary-Bridge.dot Consultant Selection And Contract Administration Summary - Bridge]
 
|-
 
|'''Figures'''
 
|-
 
|[[Media:MoDOT Allowable Profit Curve.pdf|MoDOT Allowable Profit Curve]]
 
|}
 
  
[[Image:EPSG pic.jpg|left|440px]]
+
If it's determined and noted in the solicitation request that the PM/CA will conduct interviews or presentations with the consultants, see [[#Consultant Presentations and Interviews|Consultant Presentations and Interviews]] below for more information on how to rate and score the consultants. If interviews and/or presentations will not take place, the selection team can begin rating the consultants. The [[media:134.2.2.5.1 May 2017.doc|Consultant Rating Form, Fig. 134.2.2.5.1]], shall be used to rate and select the most qualified firm.
 +
 +
Each member of the selection team will individually develop a numeric score to rate each firm using the categories listed in Fig. 134.2.2.5.1. The team will, as a group, compare these scores and discuss how they were determined. The team must reach consensus on the consultant to select. The team will create a rating summary as outlined in [https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.2.2.5.2.doc Fig. 134.2.2.5.2] clearly indicating which firm has been recommended for selection and documenting the selection process. The documentation must include written text on how the scores were determined. This documentation will be kept in the eProject file.  Once the recommended selected firm is determined, send the Selection Approval letter ([[media:134.2.2.5.3 Oct 2021.docx|Fig. 134.2.2.5.3]]) for approval to the District Engineer/Division Engineer.  With approval from the District Engineer/Division Engineer, the team can notify the selected firm.  After contacting the firm, a copy of all documentation must be sent to Central Office via the email group CODEPSCReview including the signed Approval letter (Fig. 134.2.2.5.3) of the selected firm. The final, approved selected firm will be posted on [http://www.modot.mo.gov/business/consultant_resources/consultant_home.htm MoDOT's Consultant Services webpage].
  
When projected workloads and available resources indicate the need for a consultant’s professional services on a project, the EPS Guidelines provide Missouri Department of Transportation (MoDOT) staff with the basic information needed to engage a consultant for the provision of specific services. Any reference herein regarding a district performing certain functions or having certain responsibilities also applies to individual Central Office divisions if they directly administer the contract.  In that case, the division will assume the responsibilities described for the district. 
+
=====Consultant Presentations and Interviews=====
 +
Most projects do not require interviews or presentations. The PM/CA will verify all respondents are current with their pre-qualification status and will verify the respondents workforce diversity statement as a pass/fail. The selection team may then select the most qualified firm by scoring the respondents and choosing the top ranked firm. Specific conditions that allow the selection to take place <u>without</u> interviews or presentations are as follows:
  
[[Image:Consultant Needs Flow Chart.png|570px]]
+
:* The scope and cost of the contract is considered to be minor or routine in nature.
 +
:* The district or division is very familiar with the qualifications and capabilities of all the short-listed firms from previous services or presentations and believes presentations or interviews will not increase knowledge of the short-listed firms.
 +
:* The need for an accelerated selection process due to the critical nature of the contract.  
  
'''The Professional Services Committee (PSC) and Qualification Based Selection (QBS)'''
+
If interviews and/or presentations are required, the PM/CA will verify all respondents are current with their pre-qualification status, and will verify the respondents workforce diversity statement as a pass/fail. The selection team will then rate all the consultants based on the rating criteria published in the solicitation using [[media:134.2.2.5.1 May 2017.doc|Fig. 134.2.2.5.1]] and as outlined above under Rating/Scoring the Consultants. Then the selection team will select the top 3-5 highest scoring firms and place them on a short list for further evaluation during presentations and/or interviews. If the PM/CA wants to interview less than 3 firms, approval must be granted by the PSC. Once the recommended selected firms are determined, send [[media:134.2.2.5.4 2021.docx|District/Division Approval of Short List (Fig. 134.2.2.5.4)]] for approval to the District Engineer/Division Engineer. With approval from the District Engineer/Division Engineer, the team can notify the selected firms. After contacting the firms, a copy of all documentation must be sent to the Central Office via the email group CODEPSCReview including the District/Division Approval of Short List (Fig. 134.2.2.5.4) of the selected firms. The final, approved selected firms will be posted on MoDOT's Consultant Services webpage.  See Consultant Presentations and Consultant Interviews, immediately below.
  
The PSC ensures that MoDOT follows State and Federal guidelines for the use of engineering consultants. The committee is composed of the Director of Program Delivery (who chairs the committee), the State Design Engineer and the State Bridge Engineer. At times the committee may incorporate additional members, such as the Transportation Planning Director for contracts involving a planning study, feasibility study, or major investment study. The State Construction and Materials Engineer is added when the selection involves construction and materials inspection or geotechnical services. The State Traffic Engineer will be a member when the selection involves traffic modeling or [[:Category:910 Intelligent Transportation Systems|Intelligent Transportation Systems (ITS)]] and the Environmental & Historic Preservation Manager is added if the selection involves [[127.26 Environmental Classification|EA or EIS preparation]].  The Community Relations Director is added for projects with extensive public involvement or the use of a public involvement sub-consultant.  On behalf of the committee, the Chair approves or rejects the selection of the consultant.  The PSC provides comments as needed.
+
'''Consultant Presentations.''' Before the presentations, the selection team must determine the scoring criteria ([https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.2.2.5.5.doc Fig. 134.2.2.5.5]) to be used. These criteria can include many variables, but each element must be assigned a point value and expectations for assigning the maximum points should be developed. The PSC Chair is invited to attend the presentations. See the [[media:134.2.2.5.6 2016.docx|sample letter, Fig. 134.2.2.5.6]], inviting the consultant to present.  
  
MoDOT is committed to getting the best value for every dollar spent. How is that accomplished when selecting professional services where low bid selection may compromise the quality of the services?  The process is called QBS and is governed by both State and Federal regulations.
+
After each consultant presentation, the selection team moves to a private location to discuss the presentation. Each member of the selection team will individually develop a numeric score to rate each firm based on the pre-determined criteria and scoring process. Although use of the example is not required, the criteria and scoring process must be determined prior to the actual presentation. The selection team will, as a group, compare these scores and discuss how they were determined; the selection team must reach consensus on the selected consultant.  
  
At the federal level, the [http://www.acec.org/advocacy/brooks.cfm Brooks Act (Public Law 92-582, 1972)] requires agencies to “promote open competition by advertising, ranking, selecting, and negotiating contracts based on demonstrated competence and qualifications for the type of engineering and design services being procured, and at a fair and reasonable price.”  This requirement applies to all federally funded projects.
+
The selection team will create a rating summary [https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.2.2.5.2.doc rating summary (Fig. 134.2.2.5.2)] for all the short-listed firms, clearly indicating which firm is recommended for final selection and documenting the selection process in the eProject file. The rating summary is only one tool used in the selection. Although selection of the highest scoring firm is not required, if it is not selected the reasons must be documented. This documentation will be kept in the eProject file. The final approved selected firm will be posted at [http://www.modot.mo.gov/business/consultant_resources/consultant_home.htm MoDOT's Consultant Services webpage].  
  
The State of Missouri, [http://www.modot.missouri.gov/doc/othertransportation/State-Missouri_Revised_Statutes_Sections_8_285-8_291.doc Sections 8.285 thru 8.291 RSMo], requires QBS for all architectural and engineering professional services and reflects the language of the federal legislation.
+
'''Consultant Interviews.''' For a feasibility study, environmental assessment, environmental impact statement, major bridge design, major investment study, or at the PSC direction, the selection team should conduct interviews with the short-listed firms. This requires considerable preparatory work; however, the selection team can limit the number of consultant staff and specify particular individuals as well as the opening topics. (See [[media:134.2.2.5.7 2016.docx|Fig. 134.2.2.5.7 sample letter to interview]]). Before the interviews, the selection team must determine the interview questions along with a description of the correct type of answer. Depending on the complexity of the questions, 15 to 18 questions will fill the time allotted. Additionally, the scoring criteria must be pre-determined. These criteria can include many variables, but each element must be assigned a point value and expectations for allocating the maximum points should be developed. The PSC Chair is invited to attend the interviews. A sample format for an interview (with time guidelines) follows:
MoDOT’s QBS process can be summarized in 7 Steps:
 
# MoDOT solicits qualifications for identified professional services.
 
# Interested professionals submit qualifications.
 
# MoDOT evaluates the firms based on a) practical design, b) experience and competence, c) the capacity of the firm to perform the work in the timeframe needed, d) past performance, and e) proximity to and familiarity with the project area. The top 2 - 5 firms are placed on the “short list.”
 
# MoDOT evaluates the firms on the short list to determine the firm most qualified to perform the services. This may include interviews or presentations.  Performance evaluations from the Design Consultant Database are reviewed for past performance ratings.
 
# MoDOT provides an initial scope of services.  The best scope and method of delivery are negotiated between MoDOT and the consultant.
 
# Consulting firm determines the hours and fee needed to deliver the services.
 
# MoDOT and the consultant negotiate to assure the hours and fees are reasonable and fair.  If an agreement cannot be reached with the first short listed firm, negotiations will be terminated and initiated with the second firm.
 
  
The PSC is responsible for ensuring that MoDOT follows QBS process. The committee chair approval is required at several stages. The PSC provides comments to the PSC chair on any project concerns at any time in the process.
+
During the interview, each selection team member individually scores the consultant as each question is answered. After each interview, the selection team discusses the consultant responses and averages the scores from the entire team. After the final interview, the team will, as a group, compare these scores and discuss how the firms rank; the selection team must reach consensus on the consultant to select. The selection team will create a rating summary clearly indicating which firm is recommended for selection and documenting the selection process. The rating summary is only one tool used in the selection. Although selection of the highest scoring firm is not required, if it is not selected the reasons must be documented. This documentation will be kept in the eProject file. The team must receive approval from the District or Division Engineer before notifying the selected consultant or any other parties. The final, approved selected firm will be posted on [http://www.modot.mo.gov/business/consultant_resources/consultant_home.htm MoDOT's Consultant Services webpage].
  
# The PSC chair approves the district or division engineer’s request to solicit consultants to provide professional services for MoDOT.
+
===134.2.3 Consultant Solicitation and Selection Process – Noncompetitive===
# For contracts involving presentations, the PSC chair approves the “short list” first and is invited to attend the presentations.  
+
There may be occasions when the standard QBS solicitation process is not appropriate. Each occasion will be evaluated on a project by project basis. Projects for which competition is determined to be inadequate after solicitation, emergency work affecting public safety or highly specialized knowledge that would result in a single consultant responding to the RFQ are candidates for Noncompetitive Procurement (23 CFR 172.7(a)(3)). Examples of specialized work are; hazardous waste services, wetland mitigation, urgent bridge projects and historic preservation services. The PM/CA will work with their Design Liaison Engineer to determine if a PSC Noncompetitive Approval is appropriate and if so, will complete and submit the [[media:134.2.2.2 2019.docx|Solicitation and Request Letter (Fig. 134.2.2.2)]] to PSC via the email group CODEPSCReview for PSC review and approval.  
# For standard contracts and supplemental agreements, the PSC chair approves the consultant selection, the negotiated number of man-hours and the “not to exceed” amount of the contract concurrent with the execution of the contract. The PSC and division liaisons provide review and comment to the chair prior to approval.
 
# The PSC chair executes all standard and supplemental contracts.
 
# For on-call, hourly rate contracts, the PSC chair approves district and division consultant selections.
 
  
Exceptions to this process are for execution of contracts involving emergency projects and for MoDOT’s three Design/Build projects where authority to procure consultants and execute contracts has been delegated to the specific Project Directors.
+
The Noncompetitive Method may be appropriate for projects with any of the following conditions:
  
This article provides guidance in assuring that proper QBS procedures are easy to understand and expectations clear.
+
:1. The critical nature of the work requires an accelerated selection process.  The term “critical nature” refers to tasks required as a result of unanticipated events, legal actions or compliance with directives from regulatory agencies.  However, the PSC Chair will consider these requests on a case by case basis.
  
===134.3.1 Consultant Selection===
+
:2. The scope of services requires highly specialized knowledge and expertise that limits the number of qualified firms.  Examples are underwater bridge inspection, designs to address environmental mitigation, and cultural resource investigations.
  
[[Image:Consultant Selection.png|center|600px]]
+
:3. The work qualifies for the small purchase category. This category includes those contracts with a cost less than $25,000 and required services outside the work categories for an On-Call MOU contract.
  
====134.3.1.1 Solicitation of Interest from Consultants====
+
===134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts===
  
Projects are selected and prioritized using the Planning Framework.  When projected workloads and available resources indicate the need for a consultant’s professional services on a project, the District Design Engineer (DDE) informs the Project Manager (PM), who develops a general description of the work needed. The PM and DDE discuss the need with the Assistant District Engineer and District Engineer (DE). After the DE agrees with the need to hire a consultant, the PM works with the core team to develop a more detailed scope of work to aid the PM in developing a cost estimate for the proposed consultant services.  Preliminary Engineering funds must be identified as a part of the current [[121.3 The Statewide Transportation Improvement Program (STIP)|Statewide Transportation Improvement Plan (STIP)]].  Based upon the cost estimate, the PM determines the general type of contract needed, hourly rate or standard, and whether federal monies will be used for the contract.  [http://wwwi/intranet/cc/contracts.asp?f=DE&nav=modot Boilerplate contract forms] are available for use.
+
Every three years MoDOT requests interested firms to respond to a Master Agreement RFQ, which lists specific work categories in a specific district or Central Office Division. The selected consultant is approved to only provide professional services under a Memorandum of Understanding (MOU) for the district/division in their selected work category. Each respective district/division evaluates the letters of interest from responding consultants, completes the consultant selection process, following [https://revisor.mo.gov/main/OneSection.aspx?section=8.289&bid=150&hl= RsMO 8.291], and requests PSC approval of the selected consultants. Once the PSC approves the selections, the Design Division drafts and executes a Master Agreement with each approved consultant and also maintains a list of consultants approved to provide services under the Master Agreement per district and/or division. The current on-call consultant list is available at [https://www.modot.org/consultant-prequalification-list MoDOT's Consultant Prequalification Requirements]. The following lists the specific work categories approved for the 2020-2023 Master Agreements:
  
If the project involves services for ITS, a major bridge, federal funding or is expected to exceed $1,000,000 the [http://wwwi/intranet/cc/contracts/DE/DE01%20%20Design%20Consultant%20Agreement.doc DE01 Federal Assistance contract] should be used.  The expected scope of work should be sent to the External Civil Rights Administrator for review to set a Disadvantaged Business Enterprise (DBE) goal for the contract.  If a goal is set, it is to be included in the solicitation for services.  A standard [http://wwwi/intranet/cc/contracts/DE/DE01-SF%20%20Design%20Consultant%20Agreement%20(State%20Funded).doc DE01-SF State Funded contract] may be used for services with an estimated cost up to $1,000,000 and where no federal funding is expected. 
+
:'''District Work Categories'''
  
An hourly rate contract, [http://wwwi/intranet/cc/contracts/DE/DE01-MOU%20%20Memorandum%20of%20Understanding.doc DE01-MOU] can be used when the estimated cost is less than $100,000 and the scope of services fits the established Work Categories (listed in [[#134.3.2.3 Hourly Rate Contracts|EPG 134.3.2.3 Hourly Rate Contracts]]).  A standard contract should be used when the estimated cost is close to $100,000 or there is a high likelihood of changes to the scope of services may push the contract over the $100,000 ceiling for hourly rate contracts.  The $100,000 is a cumulative limit for all MOUs for the same job number.
+
::1. Construction Materials Testing & Inspection
 +
::2. Roadway Design
 +
::3. Surveying
  
=====134.3.1.1.1 List of Consultants Interested in Providing Services to MoDOT=====
+
:'''Division Work Categories'''
  
The MoDOT Design Division maintains a Lotus Notes database of consulting firms who have expressed an interest in providing professional services to MoDOT. This information is obtained from the [http://www.modot.mo.gov/pdf/business/254AandE.pdf Standard Form 254] or [http://www.modot.org/business/consultant_resources/documents/SF330Instructionsandform.pdf Standard Form 330] Part 2 (contains information regarding their staffing and qualifications) completed by the consultant.  Data from this form is also used during the selection process.  Many consultants ask how to get on the list to provide consulting services to MoDOT.  A consulting firm that would like to be added to the list of firms contacted when MoDOT needs services should complete a Standard Form 254 or Standard Form 330 Part 2 and submit it to the Design Division. Standard Forms 254 and 330 (with instructions) are available on the General Information for Consultants Internet website at:
+
::1. Bridge Deck Surveys
www.modot.mo.gov/business/consultant_resources/geninfodesignconsultans.htm
+
::2. Bridge Design
 +
::3. Disadvantaged Business Enterprise (DBE)
 +
::4. Environmental - Cultural Resources
 +
::5. Environmental - Endangered Species
 +
::6. Environmental - NEPA
 +
::7. Environmental - Noise Studies
 +
::8. General Services - Architectural/Interior Design
 +
::9. General Services - Civil/Structural
 +
::10. General Services - Mechanical/Electrical
 +
::11. Geotechnical Engineering Services
 +
::12. LiDAR & Photogrammetry
 +
::13. Pavement Friction Testing
 +
::14. Value Engineering
  
The consultant is responsible for updating this staffing and qualification information annually.  The updates should indicate changes in mailing address, contact personnel, staffing, or types of work.  The consultant must also be registered to do business in the state of Missouri and must be in good standing with the Secretary of State’s Office.  The Secretary of State’s website will be used to ensure these requirements are fulfilled.  Questions concerning these requirements should be directed to the Design Division.
+
:'''Statewide District Use Categories'''
  
The Lotus Notes database can be accessed as follows:
+
::1. Right of Way Acquisition & Relocation Services
# Start Lotus Notes
+
::2. SUE
# Select File → Database → Open
+
::3. Traffic Engineering
# Server = LNAPP2
+
::4. Traffic – Electrical Engineering
# In the Database window scroll down, select “DE,” and double click
+
::5. Traffic – ITS Management & Design
# Select “Design Consultant Database” and double click to open
+
::6. Traffic – Safety Data Analysis
 +
::7. Traffic – Structures
 +
::8. Utility Accommodation & Coordination
  
This same database also contains evaluations of a consultant’s past performance.
+
Deletions or additions to the on-call consultant list require the PSC Chair’s approval. Approval to use a consultant other than on the district’s or division’s approved list may be granted upon written request to the PSC.  [https://www.modot.org/consultant-prequalification-list MoDOT's Consultant Prequalification Requirements webpage] contains the lists of approved on-call consultants.
  
=====134.3.1.1.2 Standard Solicitation=====
+
Information on the financial prequalification process for consultants can be found on MoDOT's Consultant Prequalification Requirements webpage. Consulting firms must be financially prequalified for selection to the On-Call Consultant list and must maintain their prequalification throughout the three-year term of the Master Agreement. To execute an MOU with a consultant, the selected consultant must be pre-qualified and have current E-Verify on file.
 +
 +
To ensure on-call contracts are used as intended, the PSC has established several guidelines:
  
The solicitation method described here is used for the majority of MoDOT projects. This method gives all consultants equal consideration during the solicitation process, without preconceived opinions of qualifications.  Projects involving MoDOT funding and/or MoDOT right of way require prior approval by the PSC chair to use any solicitation method that deviates from the one described.
+
:1. All district MOUs must be approved by the Design Liaison Engineer prior to selection of an on-call consultant to ensure all other resources have been considered.
  
The PM prepares a letter requesting the [http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC_Approval_To_Solicit_with_Cover_Letter_&_Table.docx PSC chair’s approval to solicit consultants] and gives it to the DE or Division Engineer for review, signature, and submittal to the PSC chair, with a copy to the State Design Engineer.  The request stipulates the services needed, a cost estimate and estimated “not to exceed” amount for the services, the type of selection process to be used and the contracting schedule.
+
:2. The Master Agreement may be executed for a maximum period of three years, although the master agreement may include provisions for a one-year extension at the end of the three-year period.  
  
Design Division circulates the information provided by the District or Division to all specialized work units such as Bridge, Soils and Geology, Environmental, Historic Preservation, Maintenance, Traffic, IS, and Construction for their review and comment to ensure the correct projects and services are being requested. The information is also provided to the Design Liaison Engineers (DLE) and DE’s to determine if in-house staff are available in another district.  The Design Division forwards any comments received from the specialized work units or DLE to the district for information and, if necessary, makes revisions to the request.  When all involved parties agree on the content, the PSC chair approves the request.  The PM develops [[#134.3.4 Sample Information for Solicitation|information for the consultant solicitation]] and submits it to the State Design Engineer (Attachment 2).   
+
:3. No single MOU will exceed a total cost of $200,000.  Neither the district, nor Central Office, may, in any instance, execute multiple MOUs for a single job for services that exceeds a total of $200,000 in aggregate.  MOUs within the $200,000 limit do not need prior PSC approval for execution and can be executed by the respective District Engineer or division engineer (up to $100,000) or a member of the Executive Committee (over $100,000). If an MOU is near the $200,000 limit, the Project Manager/Contract Administrator (PM/CA) shall contact their Design Liaison Engineer to determine if the project will follow the guidance of [[#134.2 Solicitation and Selection Process|EPG 134.2 Solicitation and Selection Process]].  
 +
<div id="Master Agreement Execution Process"></div>
 +
   
 +
<u>'''Master Agreement Execution Process'''</u>
  
The Design Division then posts the solicitation on MoDOT’s General Information for Consultants website and issues a notification to all consultants included in the Lotus Notes Consultant Database that a new solicitation has been posted and provides the DE with a copy of the consultant solicitation and the date by which the consultants must respond.
+
Outlined below is the process of executing the Master Agreement for On-Call Contracts.
  
The solicitation describes the type of services that are needed and instructs consultants who wish to be considered for these services to send a letter expressing their interest to the appropriate district office. The solicitation must include the DBE goal, if applicable, a detailed schedule that will be adhered to for the selection process and the contract negotiations process. The solicitation must also state whether the incentive/disincentive program will be used (see [[#134.3.2.7.4 Incentive and Disincentive Program|EPG 134.3.2.7.4 Incentive and Disincentive Program]]).  The solicitation can range from a simple listing of the county, route, anticipated construction cost, type of project to be constructed, and services to be provided by the consultant to a detailed Request for Qualification (RFQ) or Request for Proposal (RFP), depending on the complexity of the project.   
+
:1. The RFQ is posted to the web and electronic notification is sent to interested parties listed on the Design Consultant distribution list.
 +
:2. The district/division rates and develops a list of selected consultants.
 +
:3. The PSC chair approves the selection of consultants for specific work categories in each district/division.  
 +
:4. Only Approved Pre-Qualified Consultants are eligible for Master Agreement.  The pre-qualification process also includes a review of the firm’s indirect cost rate. 
 +
:5. Since the amount of future services to be performed under the agreement is unknown, the allowable fixed fee based upon direct labor cost is limited to 12 percent.
 +
:6. The Design Division develops a “Master Agreement” to be executed by the approved consultant(s). This agreement outlines the basic conditions of the contractual relationship and specifies the work category(ies). The Master Agreement is the foundation for a Memorandum of Understanding (MOU) that the district or division later executes with a consultant to address the need for a specific scope of services in a specific work category.  When the agreement is created and saved in eAgreements, the system will auto-assign a new file nameThis auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.
 +
:7. Design Division drafts the Master Agreement in eAgreements and executes the Master Agreements [[media:134 Docusign.pdf|electronically through DocuSign]].
  
Neither the solicitation, nor the letter of interest, shall contain any information concerning man-hours, labor rates, or cost information.  If a maximum known value is available to fund the professional services contract, it may be noted in the solicitation to avoid submission of letters by consultants unable to provide the services for the expenditure MoDOT has determined is reasonable for the project.  Cost information can only be considered once a consultant has been selected and a contract is being negotiated.  Should a consultant submit cost information with their letter of interest, RFQ, or RFP, the recipient of the information must remove it from the letter before giving copies to other members of the selection team.  A consultant submitting cost information should not automatically be disqualified unless the selection team believes the information submitted resulted in the consultant gaining an advantage over other consultants.
+
<div id="The district then follows the procedures below"></div>
  
=====134.3.1.1.3 Modified Solicitation=====
+
The district or division then follows the procedures below for executing individual MOUs to obtain services as the need arises.  
 +
<div id="MoDOT MOU Execution Process "></div>
 +
<u>'''MoDOT MOU Execution Process'''</u>
  
There are times when the standard solicitation process will not work, takes too long, or is too cumbersome for the needs of the project. In addition, some specialized work units in MoDOT (e.g., Bridge, Soils and Geology, Environmental, Historic Preservation, and Photogrammetry) use a “modified solicitation” method because of the unique services requested. Consultants providing specialized services to these units provide their qualifications directly to the units, which evaluate consultant qualifications and maintain a list of qualified firms. When a consultant is needed and the situation fits one of the conditions listed below, the DE or specialized work unit gets PSC chair approval to do a modified solicitation.
+
[[media:134.2.4 July 11 2017.doc|Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist]] has been created to guide project managers through the process of hiring an on-call consultant  through close- out of the MOU.  
  
The three special conditions warranting solicitation of letters of interest from the limited group of consultants are:
+
Outlined below is the process of executing an MOU for On-Call Contracts.  
# The critical nature of the work requires an accelerated selection process.  The term “critical nature” refers to tasks required as a result of unanticipated events, legal actions or compliance with directives from regulatory agencies.  However, the PSC chair will consider each individual case on its own merits.
 
# The scope of services requires a highly specialized knowledge and expertise that limits the number of qualified firms.  Examples are underwater bridge inspection, designs to address environmental mitigation, cultural resource investigations, and design-build.
 
# The work qualifies for the small purchases category.  This category includes those contracts with a cost less than $25,000 and required services that are outside the work categories for an hourly rate contract.
 
  
====134.3.1.2 Consultant Procurement====
+
:1. '''All MOUs will be federally funded, therefore, the Project Manager/Contract Administrator (PM/CA) must choose the federal MOU contract from the [http://sp/sites/eagreements/SitePages/Home.aspx eAgreements SharePoint site], unless approved by the PSC to use a state funded MOU contract (state funded MOU contracts may be used if the funding source is the District/Division budget).'''
The consultant’s expression of interest in providing services for MoDOT may range from a short letter outlining the firm’s experience and approach to the project to the submission of a detailed explanation of qualifications, based on the specific criteria contained in the solicitationThe procurement process will determine whether the selected consultant is qualified professionally, is financially capable of performing the services required, and has available properly trained and experienced personnel to perform the required services within the specified time. Various factors and information can be considered to evaluate consultants and determine whether these qualities are present.  It is required that the consultant be [[#134.3.5 Criteria for Evaluating Consultants|evaluated on the criteria listed in State Statute]]; however, additional criteria may also be considered. All roadway and bridge consultants must be evaluated on their past performance at delivering plans that apply practical design concepts.
+
:2. All District MOU’s must be reviewed and approved by the assigned Design Liaison Engineer prior to selection of an on-call consultant to ensure all other resources have been considered.
 +
:3. PM/CA to choose the MOU contract from the eAgreements SharePoint site.
 +
:The federal MOU contract must be used for all MOU’s unless approved by the PSC to use a state funded MOU contract (state funded MOU contracts may be used if the funding source is the District/Division budget). When the agreement is created and saved in eAgreements, the system will auto-assign a new file nameThis auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.
 +
:4. Development of Scope of Services and DBE Requirements – Once the scope of work is defined, the MoDOT PM/CA must obtain a DBE Goal by sending the appropriate project information (including scope, county, estimated construction cost, and potential subcontracting opportunities) using the [https://epg.modot.org/forms/general_files/ECR/Estimated_Breakdown_Of_Work_for_DBE_Goal_for_MoDOT_Consultant_Engineering_Contracts.xlsx Estimated Breakdown of Work Spreadsheet] to MoDOT External Civil Rights (ECR) for review at DBEConsultGoal@modot.mo.gov. Once the DBE goal has been established by ECR, it shall be included in the MOU. All consultant contracts <u>that utilize federal funds</u> must be reviewed by ECR, regardless of the dollar amount of the contract. If the prime consultant or any sub-consultants are DBE firms, the DBE section must be filled out. If the prime or subs are not DBE firms, the DBE section can be left blank.
 +
:5. The PM/CA will review the on-call consultant list and choose a consultant based on the scope of services that has been developed and DBE goal established. The on-call consultant list is found on the [https://www.modot.org/consultant-prequalification-list MoDOT Website – Consultant Services – Consultant Prequalification Requirements]. 
  
The district, and/or division, forms a team to review the consultant responses and select a firm to provide the necessary services. The team shall include at least three members, one of whom is from the Central Office (usually a Design or Structural Liaison Engineer).  If a major component of the project is a specialty area supported only by Central Office staff, that division should be asked to participate as well.  If federal funding will be used for the consultant’s work, as in a full-oversight project, the Federal Highway Administration (FHWA) must be offered the opportunity to participate as a team member. Should another entity (KDOT, IDOT, MPO, city, county, etc.) be funding part of the cost of the work, that entity must be offered the opportunity to participate as a member of the selection teamIf the consultant’s team is expected to include a public involvement sub-consultant, the PSC, including the Community Relations Director, should be invited to participate on the team.
+
:'''Note: Only firms that are prequalified with MoDOT financially can be chosen from the on-call consultant list. Firms must update their information yearly in order to stay current on their prequalificationMoDOT’s consultant prequalification list can be found on the [https://www.modot.org/consultant-prequalification-list MoDOT Website – Consultant Services – Consultant Prequalification Requirements]. '''
  
=====134.3.1.2.1 Evaluating the Solicitation Response and Preparing the Short List of Interested Firms=====
+
:6. Consultant agreements are to be sent to the assigned Design Liaison Engineer for “Review by Staff” in eAgreements.
 +
<div id="7. DBE Concurrence must be obtained"></div>
 +
:7. DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded MOU to the consultant for execution.  The PM/CA will send External Civil Rights (email group '''DBEConcurrence''') as a “Reviewer”, along with the assigned Liaison Engineer, when processing the agreement for “Review by Staff” in eAgreements.  ECR will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.     
 +
:8.  After receiving the DBE Concurrence from External Civil Rights, the PM/CA will send the MOU to the consultant for execution. Agreements may be executed by wet signatures or [[media:134 Docusign.pdf|electronic signatures in DocuSign]]. Electronic signatures are encouraged to expedite the execution process.
 +
:9. The respective District Engineer, division engineer or Executive Committee member will execute the MOU as described in MHTC Policy "Delegation of Authority for Approval and Execution of Documents".
 +
:10.  If using electronic signatures, copies of the fully executed agreement will be distributed to the recipients entered into DocuSign (see below for the Central Office Divisions that must receive a copy of the fully executed agreement).
  
Prior to receiving the solicitation responses, the team develops [[#134.3.5 Criteria for Evaluating Consultants|criteria for selecting the “short list”]] and a [[Media:Rating Form for Selecting Short List.doc|rating form]] for documenting the results.  While the team determines the criteria chosen, they should be specific to the project needs. The list below is a generic range of items that must be considered at minimumBased on the unique aspects of each project, additional criteria can and should be used.
+
:If using wet signatures, the PM/CA is responsible for uploading a copy of the fully executed MOU in [http://sp/sites/eagreements/SitePages/Home.aspx eAgreements], sending the consultant a copy of the fully executed agreement, and sending a link to the fully executed agreement to the appropriate Central Office Divisions. (See Item 9, below, for the Central Office Divisions that must receive a copy of the fully executed agreement.)  
  
* The consultant’s current personnel and their qualifications are evaluated based upon:
+
:11. The PM/CA must email an electronic link to the fully executed agreement to the following Central Office Divisions:  
*# Brochures, résumés, and other data the firm submits that indicate in detail the education and experience of key personnel.  If necessary, the team will personally interview firm members.
+
::* Financial Services Division (email group '''Obligate''' with message '''“Obligate - please obligate funds for the fully executed agreement”''' and provide any specific funding details here, as applicable).
*# Personal knowledge of the past performance of key personnel.
+
::* Design Division (email group '''CODEPSCReview''' with message '''“CODEPSCReview - fully executed agreement for your records”''').  
*# The experience of the consultant’s key personnel in related work such as computer aided drafting and design, photogrammetry, traffic analysis, soil analysis, structural design, hydraulics, signalization, lighting, environmental documents, historic preservation, etc.  
 
  
* The consultant’s firm is evaluated on experience in the type of design or other professional services required under the proposed contract – such as rural, urban, bridge, planning studies, environmental studies, etc. – and the complexity of those services.
+
:'''Note:''' If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing NTP to the consultant:
 +
::* Financial Services indicating the obligation of funds is complete.  
 +
::* External Civil Rights (ECR) indicating concurrence in DBE participation.
  
* MoDOT’s past experience with the consultant for other engineering or professional services is evaluated based on:
+
:12. The PM/CA will send the [[media:134.4.2 2016.docx|NTP letter (Fig 134.4.2)]] to the consultant AFTER:
*# The quality of the work the consultant has delivered for MoDOT.
+
::* Receiving DBE concurrence from External Civil Rights
*# The consultant evaluation forms for MoDOT contracts completed by MoDOT staff shall be reviewed to ensure the consultant has received a satisfactory or better rating.  Ratings less than satisfactory will warrant further investigation to determine if noted deficiencies have been corrected.  The evaluations can be found in the Design Consultant Database in Lotus Notes.
+
::* Execution of the contract
*# The consultant’s past performance related to practical design should be considered separately from the overall performance.
+
::* Obligation of federal funds by Financial Services.
  
* The consultant’s proximity to and familiarity with the project area.
+
==134.3 Consultant Contract Negotiation==
 +
Tasks, hours and price are negotiated after a consultant is selected and notified. During this process, price can be considered. Firms must be listed on the Approved Annual Financial Pre-Qualification List in order to provide professional services to MoDOT. '''Additional scope beyond what was advertised in the RFQ cannot be negotiated into the contract.'''
  
* The financial status of a consultant is considered sound and adequate unless there is evidence to the contraryInvestigation into the consultant’s financial status is not required.
+
The selected firm will use the provisional overhead rate that was accepted by MoDOT during the firm’s prequalification process with MoDOT. If the firm elects to voluntarily reduce their overhead rate, the following language must be incorporated into the contract:
 +
 +
:“The Company has voluntarily reduced its overhead rate to ___%.  This rate will be used on all billings.  Upon completion of these services outlined under this Agreement the final payment for these items will be based on accounting records of the Consultant incurred during the period of the AgreementMoDOT reserves the right to require the actual audited overhead rates be used if those rates are less than the voluntarily reduced rate noted previously.
  
* The adequacy of the consultant’s instant staffing, together with available additional staffing for the proposed service, is evaluated to ensure that the consultant can provide the required services in the desired time frameThe consultant’s present work load of existing MoDOT contracts for design or other professional services can be a factor in this determination.  
+
===134.3.1 Engineering Services Contract (ESC)===
 +
Contract negotiation should follow the schedule provided in the solicitation. Consult Chief Council’s Office CCO early in the negotiation phase for any proposed changes in the boilerplate agreement language. Modifications to the standard agreement language may be considered only where no other compromise can be reached to successfully negotiate the agreement, and '''must be approved “as to form” by CCO.''' If the PM/CA works with their Regional Counsel to approve the revisions to the boilerplate agreement, that Regional Counsel will need to approve the partially executed contract “as to form”In general, no changes are allowed to the ESC.
  
The team develops a short list by reviewing the letters of interest or proposals received, consultant evaluation forms for previous MoDOT work, available information concerning the consultant’s staffing levels and qualifications, and the work experience of the firmsEach response should be rated on the established criteria contained in the rating form created for the project.  This information must be kept to document the process of selecting the short list.
+
The standard engineering services contracts (ESCs) can be found in the [http://sp/sites/eagreements/SitePages/Home.aspx eAgreements SharePoint site].  ESCs must follow the eAgreements process for drafting, reviewing and executing, as defined in [[:Category:153 Agreements and Contracts|EPG 153 Agreements and Contracts]] and the [http://sp/sites/eagreements/TrainingDocuments/Forms/AllItems.aspx eAgreements Training Manual]In addition, the appropriate approvals must be obtained through the Professional Services Committee (PSC) process.  When the agreement is created and saved in eAgreements, the system will auto-assign a new file name.  This auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.
  
For the majority of MoDOT contracts, the short list does not require PSC chair approval; it simply documents the consultant selection process.  However, for any selection that involves a presentation, the PSC chair must [http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC_Short_List_Approval_Letter.docx approve the short list]. The shortlist will be added, in alphabetical order, to the same [http://www.modot.mo.gov/business/consultant_resources/geninfodesignconsultans.htm General Information for Consultants] website with the anticipated date of the final selection.
+
The MoDOT unit responsible for the contract, either the district or the division, provides the consultant with an electronic PDF copy of the tentative contract. The tentative scope of services (including [[237.14 Electronic Design Data Delivery (BIM Deliverables)#237.14.4 Specifications of Electronic Design Data for Consultants and MoDOT|Specifications of Electronic Design Data for Consultants and MoDOT]]) may be provided in a non-PDF electronic format. The PM/CA is responsible for completing the Consultant Contracts. Contract language must be approved by CCO input prior to execution of the contract.  
  
The short-listed consultants must participate in a presentation or interview session with the selection team for projects that involve a feasibility study, an environmental assessment, environmental impact statement, major river bridge design, or a major investment study.  If the scope of services includes extensive public involvement or the use of a public involvement sub-consultant, the short-listed firms must give presentations to the selection team.  The consultant interview or presentation may also be used with any type of project for which the PSC chair or the district determines it to be necessary or desirable.
+
After reviewing the tentative contract and scope of services, the consultant prepares a proposal containing a detailed estimate of cost that includes task-hours, basic pay rates, pre-qualification accepted overhead rates, direct costs and fixed fee. Each of these items is reviewed by MoDOT to ensure it is reasonable with respect to the type of work involved and anticipated size of the contract. PM/CAs are responsible for the quality and content of professional services agreements. [[media:134.3.1 2017.doc|Fig. 134.3.1, District Checklist for Reviewing Consultant Contracts]] is a tool provided for PM/CAs to utilize while reviewing contracts.
  
For services other than those specifically noted above as requiring a consultant presentation or interview, selection may be made without interviews or presentations as discussed in [[#134.3.2.2.3 Review by Chief Counsel's Office (CCO)|EPG 134.3.2.2.3 Review by Chief Counsel's Office (CCO)]].
+
Prior to receiving & negotiating the Scope and Fee from the selected firm, the PM/CA shall develop an Independent Cost Estimate (ICE) in compliance with 23 code of Federal Regulations (CFR) Part 172.7(a)(1)(v)(B) to serve as the basis for the negotiation of the contract.
  
=====134.3.1.2.2 Consultant Selection with Interviews or Presentations=====
+
After the PM/CA and consultant agree to the terms of the agreement, the PM/CA converts the Word document to a pdf file in eAgreements. The pdf file should include the Scope of Services and Exhibits.  
  
The short-listed consultants must participate in a presentation or interview session with the selection team for projects that involve a feasibility study, an environmental assessment, environmental impact statement, major river bridge design, or a major investment studyIf the scope of services includes extensive public involvement or the use of a public involvement sub-consultant, the short-listed firms must give presentations to the selection team.
+
====134.3.1.1 Liability Insurance====
 +
The MoDOT Standard Consultant Contract language includes provisions for the amount of liability insurance that the consultant must provide to cover claims that may result from errors, omissions, or negligent acts of the consultant. Insurance Certificate of Liability must meet [http://insurance.mo.gov/industry/sovimmunity.php Missouri’s Sovereign Immunity Limits].  In rare instances, the PM/CA may request an Acceptance of MHTC Liability to reduce the insurance requirements on the consultantsThis process must obtain PSC approval and follow the procedures outlined in the Acceptance of MHTC Liability, available through the CCO, depending on the nature and complexity of the services.  
  
'''Presentations'''
+
A copy of the certificate of liability insurance for the prime consultant is to be requested by the PM/CA and kept in the project files with the executed contract. It is the responsibility of the consultant to meet the insurance requirements of the contract. Receipt of the consultant’s certificate of insurance liability does not imply approval of the amounts.
The leader of the selection team will coordinate with the Central Office to arrange for individual consultant presentations before the entire PSC, including a representative of Community Relations, the DE, and appropriate district staff.  Before the presentations, the selection team must determine the scoring criteria to be used. These criteria can include many variables, but each element must be assigned a point value and expectations for assigning the maximum points should be developed.  See the sample letter [[Media:Invitation to Present.doc|inviting the consultant to present]].  Following these presentations, the selection team and the PSC will reach consensus on which consultant will be selected to provide the professional services. A sample format for these presentations (the time indicated is a guideline) follows:
 
* Introduction of selection committee (5 minutes)
 
* Presentation (15-20 minutes)
 
* Questions from selection team on the presentation or handouts (20-30 minutes)
 
* Close (5–10 minutes)
 
* Time between presentations (30 minutes)
 
  
After each consultant presentation, the selection team moves to a private location to discuss the presentation as that consultant leaves and the next is setting up for their presentation.  After the final presentation, each member of the selection team will individually develop a numeric score to rate each firm based on the pre-determined [[Media:Criteria and Point Values for rating Presentations and Interviews.doc|criteria and scoring process]]. Although use of the example is not required, the criteria and scoring process must be determined prior to the actual presentation. The team will, as a group, compare these scores and discuss how they were determined; the team must reach consensus on the consultant to select.   
+
====134.3.1.2 Payment Bond====
 +
State statute requires that in the event that any subconsultants are used to supply at least twenty five thousand dollars ($25,000) worth of materials and/or labor not within the scope of environmental assessment services or licensed professional services as defined by [https://revisor.mo.gov/main/OneChapter.aspx?chapter=327 Chapter 327, RSMo], the consultant shall require any such subconsultants to provide laborers and materialmen with adequate bond security.   
  
The team will create a [[Media:Rating Summary for Documenting Selection Process.doc|rating summary]] for all the firms, clearly indicating which firm is recommended for selection and documenting the selection process. The rating summary is only one tool used in the selection.  Although selection of the highest scoring firm is not required, if it is not selected the reasons must be documented.  This documentation will be kept in the project file and a copy sent to the Central Office for approval by the PSC chair ([http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Consultant%20Selection%20%20letter.doc sample letter]).  The team must receive approval before notifying the consultant that was selected or any other parties.  The approved selection will be posted on the General Information for Consultants website.
+
The payment bond value shall equal the amount of the total subcontracted non-engineering services and applicable direct costs. If there is uncertainty about whether an item of work is considered as non-engineering or as an applicable direct cost, it should be included in the amount covered by the payment bond. Fully document all decisions regarding contracted services not included in the payment bond amount and retain in the project file until the contract has been closed and audited for final payments. A copy of the payment bond is to be requested by the project manager and kept in the district project files with the executed contract.  
  
'''Interviews'''
+
For more information on the payment bond language, refer to [[153.9 Design|DE01 Consultant Services Master Agreement (All_Fees)]].
For a feasibility study, environmental assessment, environmental impact statement, major river bridge design, or major investment study, the selection team should conduct interviews with the short-listed firms.  This requires considerable preparatory work; however, the selection team can limit the number of consultant staff and specify particular individuals as well as the opening topics.  (See the [[Media:Invitatin to Interview.doc|sample letter of invitation]]). Before the interviews, the selection team must determine the interview questions to be asked along with a description of the correct type of answer.  Depending on the complexity of the questions, 15 – 18 questions will fill the time allotted.  Additionally, the scoring criteria to be used must be pre-determined.  These criteria can include many variables, but each element must be assigned a point value and expectations for allocating the maximum points should be developed.  The consultants should not be allowed to bring anything into the interview.  A sample format for an interview (with time guidelines) follows:
 
* Introduction and opening comments by consultant (5 – 10 minutes)
 
* The consultant responds to predetermined questions (45 minutes)
 
* Closing comments from consultant (5 minutes)
 
* Time between interviews (30 minutes)
 
  
During the interview, each team member individually scores the consultant as each question is answered.  After each interview, the selection team discusses the consultant responses and averages the scores from the entire team. After the final interview, the team will, as a group, compare these scores and discuss how the firms rank; the team must reach consensus on the consultant to select. The team will create a rating summary clearly indicating which firm is recommended for selection and documenting the selection process. The rating summary is only one tool used in the selectionAlthough selection of the highest scoring firm is not required, if it is not selected the reasons must be documented. This documentation will be kept in the project file and a copy sent to the Central Office for approval by the PSC chair ([http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Consultant%20Selection%20%20letter.doc sample letter]).  The team must receive approval before notifying the consultant that was selected or any other parties.  The approved selection will be posted on the General Information for Consultants website.  
+
===134.3.2 Fixed Fee Review===
 +
The fixed fee is the profit to the consultant. It is based on the scope, complexity of the project, contract duration, risk to the consultant, amount of sub consultant management, and professional nature of the services as well as the size and type of contract. Fixed fees are calculated based upon direct salary cost. Direct salary cost includes direct labor, overhead on direct labor, plus general and administrative overhead. It does not include travel expenses, printing, miscellaneous expenses or sub consultant costs. The Facilities Capital Cost of Money Rate (FCCM) shall not be included in the fixed fee calculation. The percentage of the fixed fee to the direct salary cost must not exceed the maximum allowable profit curve shown in [[media:134.3.2 2021.pdf| Fig. 134.3.2 MoDOT Allowable Profit Curve]]For standard solicitation contracts, the maximum allowable profit is capped at 15 percent, even if calculated to be higher. For consultant contracts that potentially include multiple future phases, the fixed fee will be based on the estimated total direct salary cost for the current phase plus all future phases. For MOU contracts, the maximum allowable profit is 12 percent as agreed to in the Consultant Services Master Agreement, DE01.  The maximum subconsultant fixed fee for MOUs is also capped at 12 percent.
  
=====134.3.1.2.3 Typical Consultant Selection without Interviews or Presentation=====
+
Fixed fees shall not be calculated on direct expenses. Sub consultants are a direct expense to the prime consultant. Therefore, sub consultant expenses are not included in the fixed fee calculations for the prime consultant. It should be noted the “fixed fee” is a fixed dollar amount and will be paid in full at the conclusion of the contract, even if the consultant does not use all the hours in the contract. Therefore, care should be taken to not overestimate man-hours.
  
The majority of projects needing consultant services do not require interviews or presentations and the selection team may select a consultant based upon the available qualification data used to  
+
===134.3.3 Task-Hours Review===
develop the short listSpecific conditions that allow the selection of consultants in this manner are:
+
In order to establish a measure of “Fair & Reasonable” a pre-negotiation estimate is required by federal regulations in 2 CFR 200.324.  The MoDOT PM/CA shall develop an estimate based on the task-hours that MoDOT would require to perform the same serviceThe consultant task-hour estimate is reviewed and compared to the MoDOT estimate.  The consultant’s fee proposal submittal must include detailed hours and cost breakdowns by sub-task and by job title. For any subtask on the scope, it should be known how many different people, how many hours per person, any direct expenses, etc. for the prime and any subs. Negotiations should occur to assure that task-hours in the contract are comparable to the MoDOT estimated hours and those from similar projects. PMs should confer with the appropriate Central Office liaison for concurrence with the review.
# The scope and cost of the contract is considered to be minor or routine in nature.
 
# The district or division is very familiar with the qualifications and capabilities of all the short-listed firms from previous services or presentations and believes presentations or interviews will not increase knowledge of the short-listed firms.
 
# The need for an accelerated selection process due to the critical nature of the contract.
 
  
Once a short list of firms has been developed, the selection team will rate these firms based on previously defined performance criteria to determine which is best suited to provide the professional services required.  Each member of the selection team will individually develop a numeric score to rate each firm using the categories listed in [[#134.3.5 Criteria for Evaluating Consultants|Criteria for Evaluating Consultants]] and [[Media:Rating Form for Selecting Short List.doc|Rating Form for Selecting Short List]].  The team will, as a group, compare these scores and discuss how they were determinedThe team must reach consensus on the consultant to select. The team will create a [[Media:Rating Summary for Documenting Selection Process.doc|rating summary]] clearly indicating which firm has been recommended for selection and documenting the selection process.  This documentation will be kept in the project file and a copy sent to the Central Office for approval by the PSC chair ([http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Consultant%20Selection%20%20letter.doc sample letter]).  The team must receive approval before notifying the consultant that was selected or any other parties.  The approved selection will be posted on the General Information for Consultants website.
+
===134.3.4 Basis of Payment===
 +
The majority of Design Consultant Engineering Services Contracts are actual cost contractsThis means that all costs submitted for payment must be based on actual wages, overhead.   Federal regulations ([https://www.acquisition.gov/far/part-16#FAR_16_102 FAR Part 16.102]) prohibit the use of cost plus a percentage of cost or percentage of construction costs as a method of compensation.  The following methods may be used as the basis of payment in a contract:
  
=====134.3.1.2.4 Noncompetitive Consultant Selection=====
+
:* Actual Cost Plus Fixed Fee (majority of contracts)
 +
:* Specific rates of pay (for emergency situations only)
 +
:* Lump Sum (prior approval required).
  
If approved by the PSC chair, a consultant may be selected in a noncompetitive manner under the following circumstances:
+
Each Subcontractor or subconsultant must be identified in the contract. Subcontractor expenses should also be calculated based upon actual costs. Prompt payment of subconsultants is required per [https://www.acquisition.gov/far/part-32#FAR_Subpart_32_9 FAR Subpart 32.9].
# The service is only available from a single provider.  
 
# There is an urgency (involving public safety) that requires the selection be made expeditiously, thus insufficient time for the normal solicitation and selection process.  
 
# After using the normal solicitation process, the PSC determines there is inadequate consultant interest in providing the services.  
 
# A special circumstance exists that meets the approval of the PSC chair.
 
  
Noncompetitive selection involves recommending a consultant to the PSC based upon the consultant’s qualifications (including past experience) to perform the services required. With the recommendation of the other PSC members, the PSC chair can approve the selection of the consultant.  Selections involving Federal-aid contracts must be submitted for FHWA approval prior to using the consultant.
+
Per [[#134.3.5.1 Subconsultant Cost Exceeding $25,000|EPG 134.3.5.1]], if the consultant is using a subconsultant with a cost exceeding $25,000, then the subconsultant shall include a detailed estimate of cost and a detailed overhead rate schedule (cost plus fixed fee breakdown).
  
====134.3.1.3 Master Agreements for Hourly Rate Contracts====
+
Per [[#134.3.5.2 Subconsultant Cost NOT Exceeding $25,000|EPG 134.3.5.2]], if the consultant is using a subconsultant with a cost that DOES NOT exceed $25,000 then a letter quote from the subconsultant can be submitted with the engineering service contract.
Hourly rate contracts are used for quick delivery of small projects that are limited in scope. These contracts are not intended as a means of bypassing the normal selection and negotiation process.  The Design Division maintains a list of consultants that have been approved to perform services under the terms of an hourly rate contract in 12 categories.
 
  
'''District Work Categories:'''
+
Retainage is not allowed as a routine part of the contract i.e. blanket retainage is prohibited.  Payment may be withheld on any particular work item that has not been completed in accordance with the contract.  This can include work incidental to the work item, and required documentation directly related to the work.
# Planning and Conceptual Studies Services
 
# Roadway Design Services
 
# Traffic Operations, Design and Micro-Modeling Services
 
# Surveying Services
 
# Construction and Materials Inspection and Testing Services
 
  
'''Division Work Categories:'''
+
Direct costs must be estimated using current Privately Owned Vehicle (POV) mileage reimbursement rates and per diem rates for Missouri.  These rates can be found on the following web pages. 
# Intelligent Transportation Systems Services
 
# Geotechnical Services
 
# Bridge Design Services
 
# Photogrammetric Services
 
# Environmental Services – Hazardous Waste, Noise Studies
 
# Cultural Resource Services
 
# Subsurface Utility Engineering
 
  
Each district and division has specific consultants that are authorized to provide services in the noted categoriesA district/division may only use the consultants that are authorized for their district/division. Deletions or additions to the master list require the PSC chair’s approval. The master list can be accessed on the MoDOT public web page by selecting “Business with MoDOT” → “General Information for Design Consultants” → “District/Division Hourly Rate Consultant Contracts.” 
+
Mileage, subsistence and lodging must follow federal travel regulation  guidelines.   
 +
:* [http://www.gsa.gov/portal/content/100715 Current POV Mileage Reimbursable Rates]
 +
:* [https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-results?action=perdiems_report&fiscal_year=2024&state=MO&city=&zip= Current Per Diem Rates for Missouri]
  
All consultants that have submitted either [http://www.modot.mo.gov/pdf/business/254AandE.pdf Standard Form 254] or [http://www.modot.org/business/consultant_resources/documents/SF330Instructionsandform.pdf Standard Form 330] Part II (standard forms on public web page) are sent an e-mail soliciting their interest in entering into an hourly rate contract to provide services.  The normal selection and rating process is used to select a firm from those who express interest; one letter summarizing the selection(s) is then sent from each district or functional unit to the chair of the PSCThe summary letter should include the recommended consultant(s) and the rating sheet for all the short-listed firmsWhen soliciting interest for services under the hourly rate contract, firms should be selected based upon the quality of past work in performing the needed services for MoDOT. Consideration should be given to firms that have not provided services to MoDOT.  Hourly rate contracts are a good opportunity to try new and small firms to see what quality of work they can provide.
+
===134.3.5 Subconsultants===
 +
The use of subconsultants is allowed provided that each firm is identified in the engineering services contractDBE firms should be listed under Disadvantaged Business Enterprise (DBE) Requirements, and other subconsultants should be listed in SubconsultantsThe use of 2<sup>nd</sup> and 3<sup>rd</sup> Tier subconsultants is not allowed, that is, only the prime consultant can have subconsultants, the subconsultants cannot have subconsultants. Subconsultants do not have to be prequalified but it is strongly encouraged especially if the subconsultants routinely performs work >$25,000.  
  
The PSC chair approves the selection of consultants to perform hourly rate servicesEvery three years those needing such services develop a short list of qualified consultants from those who have submitted letters of interest and recommend them for selection to the PSC chairTo ensure that hourly rate contracts are used as intended, the PSC has established several guidelines:
+
====134.3.5.1 Subconsultant Cost Exceeding $25,000====
 +
If the consultant is using a subconsultant with a cost exceeding $25,000, then the subconsultant shall include a detailed estimate of cost and a detailed overhead rate schedule (cost plus fixed fee breakdown)[https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.3.6.1.1%20Common%20Unallowable%20Costs.pdf Fig. 134.3.6.1.1] lists common unallowable costs. If the subconsultant is prequalified, the overhead rate listed must be the current overhead rate accepted by MoDOT through the annual financial prequalification processIn this case, a detailed overhead rate schedule would not be required.
  
# The hourly rate contract may be executed for a maximum period of three years, although the master agreement may include provisions for a one-year extension at the end of the three-year period.
+
If the subconsultant is not pre-qualified with MoDOT then the firm shall also include their [[media:134.3.5.1 Form.pdf|Consultant Certification of Indirect Cost Form]]. Each subconsultant in this category must show its overhead in the required format.  [https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.3.6.1.2.pdf Fig. 134.3.6.1.2] provides an example Overhead Schedule.  The detailed overhead rate schedule should be reviewed for possible unallowable costs per [https://www.acquisition.gov/far/part-31 FAR Part 31.2], [https://epg.modot.org/forms/DE%202017%20Forms/LPA/134.3.6.1.1%20Common%20Unallowable%20Costs.pdf Fig. 134.3.6.1.1] lists common unallowable costs. The prime consultant is responsible for ensuring that all subconsultants comply with state and federal regulations, such as E-Verify, and are registered to do business in Missouri.
# No single MOU will exceed a total cost of $100,000, nor shall a single job number have multiple MOUs executed for services that exceed a $100,000 total. MOUs within the $100,000 limit do not need prior PSC approval for execution and can be executed by the DE or division engineer.
 
# Requests for authorization to exceed the $100,000 limit should be made to the appropriate division.  The division forwards the request to the PSC chair, who must obtain the authority of the Commission to execute the MOU.  Typically, a standard contract will be used for the amount over the hourly rate limit.
 
  
The Design Division develops a “Master Hourly Rate Agreement” to be executed by the selected consultant(s)This agreement outlines the basic conditions of the contractual relationship and specifies work category, billing rates, and overhead ratesThe master agreement is the foundation for a Memorandum of Understanding (MOU) that the district later executes with a consultant to address the need for a specific scope of services on a project (more information in [[#134.3.2.3.2 MOUs for Hourly Rate Services|EPG 134.3.2.3.2 MOUs for Hourly Rate Services]]).
+
====134.3.5.2 Subconsultant Cost NOT Exceeding $25,000====
 +
If the consultant is using a subconsultant with a cost that DOES NOT exceed $25,000 then a letter quote from the subconsultant can be submitted with the engineering service contractThe letter should quote the subconsultant’s cost shown in Exhibit III of the consultant contractIt is preferred however, that the subconsultants have cost plus fixed fee break down. If the subconsultant is not pre-qualified with MoDOT, the firm shall also include their [[media:134.3.5.1 Form.pdf|Consultant Certification of Indirect Cost Form]]. The prime consultant is responsible for ensuring that all subconsultants comply with state and federal regulations, such as E-Verify, and are registered to do business in Missouri.
  
===134.3.2 Contracting Procedures===
+
===134.3.6 Ceasing Negotiation===
 +
If the district/division cannot negotiate a reasonable price with the consultant selected, they can formally cease negotiations with a formal written letter and begin negotiations with the next most qualified firm. After the district/division has ceased negotiations with the selected firm and have started negotiations with the next most qualified firm, they cannot go back to the first firm and start another round of negotiations; this is looked upon as price shopping and is unallowable. See the [http://www.fhwa.dot.gov/programadmin/consultant.cfm FHWA Consultant Services webpage] for more information.  If a contract cannot be negotiated with the second consultant, MoDOT may choose to negotiate with the third most qualified consultant. At any time, all proposals may be rejected and MoDOT can re-advertise the project with a revised scope.
  
[[Image:Contracting Procedures Flowchart.png|center|600px]]
+
===134.3.7 Negotiation Documentation===
 +
All correspondence with the consultant during the course of the negotiations shall be documented and included in the eProject file for the consultant contract, including all email correspondence. Document in writing all verbal communication and personal visits with the consultant regarding the contract negotiations and include in the eProject file. These records shall be maintained for a period of three years after the final voucher is submitted in FMIS by Financial Services. If any litigation, claim, negotiation, audit or other action involving the records is started before the expiration of the three-year period, the records are retained until completion of the action and resolution of all issues arising from it or until the end of the three-year period, whichever is later.
  
====134.3.2.1 Contract Negotiations====
+
===134.3.8 Contract Assurances===
In all cases, contract negotiation starts once the selection is made and should follow the schedule provided in the solicitation.  If man hours and project costs cannot be agreed to in a reasonable amount of time, negotiations will be terminated and the next ranked consultant on the short list will be notified to begin negotiations.  Be sure to consult CCO early in the negotiation phase for any proposed changes in the agreement language.  Modifications to the standard agreement language may be considered only where no other compromise can be reached to successfully negotiate the agreement, and must be approved “as to form” by CCO.
+
Prior to executing a contract with a consultant, MoDOT will assure the following:
  
The standard contracts can be found in the left panel of [http://wwwi/intranet/cc/contracts.asp?f=DE&nav=modot CCO’s website]. Click the down arrow below “Contracts” and select “DE” to see a listing of all the standard contracts for the [http://wwwi/design/default.htm Design Division].  The most commonly used contracts are:
+
:1. The consultant has been apprised of all applicable technical work requirements and administrative controls, including those of the FHWA and any other agencies that may have jurisdictions over the project.
# [http://wwwi/intranet/cc/contracts/DE/DE01-FA%20%20Design%20Consultant%20Agreement%20(Federal%20Assistance).doc DE01-FA] for federally funded professional services
+
:2. After selection, the firm was provided all pertinent information relative to the desired engineering services or other professional services requested. The tentative contract set out the scope of the services in sufficient detail to provide the consultant with a definite knowledge of the services and results expected. The consultant was instructed to submit a proposal that indicated clearly identifiable, sufficiently detailed, and easily auditable charges for the work and/or units of work. These proposed charges (rates and man-hours) were reviewed for acceptability before negotiations proceeded.  
# [http://wwwi/intranet/cc/contracts/DE/DE01-SF%20%20Design%20Consultant%20Agreement%20(State%20Funded).doc DE01-SF] for state funded professional services
+
:3. Contracts include a requirement for a three-year retention of records after the final voucher is submitted in FMIS by Financial Services. On actual cost contracts, the consultant was informed that records must be open for inspection by authorized government personnel.
# [http://wwwi/intranet/cc/contracts/DE/DE01-FASUP%20%20Design%20Consultant%20Supplemental%20Agreement%20(Federal%20Assistance).doc DE01-FASUP] for supplemental agreements to DE01-FA
 
# [http://wwwi/intranet/cc/contracts/DE/DE01-SFSUP%20%20Design%20Consultant%20Supplemental%20Agreement%20(State%20Funded).doc DE01-SFSUP] for supplemental agreements to DE01-SF
 
# [http://wwwi/intranet/cc/contracts/DE/DE01-HR%20%20Design%20Consultant%20Agreement%20(Hourly%20Rate).doc DE01-HR] for hourly rate professional services
 
# [http://wwwi/intranet/cc/contracts/DE/DE01-MOU%20%20Memorandum%20of%20Understanding.doc DE01-MOU] for hourly rate memorandums of understanding
 
  
=====134.3.2.1.1 Preparing a Tenative Contract=====
+
==134.4 Contract Approval, Execution and Distribution==
 +
Once the district and the division agree to the man-hours, salary rates, overhead rates, direct costs, and fixed fee, the information is submitted to the PSC for review and approval, via the email group CODEPSCReview. See [[media:134.4.1 2022.docx|Fig. 134.4.1]]. The submittal letter to the PSC documents that the above procedures have been followed and the requirements of Brooks Act, [http://www.fhwa.dot.gov/programadmin/23cfr172.cfm 23 CFR 172] and [https://revisor.mo.gov/main/OneChapter.aspx?chapter=8&lhn=y RSMO Section 8] have been satisfied. When approved by the PSC, the standard contract language, the scope of services and the consultant’s cost proposal are made part of a formal agreement for execution.
  
The district, with assistance from the appropriate division, prepares a more detailed scope of services and a refined pre-negotiation estimate of the man-hours that MoDOT would require to perform the service.  The MoDOT Sample Scope of Services (located on the “DE-Contracts” tab accessed in Microsoft Word by selecting File → New) (including [http://www.modot.org/business/standards_and_specs/documents/ComputerDeliverableContractPlans.pdf Specifications of Computer Deliverable Contract Plans]) for the appropriate type of service is used as a starting point for preparing the scope of services and is modified as necessary to fit the individual project.  The district and the division will concur in the tentative scope of services and ensure that it adequately describes the services to be performed.
+
Consultant agreements are to be sent to the assigned Liaison Engineers for “Review by Staff” in eAgreements. 
 +
<div id="DBE Concurrence must be obtained from External"></div>
 +
DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded agreement to the consultant for execution.  The PM/CA will include External Civil Rights (email group '''DBEConcurrence''') as a “Reviewer”, along with the assigned Liaison Engineers, when processing the agreement for “Review by Staff” in eAgreements.   External Civil Rights will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.    
  
If the contract cost will be $1,000,000 or more, contact [http://wwwi/intranet/rm/ Resource Management] at this time to determine whether federal funding will be available for financing the contract. The decision to use federal or state funds determines the appropriate contract language to be used.  If federal funds are used to pay for professional services, the district must send a copy of the scope of services to the External Civil Rights Administrator for their review and determination of the DBE goal that must be met by the consultant.
+
After receiving the DBE Concurrence from External Civil Rights, the contract may be executed. MHTC authorization to execute the contract may be obtained in one of following ways:
  
The MoDOT unit responsible for the contract, either the district or the division, provides the consultant with a printed, or PDF format electronic copy of the tentative contract. The tentative scope of services (including [http://www.modot.org/business/standards_and_specs/documents/ComputerDeliverableContractPlans.pdf Specifications of Computer Deliverable Contract Plans]) may be provided in a non-PDF electronic formatConsultants do not receive electronic copies of MoDOT’s Sample Consultant Contract in a non-PDF format; the standard consultant contract language cannot be changed without Chief Counsel’s input.
+
:1. Projects in the Statewide Transportation Improvement Program (STIP)
 +
:The Commission’s approval of the STIP includes delegation of authority to execute professional services contracts for projects contained in the STIP. The execution of agreements is done either by electronic or wet signatureInstructions are included in the eAgreements Training Manual and summarized below.  
  
After reviewing the tentative contract and scope of services, the consultant prepares a proposal containing a detailed estimate of cost that includes, at a minimum, man-hours, basic pay rates, overhead rates, direct costs, and fixed fee. Each of these items is reviewed to ensure it is reasonable with respect to the type of work involved and anticipated size of the contract.
+
:2. Projects Not Included in the STIP
 +
:To obtain authorization to execute contracts for projects that are not included in the approved STIP and have a contract ceiling exceeding $25,000, the contracts must be presented to the MHTC at a regularly scheduled monthly meeting. The appropriate division places these contracts on the Commission agenda for the next meeting. The District Engineer or division engineer should be prepared to discuss this item at the Commission meeting in case questions arise. After obtaining authorization to execute the contract from the Commission, the contract administrator then proceeds with the execution process.  
  
=====134.3.2.1.2 Liability Insurance=====
+
<u>Execution and Distribution of the Professional Services Contract</u>
The MoDOT Standard Consultant Contract language includes provisions for the amount of liability insurance that the consultant must provide to cover claims that may result from errors, omissions, or negligent acts of the consultant.  These may be increased or decreased after following the procedures outlined in the Acceptance of MHTC Liability, available through the CCO, and with the approval of the PSC Chair, depending on the nature and complexity of the services.
 
  
A copy of the certificate of liability insurance for the prime consultant and sub consultants is to be requested by the project manager and kept in the project files with the executed contract.  It is the responsibility of the consultant to meet the insurance requirements of the contract.  Receipt of the certificate does not imply approval of the amounts.
+
The Professional Services Contract shall be executed [[media:134 Docusign.pdf|electronically in DocuSign]]:
  
=====134.3.2.1.3 Payment Bond=====
+
:* Electronic Signatures – Signing agreements electronically in DocuSign will expedite the execution process.   The PM/CA must add all recipients in the DocuSign site that need to sign and/or receive an electronic copy (see below) of the fully executed agreement.   
State statute requires that a non-engineering or non-surveying consultant, or one who is contracting the services of a sub consultant who is a non-engineering, non-surveying firm, to provide a payment bond as security against monetary claims (such as would result from the prime consultant’s nonpayment of sub consultants) made against individual members of the Missouri Highways and Transportation Commission (also referenced herein as MHTC or the Commission).  However, this provision only addresses the cost of contracted work greater than $25,000 and only non-engineering and non-surveying firms.  Engineering and surveying firms are exempt from the requirements for a payment bondThe following will be used to define an engineering firm:
 
# The name of the consultant contains engineer or engineering.
 
# The company’s letterhead states that the company provides engineering services.
 
# The company’s website states that the company provides engineering services.
 
# The Missouri Board of Engineers, Architects, and Land Surveyors certifies that the company is an engineering company.
 
  
The prime consultant must provide a payment bond for any contract with a total value of more than $25,000 where any non-engineering, non-surveying sub consultants is providing non-engineering and non-surveying services (e.g., geotechnical investigations including, but not limited to, collecting soil samples; archaeological investigations; aerial photography; any excavation work; etc.) and/or applicable direct costs such as printing, copying, any equipment rental, etc.
+
The PM/CA must send an electronic copy of the fully executed agreement to various Central Office Divisions. For electronically executed agreements, this is done by cc:/ in DocuSign. The following are the Central Office Divisions that must be notified:
  
When the sub consultant is also an engineering firm and performs the non-engineering services with its own in-house staff and company-owned equipment, these services do not count toward the $25,000 limit. For instances in which the prime engineering service consultant anticipates using only other professional engineering consultants to perform subcontract work, no payment bond is required.
+
:* Financial Services Division (email group '''Obligate''' with message '''“Obligate - please obligate funds for the fully executed agreement and please advise when we can give a NTP”''' and provide any specific funding details here, as applicable).
 +
:* Design Division (email group '''CODEPSCReview''' with message '''“CODEPSCReview - fully executed agreement for your records”''').  
  
The payment bond value shall equal the amount of the total subcontracted non-engineering services and applicable direct costs. If there is uncertainty about whether an item of work is considered as non-engineering or as an applicable direct cost, it should be included in the amount covered by the payment bond.  Fully document all decisions regarding contracted services not included in the payment bond amount and retain in the project file until the contract has been closed and audited for final payments.  A copy of the payment bond is to be requested by the project manager and kept in the district project files with the executed contract.
+
'''Note:''' If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing Notice to Proceed the consultant:
 +
:* Financial Services indicating the obligation of funds is complete
 +
:* External Civil Rights (ECR) indicating concurrence in DBE participation.
  
=====134.3.2.1.4 Review of Consultant Proposal=====
+
If federal funds were used to finance the contract, Financial Services submits a copy of the executed contract to the FHWA Finance Section for approval. Federal funds will not be paid for charges to the contract prior to FHWA approval. Any supplemental agreements are also submitted to the FHWA after execution.  
'''Man-Hours Review'''
 
In order to establish a measure of “fair and reasonable” a pre-negotiation estimate is required by [http://a257.g.akamaitech.net/7/257/2422/12feb20041500/edocket.access.gpo.gov/cfr_2004/octqtr/49cfr18.36.htm Federal regulation 49 CFR 18.36].  The PM should develop an estimate based on the man-hours that the district would require to perform the same service. The consultant man-hour estimate is reviewed and compared with the MoDOT estimate.  The consultant’s fee proposal submittal must include detailed cost breakdowns by sub-task and by job title.  For any subtask on the scope, it should be known how many different people, how many hours per person, any direct expenses, etc. for the prime and any subs.  The consultant’s man-hours and costs are also compared with data from previously executed consultant contracts for similar services.  Negotiations should occur to assure that man-hours in the contract are comparable to the MoDOT estimated hours and those from similar projects. PM’s should confer with the appropriate Central Office liaison engineer for concurrence with the review.  A draft of the contract is to be sent to Central Office Design for review and submittal to the Audit and Investigations Division and CCO as needed.
 
  
If MoDOT cannot negotiate a contract with the consultant to perform the required services within a reasonable amount of man-hours and a cost that is fair and reasonable, the negotiations may be formally terminated and MoDOT may choose to perform the service with its own forces or negotiate a contract with the consultant rated number two during the selection process.  If a contract cannot be negotiated with the second consultant, MoDOT may choose to negotiate with the third consultant.  At any time, all proposals may be rejected and MoDOT can re-advertise the project with a revised scope.
+
<u>Notice to Proceed Letter</u>
[[Image:134.3.2.1.4 Allowable Profit.jpg|600px|right|thumb|<center>'''Fig. 134.3.2.1.4.  An [[media:134.3.2.1.4 Allowable Profit.pdf|easily printable chart]] is also available.'''</center>]]
 
<div id="Fixed Fee Review"></div>
 
'''Fixed Fee Review'''
 
The fixed fee is based on the complexity of the project, risk to the consultant, and the amount of sub consultant management and should not exceed the MoDOT Allowable Profit Curve.  The consultant’s fixed fee as a percent of the direct salary costs will not exceed the maximum allowable profit indicated by the curve.  No fixed fee is allowed on direct expenses.  Sub consultants are a direct expense to the prime consultant.  It should be noted that the “fixed fee” is fixed and will be paid in full even if the consultant does not use all of the hours in the contract.  Care should be taken not to over estimate man-hours.
 
  
'''Pre-negotiation Audit Evaluation'''
+
The PM/CA is responsible for sending a [[media:134.4.2 2016.docx|Notice to Proceed (NTP) Letter (Fig. 134.4.2)]] to the consultant. The NTP cannot be sent prior to:
Central Office Design will submit the draft proposal to the Audits and Investigations Unit (AI) for a review of the overhead and salary rates in the proposal. Overhead and salary rates are subject to an audit evaluation to test for allow ability as required by 23 CFR 172.5 (c) and Part 31 of the Federal Acquisition Regulation (FAR).
 
* Audit Evaluation. The contract proposal is subjected to an audit evaluation if the cost of the contract exceeds $100,000. An audit evaluation is also performed for a contract of any dollar amount if any of the following are true:
 
*# There is insufficient knowledge of the consultant’s accounting system.
 
*# There is previous unfavorable experience regarding the reliability of the consultant’s accounting system.
 
*# The contract involves procurement of new equipment or supplies for which cost experience is lacking.
 
  
* '''Hourly Rate or Lump Sum Contract Audit Evaluation.'''  AI must review all consultant hourly rate master agreements prior to contract approval.  Any lump sum contract for engineering services is required to have a pre-negotiation audit before approval.  The chairman of the PSC must be notified of the use of a lump sum contract prior to the solicitation or the request for letters of interest.
+
:* Receiving DBE concurrence from External Civil Rights.  
 +
:* Execution of the contract.
  
* '''Required Cost Documentation.'''  Proper cost documentation consists of a detailed overhead schedule, financial statement information, and any other data necessary to show that the consultant has developed an acceptable accounting system and is aware of the FHWA’s cost eligibility and documentation procedures. Acceptable overhead and indirect costs must be in compliance with Part 36 of the Federal Acquisition Regulations Systems (FARS).
+
==134.5 Consultant Contract Administration==
 +
A MoDOT employee will be assigned as the PM/CA for each contract, including contracts in which the services are for project management of a construction project or for contract administration. MoDOT's PM/CA is responsible for administering the contract and overseeing the consultant’s progress towards the provision of services required by the contract. Some of these responsibilities are:
  
An independent audit (an audit performed by another state/federal agency or by a private CPA) is acceptable if the information is current and of sufficient detail. Copies of these audits must be submitted with the proposal. Cost proposals must show hourly labor rates, amount or percent of fixed fee/profit charged, and the overhead percentage used in the proposal.
+
:1. Scheduling and attending progress meetings with the consultant and being involved in decisions leading to change orders or supplemental agreements.
 +
:2. Being familiar with the qualifications and responsibilities of the consultant’s staff.
 +
:3. Assuring that costs billed are consistent with the acceptability and performance of the consultant’s work.
 +
:4. Monitoring the consultant’s operations, as necessary, and adequately documenting contract performance (prior to final settlement of the contract) for later use.
 +
:5. Conducting interim technical and audit evaluations as deemed necessary during the performance of the consultant contract.
 +
:6. Completing performance evaluations in the Design Consultant Database at major milestones and at the completion of the contract. An evaluation is to be completed at least annually.
 +
:7. Notifying the Design Division, Financial Services and AI when a project is complete and finalized. The PM/CA should make arrangements with the Resident Engineer to be notified when construction is complete.  
  
* '''Audit Results.'''  The results of the audit evaluation are considered before contract negotiations are finalizedThe audit evaluation verifies the inclusion of itemized costs that are evident and in accordance with sound accounting principles for the following:
+
===134.5.1 Invoicing===
*# Direct salary
+
The consultant files a monthly invoice and progress report to the PM/CA.  The [[media:134_5_1_1_2021.xlsx|invoice template found in Fig. 134.5.1.1]] must be used for all consultant contracts. Prime consultant invoices '''must''' use Fig. 134.5.1.1. Sub-consultants who have a contract with the prime that is greater than $25,000 must either use Fig. 134.5.1.1 or provide all the information that is listed in this figure to be considered acceptable. Each invoice must be submitted with the necessary supporting documentation and must be numbered in sequential order and label the final invoice as FINAL. The invoice shall be based on the total incurred cost during the invoice periodInvoices should identify each task in the scope of work, as well as the employees and hours spent on each task during the billing period.  Direct costs must also be shown by task.  The [[media:134.5.1.2 July 31, 2012.docx|MoDOT Consultant Invoice Checklist (Fig 134.5.1.2)]] can be used as tools to ensure all proper documentation is in place for each invoice in order for the invoice to be accepted and paid.  [[media:134.5.1.5 Sept 2012.xlsx|Fig. 134.5.1.5]] is available as an example of a filled-out invoice.
*# Payroll additives
 
*# General overhead
 
*# Direct costs
 
*# Profit
 
  
The evaluation ensures that the consultant has an adequate system for segregating and accumulating reasonable, allocatable, and allowable costs for the proposed work. The integrity of individual items is determined and inappropriate charges are subject to exclusion. The proposal may be returned to the consultant with suggestions for alterations and/or revisions.  The contract is not finalized until all questionable audit matters have been resolved.
+
The PM/CA should make every effort to see that the consultant is paid in a timely manner, the goal being 30 days. Missouri law states that the consultant is entitled to interest if the invoice is not paid in 45 days. The 45-day period starts when all questions about the invoice have been addressed and agreed to by both parties.  
 +
<div id="The PM/CA uploads a copy"></div>
 +
The PM/CA uploads a copy of the invoice to Financial Services' [https://modotgov.sharepoint.com/sites/fs_contractual Contractual Payments Library] following the [[media:Contractual_Library_Instructions-2022.pdf|step-by-step instructions]], which includes the PM/CA indicating the invoice as having been reviewed, thus approving it for payment. [[media:134.2.2 Jan 2020.docx|Fig. 134.2.2]] and [[media:134.2.4 July 11 2017.doc|Fig. 134.2.4]] are checklists to help PM/CAs with the paperwork process for Standard and On-call contracts, including invoicing.
  
MoDOT reserves the right to negotiate any audited costs that are believed to be excessive. If project costs cannot be agreed to in a reasonable amount of time, termination of the negotiations may be considered and the next qualified consultant on the short list may be asked to submit an estimate of project costs.
+
The following metadata fields are required:
 +
:* Name (J#, invoice#, Consultant abbrev.)
 +
:* Job No. (include the J)
 +
:* Financial No. (if known)
 +
:* Agreement No. (eAgreements)
 +
:* Payee/Vendor
 +
:* Invoice Date
 +
:* Invoice Number
 +
:* Invoice Amount
 +
:* Final Invoice (if applicable)
 +
:* District/Division/Office
 +
:* Reviewed and Approved (checkbox)
 +
:* Reviewed and Approved By
 +
:* Activity Code
 +
:* Link to eAgreements (first invoice only)
 +
:* Payment Status (default to New Entry)
 +
:* Comment (if necessary).
  
=====134.3.2.1.5 Assurances=====
+
The following are the most frequently used activity codes:
Prior to executing a contract with a consultant, MoDOT will assure the following:
 
# The consultant has been apprised of all applicable technical work requirements and administrative controls, including those of the FHWA and any other agencies that may have jurisdictions over the project.
 
# After selection, the firm was provided all pertinent information relative to the desired engineering services or other professional services requested.  The tentative contract set out the scope of the services in sufficient detail to provide the consultant with a definite knowledge of the services and results expected.  The consultant was instructed to submit a proposal that indicated clearly identifiable, sufficiently detailed, and easily auditable charges for the work and/or units of work.  These proposed charges (rates and man-hours) were reviewed for acceptability before negotiations proceeded.
 
# Contracts include a requirement for a three-year retention of records after the final payment is made under the contract.  On actual cost contracts, the consultant was informed that records must be open for inspection by authorized government personnel.
 
  
=====134.3.2.1.6 Documentation of Negotiations and Records Retention=====
+
{| style="margin: 1em auto 1em auto"
All written correspondence with the consultant during the course of the negotiations is included in and made part of the project file for the consultant contract. Document in writing all verbal communication and personal visits with the consultant regarding the contract negotiations and also include in the project file.  These records shall be maintained for a period of three years after the final invoice is submittedIf any litigation, claim, negotiation, audit, or other action involving the records is started before the expiration of the three-year period, the records are retained until completion of the action and resolution of all issues arising from it or until the end of the three-year period, whichever is later.
+
|-
 +
|'''Activity'''||width="15"| ||'''Description'''
 +
|-
 +
|align="center"|R351||                ||Conceptual Plans
 +
|-
 +
|align="center"|R352||                ||Surveying/Mapping
 +
|-
 +
|align="center"|R354||                ||Preliminary Plans
 +
|-
 +
|align="center"|R356||                ||Final Design Plans
 +
|-
 +
|align="center"|R358||                ||Final Construction Plans
 +
|-
 +
|align="center"|R35A||                ||Support – Build New Hwys & Bridges
 +
|}
 +
 +
If the contract encompasses more than one job number, or if there are separate invoices, each invoice will need to be uploaded separately and the partnering jobs listed in the comment section of the metadata. When the last invoice is submitted for payment, the final invoice checkbox should be checkedThis notifies Financial Services that the contract is complete. (See [[#134.5.3 Consultant Contract Close-Out|EPG 134.5.3 Consultant Contract Close-Out]]).
  
====134.3.2.2 Contract Approval and Execution====
+
If the consultant project/agreement has more than 4 jobs associated with it, the PM/CA will continue to submit the Consultant invoices to Financial Services electronically by utilizing the Contractual Payments system.
  
=====134.3.2.2.1 Professional Services Committee (PSC) Approval=====
+
Design-Build (contractor) invoices and non-contractual invoices will continue to be submitted electronically by email to Financial Services at '''Contractual.Payments@modot.mo.gov.''' However the design-build consultant invoices should be submitted using the Contractual Payments Library.
MoDOT has identified a team to monitor the selection of engineering consultants and ensure that any engineering contracts satisfy the requirements of the [http://www.acec.org/advocacy/brooks.cfm Brooks Act], [http://www.gpo.gov/nara/cfr/waisidx_04/23cfr172_04.html 23 CFR 172] and [http://www.sos.mo.gov/adrules/csr/current/15csr/15c60-8.pdf RSMO Section 8]These regulations prescribe policies and procedures for contracting to ensure that a qualified consultant is obtained through an equitable selection process and that prescribed work is properly accomplished in a timely manner and at a reasonable cost. The PSC was created to fulfill this role. 
 
  
The PSC will have the contract language reviewed to see whether any changes to the standard contract language are acceptableA Central Office liaison engineer will review the scope of services to see whether it is appropriate and provides clear and concise directions to the consultant.  They will also review the cost estimate to ensure that the number of man-hours anticipated by the consultant is reasonable.
+
If errors are found on the consultant invoice, the PM/CA should contact the consultant and request a corrected invoice. The PM/CA should never change an invoiceThe invoice should be sent back to the consultant for corrects and '''they must re-date the invoice''' and re-submit to MoDOT.  If the consultant makes an error and requests more reimbursement than allowed by the contract, the PM/CA may submit the invoice and authorize payment of an amount less than the invoice requests. The reasons for paying an amount different than the invoice requests must be clearly documented in the cover letter.  
  
Once the district, the division, and AI agree to the man-hours, salary rates, overhead rates, direct costs, and fixed fee, the information is submitted to the PSC for review and for the PSC chair’s approval.  See the [http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Letter%20Request%20to%20Execute%20Contract%20DBE.dot sample letter requesting PSC approval of the final consultant selection] and negotiated hours and costs.  The submittal letter to the PSC documents that the above procedures have been followed and the requirements of Brooks Act, 23 CFR 172 and RSMO Section 8 have been satisfiedWhen approved by the PSC, the standard contract language, the scope of services, and the consultant’s cost proposal are made part of a formal agreement for execution.
+
If the period of service in the contract has lapsed, a letter to extend the period of service signed by both MoDOT and the consultant must be completed prior to paying any invoices.  For hourly-rate contracts the period of service is defined in the MOU not the Master Agreement.
 +
<div id="Consultant invoices for projects"></div>
 +
Consultant invoices for projects administered by the [https://modotgov.sharepoint.com/sites/br Bridge Division] should be submitted electronically by the consultant directly to '''BRInvoiceAdmin@modot.mo.gov''' and the Structural Liaison Engineer assigned to the project should be copied on the email.
 +
   
 +
Electronic payments to a consultant may be set up by submitting an “Electronic Funds Transfer” form. Information is available at [https://missouribuys.mo.gov/ MissouriBUYS].
  
=====134.3.2.2.2 Execution of Contracts=====
+
====134.5.1.1 Workforce Diversity Verification====
MHTC authorization to execute the contract may be obtained in one of following ways:
+
The workforce diversity verification section of the template invoice ([[media:134_5_1_1_2021.xlsx|Fig. 134.5.1.1, Blank Consultant Invoice ]]) must be filled out.  The verification summary should contain the '''project team’s''' diversity, not the company wide diversity. For reporting purposes, females and minorities are the only diversity categories that must be reported in the verification summary.  The following groups are considered to be minorities: Black, Hispanic, Asian, American Indian, Native Hawaiian or Pacific Islander. The report is based on the hours worked by minorities and women during each invoicing period.
* Projects in the Statewide Transportation Improvement Program (STIP)
 
The Commission’s approval of the STIP includes delegation of authority to execute professional services contracts for projects contained in the STIP.  The district or division will forward four copies of the contract, executed by the consultant, to the Design Division, who will submit them to CCO for approval as to form and then to the Commission Secretary, who has the appropriate individuals execute them.
 
  
* Projects Not Included in the STIP
+
===134.5.2 Supplemental Agreements===
To obtain authorization to execute contracts for projects that are not included in the approved STIP and have a contract ceiling exceeding $25,000, the contracts must be presented to the MHTC at a regularly scheduled monthly meeting.  The appropriate division places these contracts on the Commission agenda for the next meeting.  The DE or division engineer should be prepared to discuss this item at the Commission meeting in case questions ariseAfter obtaining authorization to execute the contract from the Commission, the contract administrator forwards four copies of the contract, executed by the consultant, to CCO for approval as to form and then to the Commission Secretary, who has the appropriate individuals execute them.
+
Supplemental agreements are used to add/delete work within the scope of services that was advertised in the RFQ.  Supplemental agreements cannot be used to increase the scope of work outside the solicitation/RFQ or to increase overhead or fixed feeFor example, a no cost supplemental agreement can be executed to extend the period of service as outlined in the original consultant contract.
  
=====134.3.2.2.3 Review by Chief Counsel's Office (CCO)=====
+
Each supplemental agreement must include new subconsultants, and modifications to the scope of services, new cost estimates and schedule or period of service adjustments as applicable.
  
The contracts are submitted to CCO for approval as to form.  If one of the approved standard contracts is used and no modifications are made, the CCO will not need to review the contract language prior to its submission for approval of form at the time of execution.  If changes are made to the standard contract language, a copy of the CCO approval must be included with the submittal of the draft contract prior to execution by the Consultant.
+
Costs associated with these modifications to the scope of services may be covered by the unit costs included in the original contract or by a newly negotiated cost in the supplemental agreement. Direct costs and overhead costs for the services contained in the supplemental agreement should reflect the costs that will be in effect during the performance of the service. 
 +
<div id="Once it is determined that the scope of services"></div>
  
After CCO approves the contract as to form, it is forwarded to the Commission Secretary for execution. MOUs do not require CCO review (Refer to [[#134.3.2.3 Hourly Rate Contracts|EPG 134.3.2.3 Hourly Rate Contracts]] for details on executing MOUs).
+
Once it is determined that the scope of services needs modification, the PM/CA follows the same negotiation process for the supplemental agreement that is followed for new contracts through submission to the PSC, via the email group CODEPSCReview. Any modifications to the scope of services, whether it results in a change in cost or not, must be included in an approved supplemental agreement. If a DBE goal was established in the original contract it will continue to apply. The agreement must be executed prior to the consultant receiving authorization to proceed with the modified scope of services. Supplemental Agreements for extension of time, with no additional cost, are not required to be submitted through the PSC. The district or division director has the delegation of authority to sign the Supplemental Agreement if the total contract is below $100,000. If the combined original contract cost and the supplemental agreement cost are above $100,000, then a member of the Executive Committees must sign the supplemental agreement. The executed copy of the Supplemental Agreement must be submitted through CODEPSCReview.  
  
=====134.3.2.2.4 Distributing the Executed Contract=====
+
When a supplemental agreement is necessary, additional funds to cover the added costs in the contract must be identified from the appropriate budget category and be approved as a necessary expenditure.  
  
Design Division distributes copies of the executed contract except for Bridge projects and projects not included in the STIP, which the Project Manager is responsible for distributing. After the contract is executed, one copy is provided to each of the following:
+
Supplemental agreements shall be sent to the assigned Liaison Engineers for “Review by Staff” in eAgreements. 
# The consultant – should have original signature
+
<div id="DBE Concurrence must be obtained from External Civil"></div>
# The Commission Secretary keeps a copy with original signature
+
DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded agreement to the consultant for execution.  The PM/CA will include External Civil Rights (email group '''DBEConcurrence''') as a “Reviewer”, along with the assigned Liaison Engineers, when processing the agreement for “Review by Staff” in eAgreements. External Civil Rights will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.    
# The project file in the district/division.
 
# Design Division – adds to statewide tracking database for consultant activities
 
# Audits and Investigations (for end of contract audit)
 
# Controller’s Office – for paying invoices
 
# Resource Management – for federally funded contracts only, no copy required for contracts that are 100 percent state-funded.
 
  
If federal funds were used to finance the contract, [http://wwwi/intranet/rm/ Resource Management] submits a copy of the executed contract to the FHWA Finance Section for approval.  Federal funds will not be paid for charges to the contract prior to FHWA approval. Any supplemental agreements are also submitted to the FHWA after execution.
+
After receiving the DBE Concurrence from External Civil Rights, the contract may be executed. The contract information is submitted to the PSC via the email group CODEPSCReview using [[media:134.5.2_2023.docx|PSC Approval to Execute Supplemental Agreement,
 +
Fig. 134.5.2]]. After PSC approval, the PM/CA will execute the supplemental agreement. The supplemental agreement is executed [[media:134 Docusign.pdf|electronically in DocuSign]]:
  
The project manger is responsible for sending a Notice to [[Media:Notice to Proceed Letter.doc|Proceed letter]] to the consultant.
+
:* Electronic Signatures – Signing agreements electronically in DocuSign will expedite the execution process.   The PM/CA must add all recipients in the DocuSign site that need to sign and/or receive an electronic copy (see below) of the fully executed supplemental agreement.  
  
====134.3.2.3 Hourly Rate Contracts====
+
The PM/CA must send an electronic copy of the fully executed supplemental agreement to various Central Office Divisions. For electronically executed agreements, this is done by cc:/ in DocuSign. The following are the Central Office Divisions that must be notified:
  
=====134.3.2.3.1 Master Agreements for Hourly Rate Services=====
+
:* Financial Services Division (email group '''Obligate''' with message '''“Obligate - please obligate funds for the fully executed agreement”''' and provide any specific funding details here, as applicable).
 +
:* Design Division (email group '''CODEPSCReview''' with message '''“CODEPSCReview - fully executed agreement for your records”''').  
  
Hourly rate contracts are an effective tool for small, short-duration contracts under $100,000. They are similar to a standard contract but are separated into two parts.  The first part, called Hourly Rate Contract or Master Agreement, establishes the hourly billing rates that the consultant may charge when providing services.  The hourly billing rates include labor rates, payroll additives, general and administrative overhead, and profit.  The Master Agreement contains all the general contract language that is not project-specific, such as insurance, non-discrimination, and audit requirements.  The second part is the MOU and includes the project-specific scope of services and cost estimates. 
+
'''Note:''' If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing Notice to Proceed to the consultant:
 +
:* Financial Services indicating the obligation of funds is complete
 +
:* External Civil Rights (ECR) indicating concurrence in DBE participation
  
Districts and Divisions select qualified consultants from those submitting letters of interest in response to a solicitation as discussed in [[#134.3.2.4 Contract Administration|EPG 134.3.2.4 Contract Administration]] Steps for obtaining professional services on an hourly rate basis include: 
+
If federal funds were used to finance the contract, Financial Services submits a copy of the executed contract to the FHWA Finance Section for approval. Federal funds will not be paid for charges to the contract prior to FHWA approval. Any supplemental agreements are also submitted to the FHWA after execution.
# The PSC chair will approve the selection of a consultant for a particular work category and district.  The Design Division begins developing the master agreement. 
 
# The consultant prepares a schedule of hourly billing rates that will be negotiated and attached to the agreement as Exhibit 1.  The standard master agreement is located on MoDOT’s internal website under “Chief Counsel’s Office.”  From the dropdown menu under “contracts” on the left-hand panel, select the folder labeled “DE.
 
# The master agreement will include hourly rates for each type of employee and each type of service.  Since the amount of future services to be performed under the agreement is unknown, the allowable profit based upon direct labor cost is limited to 12 percent.
 
# Once the hourly billing rates have been negotiated sufficiently to satisfy the Design Division, the rates are forwarded to AI for review. AI determines whether the costs are comparable to those for similar services and checks to see that the overhead rates are consistent with the latest audited information.
 
# After AI concurs with cost information, Design Division instructs the consultant to submit four executed copies of the master agreement.  The Design Division forwards the agreement to the CCO for approval as to form, then to the Commission Secretary for execution.  Once MoDOT executes the agreement, the Commission Secretary retains one copy and returns the remaining copies to the Design Division.  Design then distributes copies as detailed in [[#134.3.2.2.4 Distributing the Executed Contract|EPG 134.3.2.2.4 Distributing the Executed Contract]]  The district then follows the procedures below for executing individual MOUs to obtain services as the need arises.
 
  
=====134.3.2.3.2 MOUs for Hourly Rate Services=====
+
<u>Notice to Proceed Letter </u>
The DE or division engineer (with occasional exceptions) executes MOUs for hourly rate professional services as described in MHTC Policy “Delegation of Authority for Approval and Execution of Documents” (see also previous discussion in [[#134.3.2.3 Hourly Rate Contracts|EPG 134.3.2.3 Hourly Rate Contracts]]).
 
# The contract administrator notifies the appropriate division of executed MOUs and supplemental agreements and distributes copies of the MOUs and supplemental agreements as detailed in [[#134.3.2.2.4 Distributing the Executed Contract|EPG 134.3.2.2.4 Distributing the Executed Contract]] except that copies for the Commission Secretary and Resource Management are omitted.  A copy of the MOU with any supporting documentation and a cover letter serves as proper notification to the division.
 
# All original contracts, supplemental agreements, and MOUs will be executed by all parties prior to any services being performed under the contract.  The consultant shall be given a written notice to proceed; documenting the date services can start being charged to the contract.
 
# The PSC chair must approve any request from a consultant for a one-year extension of the contract beyond the original three-year period.
 
# Consultants may change billing rates annually but the first change in billing rates cannot occur before the contract’s one-year anniversary and changes in rates apply only to MOUs executed after the date approved for the change.
 
# A copy of the approved billing rates being used in the MOU is to be attached to the MOU.  Only approved personnel and rates are authorized for use.
 
  
====134.3.2.4 Contract Administration====
+
The PM/CA is responsible for sending a [[media:134.4.2 2016.docx|Notice to Proceed (NTP) Letter (Fig. 134.4.2)]] to the consultant. The NTP cannot be sent prior to:
 +
:* Receiving DBE concurrence from External Civil Rights.
 +
:* Execution of the contract
 +
:* Obligation of federal funds by Financial Services.
  
A MoDOT employee will be assigned as the contract administrator for each contract, including contracts in which the services are for project management of a construction project or for contract administration.  The department’s contract administrator is responsible for administering the contract and overseeing the consultant’s progress towards the provision of services required by the contractSome of these responsibilities are:
+
===134.5.3 Consultant Contract Close-Out===
# Scheduling and attending progress meetings with the consultant and being involved in decisions leading to change orders or supplemental agreements.
+
To close out a consultant contract the PM/CA must notify Design, External Civil Rights and Financial Services that the last invoice is the FINAL invoice and no further payments will be processedThe PM/CA must change the Agreement Status to “Completed” in [http://sp/sites/eagreements/SitePages/Home.aspx eAgreements] to initiate the retention schedule of the document and to accurately track open/closed contracts. See [[#134.5.1 Invoicing|EPG 134.5.1 Invoicing]] for information on invoicing and the appropriate email addresses to send the FINAL invoices. Contracts include a requirement for a three-year retention of records after the final voucher is submitted in FMIS by Financial Services.
# Being familiar with the qualifications and responsibilities of the consultant’s staff.
 
# Assuring that costs billed are consistent with the acceptability and performance of the consultant’s work.
 
# Monitoring the consultant’s operations, as necessary, and adequately documenting contract performance (prior to final settlement of the contract) for later use.
 
# Conducting interim technical and audit evaluations as deemed necessary during the performance of the consultant contract.
 
# Completing performance evaluations in the Design Consultant Database at major milestones and at the completion of the contract. An evaluation is to be completed at least annually. 
 
# Notifying the Design Division, the Controller’s Office and AI when a project is complete and finalized.  The project manager should make arrangements with the Resident Engineer to be notified when construction is complete.
 
  
====134.3.2.5 Paying Invoices====
+
'''Final Audit.''' MoDOT conducts a final audit to determine total allowable contract costs, unless the contract is on a firm, fixed-price basis. Allowable cost principles are identified based on the experience of MoDOT personnel in administering past contracts and in accordance with applicable requirements of 2 CFR 200.400, Federal Acquisition Regulation (FAR), and [http://www.fhwa.dot.gov/programadmin/23cfr172.cfm 23 CFR 172, Administration of Engineering and Design Related Service Contracts].  
  
The consultant files a [[Media:Invoice for Professional Services.doc|monthly invoice]] and [[Media:Progress Report.doc|progress report]] to the contract administrator. The progress report indicates the time period during which the services were provided, completion date, any authorized delays, and the percentage of the work completed relative to the proposed schedule for various job phases and for the total job.
+
The PM/CA is responsible for notifying Design when the contract is substantially complete. The final audit may be conducted any time after the project is let; the consultant contract need not be completed for the final audit to be conducted.  
  
The contract administrator should make every effort to see that the consultant is paid in a timely manner.  Missouri law states that the consultant is entitled to interest if the invoice is not paid in 45 days.  The 45-day period starts when all questions about the invoice have been addressed and agreed to by both parties.
+
Should MoDOT agree prior to contract execution that it is necessary for a consultant to purchase special equipment, materials, or property to accomplish the required services, MoDOT will establish a before and after value and will receive an appropriate credit for any residual values. This credit is passed on to FHWA.
  
The contract administrator sends a copy of the invoice to the Controller’s Office, Accounts Payable Section with a cover letter stating that the contract administrator has reviewed the invoice and approves it for payment. A copy of the cover letter must also be sent to the Design Division so the amount invoiced can be tracked in the consultant database.
+
===134.5.4 Consultant Performance Appraisals===
 +
The MoDOT PM/CA must perform an [http://netprod3/DesignConsultant/Questionnaire Online Evaluation] of the consultant’s performance under any engineering services contract with MoDOT at each project milestone and at a minimum, on an annual basis during the term of the consultant’s services provided by the contract. Input for the evaluation should be requested from other divisions that may have project experience with the company, such as the Environmental section, or Construction Division. MoDOT’s PM/CA also completes a final comprehensive evaluation of the consultant’s performance within 30 days after contract completion. The evaluation is included in the project file. MoDOT personnel complete another evaluation of the consultant’s performance within 30 days of completion of the construction phase of the project. The evaluation must contain written comments on how the evaluation was determined.  All evaluation comments must be factual and not based upon personal opinion, i.e. all comments must be able to be backed up by actual facts.
  
The letter should state the amount invoiced and also the percentage of the contract complete, the amount to be paid to the consultant to date, the activity code from which the funds should be taken, and that the invoice payment will not exceed the maximum amount payable on the contract. If the contract encompasses more than one job number, the cover letter and all invoices must clearly state how much is to be applied to each job number as well as the total contract.  When the last invoice is submitted for payment, the cover letter should include a statement notifying the Controller’s Office that the contract is complete. The following is a list of information that should be present in some form on the invoice:
+
Upon completing any evaluation, furnish a copy to the consultant prior to meeting with the district or division project manager to discuss the evaluation. These evaluations are included in MoDOT’s Design Consultant Database and are used during consideration of the consultant for future work assignments. The PM/CA is defined as the project manager, or other person who is responsible for reviewing and approving the consultant’s invoices.
# Date of invoice
 
# Invoice number
 
# Name of consultant
 
# Address
 
# MoDOT job number
 
# Company work order or project number
 
# Period covered by the invoice (i.e., January 1–30, 2005)
 
# The not-to-exceed amount for the contract, including supplements
 
# Amount invoiced to date
 
# Total of all charges for the invoice
 
# Employee name/classification
 
# Hours worked on each task during the period (overtime and regular hours must be separated)
 
# Pay rate
 
# Total for each employee/classification (hours worked X pay rate)
 
# Total for all labor
 
# Overhead rate and amount charged for overhead (total labor $ X overhead rate)
 
# Subtotal for labor and overhead
 
# Portion of fixed fee billed
 
# Subtotal for labor, overhead and fixed fee
 
# Direct expenses charged—itemized in detail such as listing all expense accounts paid, copies billed, telephone charges, CADD charges, sub consultants, etc.
 
# Total of direct expenses billed
 
  
If errors are found on the consultant invoice, the contract administrator should contact the consultant and request a corrected invoice. The contract administrator should never change an invoice.  If the consultant makes an error and requests more reimbursement than allowed by the contract, the contract administrator may submit the invoice and authorize payment of an amount less than the invoice requests.  The reasons for paying an amount different than the invoice requests must be clearly documented in the cover letter.  
+
===134.5.5 Restitution for Errors and Omissions===
 +
At times, errors or omissions in the project design or in the information provided for the project may become evident during a project’s bidding or construction phases. When this occurs, the causes surrounding the errors or omissions are investigated to determine a final resolution, which may require financial restitution. A face-to-face meeting between the DE and the consultant will take place to discuss the situation.  
  
Consultant invoices may be submitted electronically to the contract administrator and to the Controller’s Office at:
+
The procedure for investigating errors or omissions is:  
[mailto:Contractual.Payments@modot.mo.gov Contractual.Payments@modot.mo.gov]
 
  
Invoices for projects administered by the Bridge Division should be directed to: [mailto:BRInvoiceAdmin@modot.mo.gov BRInvoiceAdmin@modot.mo.gov] and to the [mailto:Contractual.Payments@modot.mo.gov Controller’s Office.]
+
:1. Contractor/RE initializes a change order with the reason code – CD ([https://epg.modot.mo.gov/files/b/b4/Recovery_of_Cost_Due_to_Consultant_Design_Error.doc Consultant Design Error]). The RE and PM from Construction and Design review the change order and develop recommendation for action and assessment of both direct and indirect costs.  
  
Approval of invoiced amounts may be sent electronically to the Controller’s Office at the link above and copied to Design for tracking at
+
:2. The District Construction and Material Engineer and the District Engineer review and provide comments.  
[mailto:DEInvoiceAdmin@modot.mo.gov DEInvoiceAdmin@modot.mo.gov]
 
  
Electronic payments to a consultant may be set up by submitting an “Electronic Funds Transfer” form.  Information is available at
+
:3. The District Engineer reviews and makes final district recommendations. Form is forwarded to the Construction Division.  
http://www.modot.mo.gov/business/consultant_resources/geninfodesignconsultans.htm
 
  
====134.3.2.6 Supplemental Agreements====
+
:4. The Construction Division Liaison Engineer, the Design Division Liaison Engineer and CCO jointly make the final decision regarding pursuit of reimbursement. The district is informed of the decision.  
A supplemental agreement is used for extra services not anticipated in the original contract or adjustments to contracted services.  Costs associated with these “new” services may be covered by the unit costs included in the original contract or by a newly negotiated cost in the supplemental agreement. When a supplemental agreement to an hourly rate contract is needed, the unit salary costs for the service provided by the supplement must be the same as those salary costs contained in the master agreement.  Direct costs and overhead costs for the services contained in the supplemental agreement should reflect the costs that will be in effect during the performance of the service.
 
  
Once it is determined that the scope of services needs modification, the contract administrator follows the same negotiation process for the supplemental agreement that is followed for new contracts through submission to the PSC.  Any change in the scope of services, whether it results in a change in cost or not, must be included in an approved supplemental agreement.  If a DBE goal was established in the original contract it will continue to apply.  The Scope and Estimate is to be sent to External Civil Rights for a DBE goal evaluation.  The DBE participation should be tabulated in the supplemental agreement (DE1-FASUP).  The agreement must be executed prior to the consultant receiving authorization to proceed with the modified scope of services.  
+
:5. If the decision is to pursue recovery of costs, then CCO drafts a “Letter of Notice” for the District Engineer’s signature.  
  
When a supplemental agreement is necessary, additional funds to cover the added costs in the contract must be identified from the appropriate budget category and be approved as a necessary expenditure. The contract information is submitted to the [http://ghepg01/forms/DE-Engineering%20Professional%20Services/PSC%20Approval%20Letter%20Request%20to%20Execute%20Supplemental%20Contract%20DBE.dot PSC chair for approval].  If approved, the supplemental agreement is then submitted to AI for a pre-audit of hourly billing rates and overheads, to CCO for approval as to form, and to the Commission Secretary for execution. A copy of the supplemental agreement is provided to the Federal Aid Section for obligation of additional federal funds, if applicable.
+
:6. The District Engineer sends the Letter of Notice to the Financial Services Division – Accounts Receivable Section (FS A/R) requesting an invoice be created. A copy is to be sent to the Design Division.  
  
====134.3.2.7 Post-Contract Procedures====
+
:7. Upon receipt of DE’s Letter of Notice to the design consultant, Financial Services Division will create an invoice for the claim and submit it directly to the design consultant with the Letter of Notice. The revenue source code of 1814-05 “Design Consultant Claims” will be used to track reimbursement by design consultants.  
  
=====134.3.2.7.1 Final Audit=====
+
:8. If the consultant does not respond by the “respond by date” in the Letter of Notice, then the Design Liaison Engineer presents the background information to senior management, who decides whether to begin legal proceedings to pursue reimbursement of costs. If legal proceedings are pursued, the Design Liaison Engineer notifies Financial Services Division – Accounts Receivable.
MoDOT conducts a final audit to determine total allowable contract costs, unless the contract is on a firm, fixed-price basis. Allowable cost principles are identified based on the experience of MoDOT personnel in administering past contracts and in accordance with applicable
 
  
requirements of 48 CFR Part 31, Federal Acquisition Regulation (FAR), and 23 CFR 172, Administration of Engineering and Design Related Service Contracts.
+
Should formal dispute resolution as detailed in [[#134.6 Dispute Resolution|EPG 134.6 Dispute Resolution]] be initiated during the above procedure, the following steps will ensure MoDOT receives payment:
  
The contract administrator is responsible for notifying AI when the contract is substantially complete.  The final audit may be conducted any time after the project is let; the consultant contract need not be completed for the final audit to be conducted.
+
:1. The PM/CA, with the help of CCO, prepares and provides the FS Director with a letter from the State Design Engineer to the consultant indicating the Dispute Resolution Committee’s (DRC) decision and the dollar amount of restitution.  
  
Should MoDOT agree prior to contract execution that it is necessary for a consultant to purchase special equipment, materials, or property to accomplish the required services, MoDOT will establish a before and after value and will receive an appropriate credit for any residual values. This credit is passed on to FHWA.
+
:2. The FS Director prepares an invoice for the restitution payment and sends it to the consultant with the letter from the State Design Engineer. A copy of the letter and invoice is provided to the Design Division and the district. These documents indicate the payment is made to Department of Revenue – Credit State Road Fund and mailed to:
  
=====134.3.2.7.2 Performance Evaluation=====
+
:::Missouri Department of Transportation
The MoDOT contract administrator must perform an evaluation (through the Lotus Notes Design Consultant Database) of the consultant’s performance under any EPS’ contract with MoDOT at each project milestone and at a minimum, on an annual basis during the term of the consultant’s services provided by the contract.  Input for the evaluation should be requested from other divisions that may have project experience with the company, such as the Environmental, or Construction Divisions.  MoDOT’s contract administrator also completes a final comprehensive evaluation of the consultant’s performance within 30 days after contract completion.  The evaluation is included in the project file.  MoDOT personnel complete another evaluation of the consultant’s performance within 30 days of completion of the construction phase of the project.
+
:::Financial Services
 +
:::P.O. Box 270
 +
:::Jefferson City, Mo. 65102
  
Upon completing any evaluation, furnish a copy to the consultant prior to meeting with the district or division project manager to discuss the evaluation.  These evaluations are included in MoDOT’s Design Consultant Database and are used during consideration of the consultant for future work assignments.  The contract administrator is defined as the project manager, or other person who is responsible for reviewing and approving the consultant’s invoices.
+
:The FS Director will track the invoice to ensure payment is received from the consultant in a timely manner.
  
=====134.3.2.7.3 Restitution for Errors and Omissions=====
+
===134.5.6 Incentive and Disincentive Program===
At times, errors or omissions in the project design or in the information provided for the project may become evident during a project’s bidding or construction phases.  When this occurs, the causes surrounding the errors or omissions are investigated to determine a final resolution, which may require financial restitution.  A face-to-face meeting between the DE and the consultant will take place to discuss the situation.
 
  
The procedure for investigating errors or omissions is:
+
MoDOT has instituted an incentive and disincentive program with the consulting industry to assure that consultants:
# Contractor/RE initializes a change order with the reason code – CD ([[Media:Recovery of Cost Due to Consultant Design Error.doc|Consultant Design Error]]).  The RE and PM from Construction and Design review the change order and develop recommendation for action and assessment of both direct and indirect costs.
 
# The District Construction and Material Engineer and the DE review and provide comments.
 
# The DE reviews and makes final district recommendations.  Form is forwarded to the Construction Division.
 
# The Construction Division Liaison Engineer, the Design Division Liaison Engineer and CCO jointly make the final decision regarding pursuit of reimbursement.  The district is informed of the decision.
 
# If the decision is to pursue recovery of costs, then CCO drafts a “Letter of Notice” for the DE’s signature.
 
# The DE sends the Letter of Notice to the Controller’s Division – Accounts Receivable Section (CT A/R) requesting an invoice be created.  A copy is to be sent to the Design Division.
 
# Upon receipt of DE’ Letter of Notice to the design consultant, Controller’s Division will create an invoice for the amount of the claim and submit it directly to the design consultant with the Letter of Notice.  The revenue source code of 1814-05 “Design Consultant Claims” will be used to track reimbursement by design consultants.
 
# If the consultant does not respond by the “respond by date” in the Letter of Notice, then the Design Liaison Engineer presents the background information to senior management, who make a decision whether or not to begin legal proceedings to pursue reimbursement of costs.  If legal proceedings are pursued, Design Liaison Engineer notifies Controller’s Division – Accounts Receivable.
 
  
Should formal dispute resolution as detailed in [[#134.3.3 Dispute Resolution|EPG 134.3.3 Dispute Resolution]] be initiated during the above procedure, the following steps will ensure MoDOT receives payment:
+
:1. Deliver the most cost-efficient design that provides the right solution to the identified need (i.e., Practical Design)
# The contract administrator, with the help of CCO, prepares and provides the controller with a letter from the Director of Program Delivery to the consultant indicating the Dispute Resolution Committee’s (DRC) decision and the dollar amount of restitution.
+
:2. Deliver quality plans
# The controller prepares an invoice for the amount of the restitution payment and sends it to the consultant with the letter from the Director of Program Delivery. A copy of the letter and invoice is provided to the Design Division and the district.These documents indicate the payment is made to Department of Revenue – Credit State Road Fund and mailed to:
+
:3. Deliver the roadway and bridge design plans on time as required in the contract
::Missouri Department of Transportation
+
:4. Prepare construction cost estimates that are within an acceptable range of the contract award amount.
::Controller’s Office
+
::P.O. Box 270
+
The incentive and/or disincentives vary according to the listed category. This program will not be used on every MoDOT roadway and bridge design contract. The incentive and disincentives will be used in whole or in part on major projects that are critical to MoDOT accountability with the public. Fifty percent of the fixed fee is the maximum disincentive that can be incurred. When the district requests approval from the PSC chair to solicit consultant services, the approval will specify whether the contract will or will not include the incentive/disincentive program. Project specific incentives and disincentives will be noted in the contract agreement.
::Jefferson City, Mo. 65102
 
The controller will track the invoice to ensure payment is received from the consultant in a timely manner.
 
 
 
=====134.3.2.7.4 Incentive and Disincentive Program=====
 
MoDOT has instituted an incentive and disincentive program with the consulting industry to assure that consultants:
 
  
# Deliver the most cost-efficient design that provides the right solution to the identified need (i.e., Practical Design)
+
'''Cost-effective Design (Practical Design) and Quality Plans.''' The consultant’s performance on delivering the most cost-efficient design that provides the right solution for the identified need will become a part of the consultant performance evaluation. Quality of Plans will be based on the score for overall performance.
# Deliver quality plans
 
# Deliver the roadway and bridge design plans on time as required in the contract
 
# Prepare construction cost estimates that are within an acceptable range of the contract award amount
 
  
The incentive and/or disincentives vary according to the listed category.  This program will not be used on every MoDOT roadway and bridge design contract. The incentive and disincentives will be used in whole or in part on major projects that are critical to MoDOT accountability with the public. Fifty percent of the fixed fee is the maximum disincentive that can be incurred.  When the district requests approval from the PSC chair to solicit consultant services, the approval will specify whether the contract will or will not include the incentive/disincentive program.  Project specific incentives and disincentives will be noted in the contract agreement.
+
Evaluation scores must be considered on all future contract selections. Consultants who perform poorly or who do not deliver cost-effective designs will not be considered for future contracts until they demonstrate to MoDOT that significant changes have been made within their company to address the concerns. The PSC will monitor this performance and MoDOT staff will be kept informed on the status of any firms that are not being allowed to compete for projects.  
  
'''Cost-effective Design (Practical Design) and Quality Plans'''
+
'''Deliver Roadway and Bridge Design Plans on Time. '''
The consultant’s performance on delivering the most cost-efficient design that provides the right solution for the identified need will become a part of the consultant performance evaluation.  Quality of Plans will be based on the score for overall performance. 
 
  
Evaluation scores must be considered on all future contract selections.  Consultants who perform poorly or who do not deliver cost-effective designs will not be considered for future contracts until they demonstrate to MoDOT that significant changes have been made within their company to address the concerns.  The PSC will monitor this performance and MoDOT staff will be kept informed on the status of any firms that are not being allowed to compete for projects.
+
:'''Right of Way Plans.''' The project manager should use the flowchart below to determine whether the incentives or disincentive are applicable based on the scheduled delivery date contained in the current contract or supplemental agreement. If changes are made by MoDOT that impact scheduling, the letting date may be re-negotiated .
 
'''Deliver Roadway and Bridge Design Plans on Time'''
 
* '''Right of Way Plans.''' The project manager should use the flowchart below to determine whether the incentives or disincentive are applicable based on the scheduled delivery date contained in the current contract or supplemental agreement. If changes are made by MoDOT that impact scheduling, the letting date will be re-negotiated
 
 
   
 
   
 
[[Image:Design Plan Delivery Flow Chart.png|center|600px]]
 
[[Image:Design Plan Delivery Flow Chart.png|center|600px]]
 +
 +
 +
:'''Final Plans, Surveys, and Estimates.''' The project manager should use the flowchart below to determine whether the incentive or disincentive is applicable based on the scheduled delivery date contained in the current contract or supplemental agreement. If changes are made by MoDOT that impact scheduling, the letting date will be re-negotiated.
 
   
 
   
* '''Final Plans, Surveys, and Estimates.'''  The project manager should use the flowchart below to determine whether the incentive or disincentive is applicable based on the scheduled delivery date contained in the current contract or supplemental agreement.  If changes are made by MoDOT that impact scheduling, the letting date will be re-negotiated.
+
[[Image:PS&E Delivery Flow Chart.png|center|600px]]
 +
 
  
[[Image:PS&E Delivery Flow Chart.png|center|600px]]
+
:'''Accurate Cost Estimates''' are critical for MoDOT to be able to deliver the program promised to the public. Program estimates are published in the STIP and each district programs sufficient projects each year to spend every dollar allocated. Poor estimating causes MoDOT numerous problems at letting. Once the project budget has been set it is then the design consultant’s responsibility to design a good project that satisfies the purpose and need within that budget. The project manager should use the flowchart below to determine whether the consultant qualifies for an incentive or disincentive based on their project estimates.  
 
   
 
   
* '''Accurate Cost Estimates'''
 
Accurate estimates are critical for MoDOT to be able to deliver the program promised to the public.  Program estimates are published in the STIP and each district programs sufficient projects each year to spend every dollar allocated.  Poor estimating causes MoDOT numerous problems at letting.  Once the project budget has been set it is then the design consultant’s responsibility to design a good project that satisfies the purpose and need within that budget.  The project manager should use the flowchart below to determine whether the consultant qualifies for an incentive or disincentive based on their project estimates.
 
 
 
[[Image:Incentive Disincentive Decision Flow Chart.png|center|600px]]
 
[[Image:Incentive Disincentive Decision Flow Chart.png|center|600px]]
  
===134.3.3 Dispute Resolution===
 
  
[[Image:Dispute Resolution Flow Chart.png|center|600px]]
+
==134.6 Dispute Resolution==
 +
 +
[[Image:134.3.3.jpg|center|750px]]
  
====134.3.3.1 Introduction====
+
Once a consultant is selected to work for MoDOT, circumstances may arise that lead to a dispute between MoDOT’s PM/CA and the consultant. In most cases, a complete understanding and recognition of each party’s concerns will result in successful resolution of the disagreement. However, when that is not the case, this [[#Dispute Resolution Process (DRP)|dispute resolution procedure]] is used.  
Once a consultant is selected to work for MoDOT, circumstances may arise that lead to a dispute between MoDOT’s contract administrator and the consultant. In most cases, a complete understanding and recognition of each party’s concerns will result in successful resolution of the disagreement. However, when that is not the case, this [[#Dispute Resolution Process (DRP)|dispute resolution procedure]] is used.  
 
  
The relationship between the consultant and MoDOT is a professional contractual relationship. All parties to the contract should understand the dispute resolution process. The contract administrator and the consultant should make every attempt to fully understand the dispute and express honest statements of fact prior to initiating formal dispute resolution. In this context, the contract administrator is defined as the person who authorizes MoDOT’s payment of the consultant invoices.
+
The relationship between the consultant and MoDOT is a professional contractual relationship. All parties to the contract should understand the dispute resolution process. The PM/CA and the consultant should make every attempt to fully understand the dispute and express honest statements of fact prior to initiating formal dispute resolution. In this context, the PM/CA is defined as the person who authorizes MoDOT’s payment of the consultant invoices.  
  
 
Before initiating formal dispute resolution, the following activities should occur:  
 
Before initiating formal dispute resolution, the following activities should occur:  
# The district engineer, or division engineer (hereinafter indicated by “DE”) prepares a letter to the consultant outlining the contested issues.
 
# The disputing parties (project manager level for both MoDOT and consultant) participate in a face-to-fact meeting.
 
# The consulting firm conveys the firm’s recommendations for resolving the dispute.
 
# MoDOT’s representative discusses the consultant’s proposed resolution and responds in a letter, either accepting the proposal or offering a rebuttal.
 
# MoDOT and the consultant attempt to negotiate a settlement.
 
  
If the contract administrator and the consultant reach an agreement that provides the consultant with payment greater, or less than the contract maximum, the contract administrator needs to initiate a supplemental agreement and follow normal procedures to get the supplemental agreement executed, including approval by the PSC. If no settlement is forthcoming, formal dispute resolution is initiated.
+
:1. The district engineer, or division engineer (hereinafter indicated by “DE”) prepares a letter to the consultant outlining the contested issues.  
 +
 
 +
:2. The disputing parties (project manager level for both MoDOT and consultant) participate in a face-to-face meeting.  
  
====134.3.3.2 Initiating Formal Dispute Resolution====
+
:3. The consulting firm conveys the firm’s recommendations for resolving the dispute.  
When attempts between the contract administrator and the consultant have failed to resolve the disagreement, the consultant should enumerate the firm’s concerns in a letter to the DE, thereby initiating formal dispute resolution.  A Dispute Resolution File should be started by the contract administrator.
 
  
Disagreements may arise over the scope of services, fees, hours, the consultant evaluation, errors and omissions, or other issues. Initiation of the resolution process will in no way be reflected on negatively in the consultant’s performance evaluation.  The consultant’s letter to the district engineer should specifically outline the disagreement and the consultant’s view of the issues. This detailed letter must include:
+
:4. MoDOT’s representative discusses the consultant’s proposed resolution and responds in a letter, either accepting the proposal or offering a rebuttal.  
# A clear description of the items that are being disputed
 
# What the consultant desires to resolve the dispute
 
# Background—the sequence of events that led to the dispute
 
# Documentation to support the request
 
# All correspondence between the parties relating to the items in dispute (including    e-mail)
 
# A listing of previous attempts to resolve the issue (including e-mail)
 
# A copy of the contract and any supplemental agreements
 
  
Upon receiving the consultant’s letter and documentation, the DE will have the contract administrator prepare a similar letter, also addressed to the DE, outlining the administrator’s view of the disagreement with particular attention to the information in the consultant’s letter. MoDOT may also initiate formal dispute resolution by the contract administrator sending a letter, under the DE’s signature, to the consultant contact listed in the contract.  The consultant should be directed to respond to the department’s letter.  As a courtesy, the contract administrator should notify the consultant project manager before writing this letter.  
+
:5. MoDOT and the consultant attempt to negotiate a settlement.  
  
====134.3.3.3 Dispute Review by District or Division Engineer====
+
If the PM/CA and the consultant reach an agreement that provides the consultant with payment greater, or less than the contract maximum, the PM/CA needs to initiate a supplemental agreement and follow normal procedures to get the supplemental agreement executed, including approval by the PSC. If no settlement is forthcoming, formal dispute resolution is initiated.  
The contract administrator transmits the letter documenting the issues of the dispute, with the consultant’s letter attached, to MoDOT’s DE for review.  In addition, the DE also notifies the Director of Program Delivery, who chairs the PSC, that formal dispute resolution has been initiated. With this notice, the State Design Engineer begins tracking the dispute resolution process.  Whenever the two parties in the dispute reach a resolution, the State Design Engineer should be notified of the following:
 
# Where in the process resolution was reached
 
# The date resolution was reached
 
# What resolution was reached
 
  
The DE evaluates the information in the letters, discussing it with the contract administrator and the consultant project manager as necessary.
+
===134.6.1 Initiating Formal Dispute Resolution===
 +
When attempts between the PM/CA and the consultant have failed to resolve the disagreement, the consultant should enumerate the firm’s concerns in a letter to the DE, thereby initiating formal dispute resolution. A Dispute Resolution File should be started by the PM/CA.  
  
====134.3.3.4 Meeting of the Two Parties====
+
Disagreements may arise over the scope of services, fees, hours, the consultant evaluation, errors and omissions, or other issues. Initiation of the resolution process will in no way be reflected on negatively in the consultant’s performance evaluation. The consultant’s letter to the DE should specifically outline the disagreement and the consultant’s view of the issues. This detailed letter must include:
The DE arranges a meeting with the consultant principal. If an agreement is reached after discussion between the district engineer and the consultant principal, the DE provides a letter to the firm indicating the terms of the agreement.  However if agreement is still not reached, the dispute may be taken to the Dispute Resolution Committee.
 
  
====134.3.3.5 Dispute Resolution Committe====
+
:1. A clear description of the items that are being disputed
The Dispute Resolution Committee (DRC) is comprised of the Director of Program Delivery (acting as chair), Director of System Management, and Chief Financial Officer. In preparation for the DRC’s meeting, the district engineer will share written details of the formal dispute resolution’s outcome to this point with the committee members. The committee will review this information together with other background information, including the original letters from the contract administrator and the consultant project manager outlining the dispute. When the committee meets, all representatives of the disputing parties are given the opportunity to attend.  The DRC discusses the issues with the disputing parties and tries to reach a resolution satisfactory to both parties. If a resolution cannot be reached, an offer of mediation is made to the two parties.  Should both parties agree to use mediation to settle the claim, they will share the cost of mediation equally.
+
:2. What the consultant desires to resolve the dispute
 +
:3. Background—the sequence of events that led to the dispute  
 +
:4. Documentation to support the request
 +
:5. All correspondence between the parties relating to the items in dispute (including e-mail)
 +
:6. A listing of previous attempts to resolve the issue (including e-mail)
 +
:7. A copy of the contract and any supplemental agreements
  
If an agreement is reached, the district engineer sends the consultant a letter outlining the resolution of the dispute.  
+
Upon receiving the consultant’s letter and documentation, the DE will have the PM/CA prepare a similar letter, also addressed to the DE, outlining the administrator’s view of the disagreement with particular attention to the information in the consultant’s letter. MoDOT may also initiate formal dispute resolution by the PM/CA sending a letter, under the DE’s signature, to the consultant contact listed in the contract. The consultant should be directed to respond to the department’s letter. As a courtesy, the PM/CA should notify the consultant project manager before writing this letter.  
  
====134.3.3.6 Mediation====
+
===134.6.2 Dispute Review by District or Division Engineer===
All future MoDOT consultant contracts will contain language describing the dispute resolution process and the role of the mediator. A mediator is an outside party who facilitates a discussion between the disputing parties and enables them to explore options to reach agreement.  Responsibility for dispute resolution is solely that of MoDOT and the consultant.  The mediator has knowledge of the process and the general terms of the dispute but is not intimately knowledgeable of all project details. 
+
The PM/CA transmits the letter documenting the issues of the dispute, with the consultant’s letter attached, to MoDOT’s DE for review. In addition, the DE also notifies the Assistant Chief Engineer and the State Design Engineer that formal dispute resolution has been initiated. With this notice, the State Design Engineer begins tracking the dispute resolution process. Whenever the two parties in the dispute reach a resolution, the State Design Engineer should be notified of the following:
  
After the consultant has accepted MoDOT’s offer for mediation, the State Design Engineer is responsible for making arrangements for a mediator.  This includes selecting an approved mediator from a list (developed jointly by ACEC and MoDOT) and arranging the time and place of the meeting. Participants at the meeting are limited to the DE, the DRC’s chair, the consultant principal, and the mediator.  Others, including the contract administrator and the consultant project manager, are not active participants in this meeting but may provide information if the mediator so requests. Legal representation is optional.  The disputing parties share the cost of mediation equally.
+
:1. Where in the process resolution was reached
 +
:2. The date resolution was reached
 +
:3. What resolution was reached
  
Should the mediation result in the dispute’s resolution, the DE sends the consultant a letter explaining the resolution of the dispute.  However, should the mediation not result in resolution of the dispute, the issue is returned to the Dispute Resolution Committee for further action.
+
The DE evaluates the information in the letters, discussing it with the PM/CA and the consultant project manager as necessary.  
  
====134.3.3.7 Final Decision by the DRC====
+
===134.6.3 Meeting of the Two Parties===
When mediation fails, the State Design Engineer will notify the DRC and provide any additional information gathered during the mediation process.  The DRC will meet and, following discussion, reach a decision by a simple majority (e.g., two votes in favor of resolution).  Upon decision by the DRC, the chair provides a letter to the district engineer or division engineer and the consultant principal informing them of the decision. Upon receiving this information, the contract administrator informs the State Design Engineer that the dispute resolution process has been completed and provides the information listed under [[#134.3.3.3 Dispute Review by District or Division Engineer|EPG 134.3.3.3 Dispute Review by District or Division Engineer]].  When the consultant receives the letter from the chair of the Dispute Resolution Committee, the firm may respond; however, formal dispute resolution will have been completed and MoDOT will not entertain further appeals from the consultant.
+
The DE arranges a meeting with the consultant principal. If an agreement is reached after discussion between the DE and the consultant principal, the DE provides a letter to the firm indicating the terms of the agreement. However if agreement is still not reached, the dispute may be taken to the Dispute Resolution Committee.  
<div id="Dispute Resolution Process (DRP)"></div>
 
<center>'''Dispute Resolution Process (DRP)'''</center>
 
  
[[Image:Dispute Resolution Process Flow Chart.png|center|800px]]
+
===134.6.4 Dispute Resolution Committee===
 +
The Dispute Resolution Committee (DRC) is comprised of the Assistant Chief Engineer (acting as chair), Director of External Civil Rights, and Chief Financial Officer. In preparation for the DRC’s meeting, the DE will share written details of the formal dispute resolution’s outcome to this point with the State Design Engineer who then facilitates the DRC procedures. The committee will review this information together with other background information, including the original letters from the PM/CA and the consultant project manager outlining the dispute. When the committee meets, all representatives of the disputing parties are given the opportunity to attend. The DRC discusses the issues with the disputing parties and tries to reach a resolution satisfactory to both parties. If a resolution cannot be reached, an offer of mediation is made to the two parties. Should both parties agree to use mediation to settle the claim, they will share the cost of mediation equally.  
  
===134.3.4 Sample Information for Solicitation===
+
If an agreement is reached, the DRC sends the consultant a letter outlining the resolution of the dispute.  
  
'''District 4'''
+
===134.6.5 Mediation===
{|border="1" align="center" cellpadding="2"
+
A mediator is an outside party who facilitates a discussion between the disputing parties and enables them to explore options to reach agreement. Responsibility for dispute resolution is solely that of MoDOT and the consultant. The mediator has knowledge of the process and the general terms of the dispute but is not intimately knowledgeable of all project details.  
|-style="background:#5F9EA0"
 
|colspan="2" style="text-align:center"|'''Jackson County, Route I-470'''
 
|-style="background:#cccccc"
 
|'''Job No:'''||J4I1641
 
|-style="background:#cccccc"
 
|'''Location:'''||I-470/Route 50 interchange in Lee’s Summit
 
|-style="background:#cccccc"
 
|'''Proposed Improvement:'''||Add half-diamond interchanges on I-470 at Pryor Road and Blue Parkway with connector roadways over Route 50. Includes grading, drainage, paving, bridges and retaining walls.
 
|-style="background:#cccccc"
 
|'''Length:'''||3.75 miles
 
|-style="background:#cccccc"
 
|'''Approximate Construction Cost:'''||$33 Million
 
|-style="background:#cccccc"
 
|'''Consultant Services Required:'''||Preliminary design (roadway and bridge), right of way plans, and final design plans* for the proposed improvement, and preliminary design (roadway and bridge) and right of way plans for ultimate (future) modifications to the existing cloverleaf interchange at I-470/Route 50.
 
|-style="background:#cccccc"
 
|'''DBE Goal (if applicable)'''||.
 
|-style="background:#cccccc"
 
|valign="top"|'''Other Comments:'''||The consultant will prepare preliminary roadway plans and preliminary bridge design for the proposed improvements, (5 bridges and several retaining walls) plus preliminary roadway plans, right of way plans, and bridge memoranda for ultimate (future) modifications to the existing I-470/Route 50 cloverleaf interchange. The ultimate modifications will replace two of the existing loop ramps with directional ramps, add lanes and collector-distributor roadways on I-470, add lanes on Route 50, and modify existing diamond interchanges at Route 350/Colbern Road, and Route 50/Chipman Road. (6 bridges and possible retaining walls) Microstation and GeoPak electronic files for these 20% plans will be provided.  An access justification report has been approved by FHWA for modifying access to the interstate system and the project has been environmentally classified as a categorical exclusion.*Final Plans may be added as a Supplemental Agreement
 
|}
 
  
===134.3.5 Criteria for Evaluating Consultants===
+
After the consultant has accepted MoDOT’s offer for mediation, the State Design Engineer is responsible for making arrangements for a mediator. This includes selecting an approved mediator from a list (developed jointly by ACEC and MoDOT) and arranging the time and place of the meeting. Participants at the meeting are limited to the DE, the DRC’s chair, the consultant principal, and the mediator. Others, including the PM/CA and the consultant project manager, are not active participants in this meeting but may provide information if the mediator so requests. Legal representation is optional. The disputing parties are responsible for their own costs associated with the mediation but will share all expenses associated with the mediator equally.
  
# '''Practical Design (25 points)''' - Rate the consulting firm for past performance using Practical Design in the work it has performed.  The maximum value of 25 points is for successful and ambitious efforts on previous projects. A value of 25 points may be assigned for above-average experience, while 15 points may be given for experience adequate to perform the contract.  A firm with no previous experience in Practical Design may be given a reduced value based on perceived potential.
+
Should the mediation result in the dispute’s resolution, the DRC sends the consultant a letter explaining the resolution of the dispute. However, should the mediation not result in resolution of the dispute, the issue is forwarded to MoDOT's Chief Engineer for final action.  
# '''Overall Past Performance (20 points)''' - Rate the adequacy of firms that have previously performed work under contract with MoDOT or other agencies in related fields, assigning a maximum of 20 points.  Refer to the evaluations in the Design Consultant Database. (20=excellent, 15=adequate, 10=fair, 0=inadequate).
 
# '''Qualifications of Personnel (25 points)''' - Rate the qualifications of employees designated to this specific job, assigning a maximum of 25 points for the most qualified personnel.  Those rated 15 points are considered good but lack extensive experience in the particular type of service desired.  A value of 10 points is assigned to firms with well-qualified personnel who have no experience in the proposed area of work.  Reduce the rating for a level of personnel inadequate to handle the firm’s indicated workload.
 
# '''Familiarity and Capability (15 points)''' - Evaluate the firm’s familiarity and ability to comply with the monitoring procedures and contract requirements, using a maximum of 15 points for a consultant that previously performed satisfactory work for MoDOT.  Firms that have performed similar type work only for other governmental agencies are assigned a maximum of 10 points.
 
# '''General Experience of Firm (10 points)''' - Evaluate the consulting firm for experience on similar and related types of work it has performed.  The maximum value of 10 points is for many years of established practice in the proposed type of work and related studies.  A value of 7 points may be assigned for above-average experience, while 5 points may be given for experience adequate to perform the contract.  The points for a firm with little operating experience in the selected field may be reduced further.
 
# '''Accessibility (5 points)''' - Priority is given to firms with a previously established record of responsiveness to their clients’ needs and a familiarity with the area in which the project is located.  A value of 5 points should be allocated to such firms, with lesser values given to firms not satisfying these requirements.  
 
  
Note – Except for Practical Design, the point values shown on this page are recommended values only and may be adjusted according to project specific priorities.
+
===134.6.6 Final Decision by the DRC===
 +
When mediation fails, the State Design Engineer will notify the DRC and MoDOT’s Chief Engineer and provide any additional information gathered during the mediation process. The Chief Engineer will review the information provided and if desired, meet with the members of the DRC to discuss the results of the dispute resolution process up to that point. Upon decision by the Chief Engineer, the State Design Engineer provides a letter to the DE and the consultant principal informing them of the decision. When the consultant receives the letter from the State Design Engineer outlining the decision of the Chief Engineer, the firm may respond; however, formal dispute resolution will have been completed and MoDOT will not entertain further appeals from the consultant.  
  
===134.3.6 Consultant Selection and Contract Administration Summary===
+
<div id="Dispute Resolution Process (DRP)"></div>
  
(For additional information see [http://epg.modot.mo.gov/forms/DE-Engineering%20Professional%20Services/Attachment17ConsultantSelectionAndContractAdministrationSummary.dot Consultant Selection and Contract Administration Summary] or [http://epg.modot.mo.gov/forms/DE-Engineering%20Professional%20Services/Attachment18ConsultantSelectionAndContractAdministrationSummary-Bridge.dot Consultant Selection and Contract Administration Summary - Bridge])
 
  
# District Design Engineer (DDE) realizes a need to contract for professional services with a consultant.
+
[[Image:134.3.3.7.jpg|center|650px]]
# DDE informs the Project Manager (PM), who develops a general description of work needed.
+
<font color = "white">ko</font color = "white">
# The PM and DDE discuss the need with the Assistant District Engineer and District Engineer (DE).  The DE agrees with the need to hire a consultant.
+
<center>'''Dispute Resolution Process (DRP)'''</center>
# The PM works with the core team to develop a more detailed scope of work.
+
<font color = "white">ko</font color = "white">
# The PM develops an estimate of man-hours and cost for the proposed consultant services.
 
# The PM determines the type of contract needed based upon the cost estimate.
 
#* For an estimated cost of less than $100,000, can use an hourly rate contract if scope of services fits the established Work Categories.
 
#* When the estimated cost is close to $100,000 or there is a high possibility of changes to the scope of services, use standard contract.
 
#* For estimated cost of more than $100,000 use standard contract ([http://wwwi/intranet/cc/contracts/DE/DE01-SF%20%20Design%20Consultant%20Agreement%20(State%20Funded).doc DE01-SF]).
 
#* If the estimated cost exceeds $1,000,000 or the services are for ITS or a major bridge, the PM should contact the External Civil Rights Administrator for an estimated DBE goal.  Federal funds may be used to pay for the professional services. 
 
# If an hourly rate contract is used, the following steps apply (if not, skip to number 8):
 
#* Check with Central Office Design to see if funds are available under the project number so that the $100,000 cumulative limit is not exceeded.
 
#* Go to the list of approved consultants on the public web page and select one who is approved for the type of service needed in the district or division.  Try to distribute work equally among the consultants on the approved list.
 
#* Contact the consultant and inform them of their selection to provide the service.
 
#* Submit a scope of services to the consultant for their review and comments.
 
#* When agreement has been reached on a scope of services, the consultant should develop an estimate of man-hours and cost for the required services.
 
#* The PM reviews the cost estimate for the following points:
 
#*# The “Not to Exceed” amount of the contract proposed by the consultant is under $100,000 and acceptable based upon the man-hour and cost estimate developed by the PM.
 
#*# The hourly billing rates used match those in the master agreement.  Attach a copy of the current rates from the master agreement.
 
#*# The cost estimate for mileage does not exceed the IRS allowable reimbursement rate.
 
#*# The travel expenses (per diem) are equal to or below the allowable rate found at the federal website www.gsa.gov
 
#*# The only estimated costs are labor and travel expenses.  No other direct costs are allowed except a few exceptions that will be listed in the master agreement.
 
#* Prepare the MOU ([http://wwwi/intranet/cc/contracts/DE/DE01-MOU%20%20Memorandum%20of%20Understanding.doc DE01-MOU]) for execution by the consultant and the DE.
 
# If a standard contract is used, the following steps apply:
 
#* The PM prepares a PSC approval letter requesting approval to solicit consultants.
 
#* The PM gives the letter to the DE for his review, signature, and mailing to the chair of the PSC.
 
#* After receiving approval, the PM develops information for a consultant solicitation and submits it to the State Design Engineer.
 
#* A copy of the consultant solicitation and the date by which the consultants must respond will be posted to the web and an email will be sent to all who are on the notification list.
 
#* Form a selection team consisting of at least three people, including the PM and a Central Office Design Liaison Engineer.  If the contract includes a feasibility study, planning study, major investment study, EA or EIS preparation, a public involvement sub consultant or other specialty services, see the guidelines for additional team membership requirements.
 
#* The selection team should review and rate the responses to the solicitation and create a “short list” of 3 to 6 consultants to consider further.
 
#* Selection can be made two ways: 
 
#*# For the majority of the projects, the team meets and using more detailed selection criteria and review of evaluations from the Design Consultant Database, reaches consensus on the one chosen firm.
 
#*# For certain types of projects, an interview or presentation selection process should be used.
 
#*#* For presentations only, PM gets the PSC approval of the short list
 
#*#* Conducts the interview or presentations with short listed firms
 
#*#* The team scores and ranks each consultant, ultimately reaching consensus on the selection.
 
#* For presentations only, the PM requests the PSC chair approval on the selection.
 
#* The PM notifies selected consultant of the team’s decision.  Final decisions are posted on the General Information for Consultants website.
 
#* The PM prepares a draft contract and scope of services and a pre-negotiation estimate of man-hours and costs.  The PM should contact the following divisions for input on the scope of services, if needed:
 
#*# Bridge Division
 
#*# Design Division
 
#*# Traffic Division
 
#*# Geotechnical
 
#*# Environmental
 
#*# Historic Preservation
 
#* PM sends this scope to the External Civil Rights Administrator for final DBE percentage when federal funds are being used.
 
#* The PM sends the contract and scope of services to the consultant.  The consultant will develop a cost estimate based upon man-hours and the scope of services.
 
#* The consultant and the PM negotiate the scope and number of man-hours needed to perform the professional services.  Liaison engineers should be involved in the review.
 
#* A draft copy of the contract is sent to Central Office Design for Audit review of overhead, labor rates and acceptable direct charges. 
 
#* Any changes in the boilerplate contract language also require review and approval by CCO.
 
#* The consultant executes 4 copies of the contract and returns it to the PM.
 
#* The PM sends all four copies of the contract to the State Design Engineer where the contract is reviewed and executed.
 
#*# Original contracts are sent to CCO for review and approval as to form.
 
#*#Original contracts are sent to commission secretary for execution by the chair of the PSC.
 
#* Two executed copies of the contract will be returned to the PM, who will send one of the copies to the consultant.
 
#*# CO sends a copy to Audits and Investigation for their files.
 
#*# CO sends a copy to Controllers Office for processing invoices.
 
#*# A copy is filed in Design.
 
#*# A copy is sent to Resource Management to be forwarded to FHWA for approval if federal funds are being used.
 
# Project manager should request copies of “Certificate of Insurance” and any necessary Payment Bonds from the consultant and keep in project file.
 
# Ongoing contract administration
 
#* Review monthly invoices and progress reports for accuracy and submit invoices for payment.  These may be submitted electronically.
 
#* If required, negotiate and execute supplemental agreements using the same approval process that is used for an original contract, including DBE evaluation if needed. 
 
# Conduct performance evaluations at milestones, or at least annually and at project completion.[[image:Engineering Professional Services.jpg|right|425px]]
 
# If design errors are discovered during the construction phase of the project, the consultant will be responsible for any damages incurred.  See [[#134.3.2.7.3 Restitution for Errors and Omissions|EPG 134.3.2.7.3 Restitution for Errors and Omissions]] for details on process to be used.
 
# As part of completing the consultant evaluation, the project manager should make sure a post-construction review of the consultants services are preformed.  Make sure that everyone involved with the project is given a chance to provide input into the rating the consultant will receive.  Arrangements should be made for the RE to notify the project manager when construction is complete.
 
# Notify the design division when the consultant has completed the work specified in the scope of services.  If the contract specifies services after the letting, the design division should be notified when the project is let.  The auditors can audit the contract with out waiting for the contract to be completed.
 

Latest revision as of 13:28, 26 March 2024

EPSG pic.jpg
Helpful Links for Engineering Policy
Bridge Special Provisions
Bridge Standard Drawings
OpenRoads Designer and Microstation Drawing Standards
Project Cost Estimation
EPG 321 Geotechnical Engineering
MoDOT GPS Reference Station Network
Engineering Consultant Services Brochure


Contents

134.1 Introduction

In order to deliver projects, there may be occasions when additional engineering professional services and expertise are needed for a variety of reasons. EPG 134 Engineering Professional Services is a guide for soliciting, selecting and managing consultant contracts. Professional services are defined under the federal law, The Brooks Act, 40 USC 1102. Most consulting services used by MoDOT are included in the federal description of professional services, therefore MoDOT must follow the federal guidelines outlined in the Brooks Act for soliciting and selecting a consultant. All documentation related to the professional services procurement must be stored in eProjects under the “DE Consultant Document” content type.

134.1.1 Federal Law

The Brooks Act, 40 USC 1101 – 1104, 23 CFR 172.3 (Public Law 92-582, 1972) and regulation found in 23CFR172.5 requires agencies to “promote open competition by advertising, ranking, selecting and negotiating contracts based on demonstrated competence and qualifications for the type of engineering and design services being procured, and at a fair and reasonable price.” This requirement applies to all Federal-aid Highway Program projects where engineering or design-related services are procured to develop a construction project. This is commonly referred to as Qualifications Based Selection or QBS, meaning a firm is chosen based on qualifications and not price.

134.1.2 State Law

Commonly referred to as the “Mini-Brooks Act”, the State of Missouri, in sections 8.285 thru 8.291 RsMO, requires Qualification Based Selection (QBS) for all architectural, engineering and land surveying professional services and reflects the language contained in the federal legislation. This requirement applies to ALL projects in Missouri regardless if it contains federal funds or not. However, federal laws supersede state laws if federal funds are used on a project.

134.1.3 Consultant Qualification

Forms and Figures
Fig. 134.2.2 Processing Standard Consultant Contracts Checklist
Fig. 134.2.2.2, Solicitation and Request Letter
Fig. 134.2.2.5.1, Consultant Rating Form
Fig. 134.2.2.5.2, Consultant Selection Rating Summary
Fig. 134.2.2.5.3, Consultant Selection Approval Letter
Fig. 134.2.2.5.4, District/Division Approval of Short List
Fig. 134.2.2.5.5, Sample Criteria and Point Values for Rating Presentations/Interviews
Fig. 134.2.2.5.6, Invitation to Present
Fig. 134.2.2.5.7, Sample Letter to Interview
Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist
Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts
Fig. 134.3.2, MoDOT Allowable Profit Curve
Fig. 134.3.6.1.1, Common Unallowable Costs
Fig. 134.3.6.1.2, Overhead Schedule Example
Fig. 134.4.1, PSC Approval to Execute Contract
Fig. 134.4.2, Notice to Proceed (NTP) Letter
Fig. 134.5.1.1, Blank Consultant Invoice
Fig. 134.5.1.2, MoDOT Consultant Invoice Checklist
Fig. 134.5.1.3, Blank Consultant Invoice - Hourly Rate Contracts (only)
Fig. 134.5.1.4, MoDOT Consultant Invoice Checklist - Hourly Rate Contracts (only)
Fig. 134.5.1.5, Example Invoice
Fig. 134.5.2, PSC Approval to Execute Supplemental Agreement
Additional Information
EPG 237.14.4 Specifications of Electronic Design Data for Consultants and MoDOT

All prime consultants must be prequalified to perform engineering services on any project. To become prequalified, consultant firms must submit the following:

1. Statement of Qualifications (SOQ)
2. Registered to conduct business in the State of Missouri (Certificate of Good Standing) and hold a Certificate of Authority with the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects. (Note: A Certificate of Authority is not required for sole proprietorships or partnerships. It is only required if the firm is incorporated or registered as a limited liability company. For sole proprietorships and/or partnerships, individual professional license certificates must be submitted in lieu of the Certificate of Authority. In addition, the Certificate of Authority is not required for firms that do work outside the jurisdiction of the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects.)
3. Current E-Verify MOU and E-Verify Affidavit
  • E-Verify MOU – one-time submittal
  • E-Verify Affidavit - yearly
4. Current Annual Financial Prequalification with MoDOT
5. MoDOT Bridge Consultants Only (Not required for LPA Consultants)): All bridge plans for MoDOT projects must be signed and sealed by a professional engineer from a prequalified firm for bridge design (with the firm’s logo shown in the title block of the bridge plans). For consultants who wish to become prequalified to perform bridge design, the consultant must submit a Bridge Experience Profile and a Personal Bridge Experience Record. These forms can be found on MoDOT's Consultant Resources webpage and must be updated every 3 years. In addition, the consultant must have a QA/QC plan on file with MoDOT which must be updated every 3 years. The prime consultant is not required to be prequalified for bridge design unless the scope of work performed by their firm includes bridge design. For more information, please contact MoDOT's Bridge Division.

The prequalification process complies with AASHTO guidelines published in the Uniform Audit & Accounting Guide, 2012 Edition. This prequalification process ensures projects are in compliance with state and federal regulations.

The prequalification is only required for prime consultants. Subconsultants are strongly encouraged to become prequalified in order to reduce repetitive paperwork for future projects. For more information on subconsultant requirements see EPG 134.3.5 Subconsultants.

For prequalification requirements for LPA consultants, see EPG 136.4.1.5 Consultant Qualification.

Non-Profit and Governmental Indirect Cost Rate Requirements

In order to claim indirect costs for grant reimbursement, each such sub-recipient is required to annually submit a signed cost allocation plan for review and acceptance by MoDOT. The rate must be audited by an independent certified public accountant (CPA) firm with experience in preparing cost allocation plans for non-profit or governmental organizations in accordance with 2 Code of Federal Regulations (CFR) 200.

Compliance with 2 CFR 200 requires MoDOT to review the following documents:

1. Cost allocation plan
2. Organization chart
3. Employee time sheet sample showing allocation of direct and indirect labor hours
4. Audited schedules of indirect costs and fringe benefits
5. Audited, reviewed or compiled financial statements
6. Certification of indirect costs
7. Listing of grants/contracts with MoDOT

134.1.4 Conflict of Interest

A conflict of interest occurs when a consultant has a financial or personal interest in a project.

MoDOT evaluates the following on a case-by-case basis

1. Whether or not a conflict of interest exists
2. Whether or not the conflict of interest can be avoided or neutralized
3. The appropriate steps to avoid or neutralize conflict of interest in evaluating the above, MoDOT uses the following in making such determinations.
  • Section 105.452 RSMo 2000 and Section 105.454 RSMo. 2005 are general conflict of interest statutes applicable to all state officials and employees including MHTC members and MoDOT employees. These statutes prohibit actual conflicts of interest including, but not limited to:
  • favorably acting or refraining from acting on any matter or using decision making authority to obtain financial gain (§105.452(1), (4) and (5) RSMo. 2000);
  • disclosing and/or using confidential information obtained in his/her official capacity in any matter with the intent to result in financial gain (§105.452(2) and (3) RSMo. 2000);
  • performing any service for an agency in which he/she is an officer or employee or has supervisory authority for payment in excess of $500 per transaction or [$1500] $5000 per year without competitive bidding (§105.454(1), (3) RSMo. 2005); and
  • selling or leasing any property to an agency in which he/she is an officer or employee or has supervisory authority over for payment in excess of $500 per transaction or [$1500] $5000 per year without competitive bidding (§105.454(2), (3) RSMo. 2005). However, this provision does not apply to property that is condemned by the agency from its officer or employee (§105.466.3 RSMo. 2005).

The Federal Highway Administration (FHWA) addresses Conflicts of Interest in relation to federally funded highway projects in general at 23 CFR §1.33. MoDOT adopts these rules for use on all federally funded contracts.

134.1.5 Suspension/Debarment

All consultants receiving individual awards and all subrecipients/subconsultants must certify that the organization and its principles are not suspended or debarred. MoDOT’s Professional Services Coordinator will check SAM.gov / Exclusions to identify any consultants who have become suspended or debarred and will remove said consultant from the pre-qualified consultant list. Any consultant who becomes suspended or debarred shall not perform work on any MoDOT or LPA project.

134.1.6 Frequently Asked Questions

A list of FAQs regarding consultant issues can be found on FHWA’s website.

134.1.7 Workforce Diversity

Diversity includes all the characteristics and experiences that define each individual. Diversity includes a wide range of individual characteristics such as age, religion, gender, race, ethnicity, disability and sexual orientation. Diversity can also include such things as communication style, work style, economic status and geographic origin. MoDOT supports and encourages diversity within the transportation industry. MoDOT’s desire is for the diversity of its consultants and contractors to reflect the diversity of the citizens of Missouri.

MoDOT’s engineering consultant solicitations require the consultant to describe their company’s approach to promoting and developing a diverse workforce. This category within the solicitation is a pass/fail category. An example of promoting and developing diversity is being involved with local secondary and higher education facilities to educate individuals in the field of engineering. Developing a cooperative/training program targeting the wide range of individual characteristics as listed above would be another example how firms are embracing workforce diversity. Continual efforts of encouraging a wide range of diverse individuals to the field of engineering will in turn develop a more diverse workforce.

Workforce diversity within the consulting firm as a whole can sometimes vary drastically from the diversity within the project team producing the work. Assembling diverse project teams is a way to support workforce diversity. Engineering consulting firms will be required to report on the project team’s diversity in the workforce diversity verification section of the template invoice, Fig. 134.5.1.1, Blank Consultant Invoice. See EPG 134.5.1.1 for workforce diversity reporting requirements.

Workforce diversity differs from Disadvantaged Business Enterprise (DBE). DBE focuses on firms owned and operated by socially and economically disadvantaged individuals. For more information on DBE, visit MoDOT’s External Civil Rights webpage.

134.2 Solicitation and Selection Process

When MoDOT needs consultant services, specific processes for soliciting and selecting a consultant must be followed. MoDOT must use the Qualifications Based Selection (QBS) for the procurement of engineering and design related services. This is mandated by both the federal and state law. See EPG 134.1.1 Federal Law and EPG 134.1.2 State Law for the applicable laws. If MoDOT does not follow the solicitation and selection process, federal funds could be jeopardized.

134.2.1 Professional Services Committee (PSC)

The PSC ensures MoDOT follows state and federal laws for the use of professional services. The committee is composed of the Transportation Planning Director, State Design Engineer (chair) and the State Bridge Engineer. The committee may incorporate additional Division Directors/Engineers for contracts involving areas under their responsibility.

MoDOT is committed to getting the “best value for every dollar spent”. This is accomplished in the consultant selection by using the QBS process and selecting the most qualified consultant not the lowest bidder. The PSC ensures MoDOT follows the QBS process for all MoDOT consultant procurements with the exception of the Design-Build projects where the Design Build Project Director is responsible for ensuring QBS is followed.

PSC approval is required at the following stages:

1. The PSC approves the district or division engineer’s request to solicit consultants to provide professional services for MoDOT. The PSC also approves the dollar amount of PE/CE budgeted for this professional services contract.
2. For standard contracts and supplemental agreements, the PSC approves the negotiated number of task-hours and the “not to exceed” amount of the contract concurrent with the execution of the contract. The division liaisons review and provide comments prior to the PSC approval.
3. For on-call contracts, the PSC approves district and division consultant selections for master agreements.

134.2.2 Consultant Solicitation and Selection Process - Standard Solicitation Method

Outlined below is the step-by-step process for Standard Consultant Solicitation and Selection Method. The standard solicitation method is used for most MoDOT Consultant projects. This method gives all consultants equal consideration during the solicitation process. Fig. 134.2.2 Processing Standard Consultant Contracts Checklist has been developed to help project managers through the paperwork process of hiring a consultant using the standard method.

134.2.2.1 Solicitation and Selection Step 1 – PE Funding

After the need to procure a consultant has been identified, the MoDOT Project Manager (PM) or Contract Administrator (CA) must first ensure that Preliminary Engineering (PE) funds are identified in the approved STIP or STIP amendment for this project and if applicable, the TIP or appropriate MoDOT Budget. The PM/CA should work with their District Planning Manager if there is a need to revise the STIP and/or TIP to adjust the funding levels to match the project costs.

134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC

The PM/CA will work with the core team members to develop a more detailed scope of services for the consultant contract. The PM/CA will also need to identify the following items prior to sending a request to solicit for a consultant services to the PSC:

1. Construction Project Information – Project Description
2. Construction Project Information – Fiscal Year for Construction Project Award
3. Construction Project Information – Estimated project construction amount
4. Scope of Services – Detailed description of anticipated consultant services.
5. Project Funding – Total consultant contract costs (not to exceed amount).
6. Project Funding – Total consultant contract costs broken down by fiscal year.
7. Project Funding – Anticipated budget to be used for consultant services.
8. Project Funding – State or federal funds for PE. All projects must be evaluated to determine if it will have federal assistance. Work with your Design Liaison Engineer to make this determination.
9. Project Funding – Amount of PE dollars in the STIP
10. Project Funding – Cost Share/Cost Participation Information or federal earmark (if applicable)
11. DBE Requirements –Once the scope of work is defined, the MoDOT PM/CA must obtain a DBE Goal by sending the appropriate project information to MoDOT External Civil Rights (ECR) for review at DBEConsultGoal@modot.mo.gov. The DBE goal shall be included in the PSC solicitation request letter and the solicitation itself. All consultant contracts that utilize federal funds must be reviewed by ECR, regardless of the dollar amount of the contract.
12. Will consultant selection process include interviews or presentation – can be determined by the PSC
13. Period of Service – for the consultant contract.
14. Selection Process – for procurement of consultant (ex: Standard Solicitation, Modified Solicitation etc.). See Consultant Presentations and Interviews, below, to determine if they are needed.
15. Selection/Procurement Schedule – Anticipated schedule for procurement.
16. Anticipated Incentive/Disincentive Provisions – for the consultant contract (if applicable) See EPG 134.5.6 Incentive and Disincentive Program.
17. The PM/CA should identify any additional division director(s) (e.g., Bridge, State Highway Safety and Traffic, Right of Way, Environmental, Construction, etc.) who may need to review and sign the PSC letter.

All of the items listed above must be included in the Solicitation and Request Letter prepared by the PM/CA and sent to the Design Liaison and all needed divisions for review. Once all the reviews have been completed and all comments addressed, the letter is sent to the PSC via the email group CODEPSCReview with the names of all signers needed. The solicitation must not contain any information concerning task-hours, labor rates or cost information. If a maximum known dollar value is available to fund the professional services contract, the dollar value may be noted in the solicitation to avoid submission of letters by consultants unable to provide the services for the expenditure MoDOT has determined as reasonable for the projects. Cost information can only be considered after a consultant has been selected and a contract is being negotiated. The solicitation should contain ALL of the rating categories that will be used to rate the consultant. MoDOT must follow RsMO 8.289 when evaluating the consultant but additional criteria can be added as long as it is published in the solicitation. PM/CAs must indicate on the Solicitation and Request Letter if consultant services are being requested for planning studies for more than Asset Management improvements. More-than Asset Management planning studies must meet the following criteria:

1. District has demonstrated that its asset management goals can be met over the next ten years, and
2. District has the financial ability to fund, or has written commitment from another entity to fund the construction of a significant portion, or more, of any improvement resulting from the study within ten years of the initiation of the study, and
3. The region has prioritized the study along with roadway and bridge improvements and is willing to fund the study with STIP right of way and construction funds or funding from others, or
4. The cost of the study is funded by another entity, with minimal MoDOT funding involvement for oversight and guidance.

The cost of more-than-TCOS planning studies will result in an adjustment to the district’s STIP right of way and construction funds, except for studies funded by other entities.

134.2.2.3 Solicitation and Selection Step 3 – Central Office Review of Solicitation Request

After all district / division reviews are complete and comments addressed the Solicitation and Request Letter is emailed to the PSC at CODEPSCreview email group. The PSC members will review the request and sign for approval with the PSC chair making the final approval signature. Central Office will then post the solicitation/Request For Qualifications (RFQ) to the MoDOT's Consultant Services Webpage. An electronic notification of the RFQ is sent to Design Consultant Distribution List alerting interested parties of the opportunity.

Consultant solicitations will be posted to MoDOT’s webpage twice a month, according to the RFQ Calendar found on the MoDOT Solicitations (RFQ) site.

134.2.2.4 Solicitation and Selection Step 4 – Consultant Response to the Solicitation/RFQ

Interested firms who wish to respond to the RFQ can submit a letter of interest. Cost information shall not be provided from the consultant at this time in the solicitation process. Cost can only be considered after a consultant is selected and the contract is being negotiated.

134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant

After the RFQ submittal deadline, MoDOT will evaluate the letters of interest or SOQ. The PM/CA verifies all firms are prequalified. MoDOT's Approved Consultant Prequalification List contains the prequalification information on the firms. According to state law RsMO 8.291, MoDOT must list a minimum of three highly qualified firms and then select the firm best qualified to perform the work, based on the rating criteria outlined in the RFQ. See Consultant Presentations and Interviews below for more information on presentations and interviews. When fewer than three responses are received, it is suggested the RFQ be re-advertised at least once. However, if the PM/CA suspects the readvertisement would not likely produce additional respondents, they should reach out to firms who received the solicitation but did not respond to attempt to gain information as to why the firm(s) did not respond; and if they would be likely to respond if the advertisement were extended or not. A written summary of the phone conversations should be kept in the project file and presented to the PSC for approval to move forward with less than 3 or to readvertise. If fewer than three responses are received again or if the decision is made by the PSC not to readvertise, then the PM/CA and District Design Liaison must consider whether there was some aspect of the RFQ that was overly restrictive or otherwise had an adverse impact on the completion of the project. If the decision is made to proceed without readvertisement, then the district should document the RFQ requirements were not restrictive, it was adequately publicized, and the one or two firms who responded are qualified to perform the tasks outlined for the project. The selection team will then rate all firms based on the criteria outlined in the RFQ. Past performance evaluations may be considered as part of the firm’s evaluation. Price quotations shall not be requested or used for consideration prior to selecting a firm. Price can only be determined AFTER the consultant is selected.

The Selection Team. The district and/or division forms a team to review the consultant responses and select a firm to provide the necessary services. In most cases, the team shall include at least three members, one of whom is from the Central Office (usually a Design, Construction or Structural Liaison Engineer). If a major component of the project is a specialty area supported only by Central Office staff, that division should be asked to participate as well. If the project is a project designated for federal involvement for any element related to Design or Construction Inspection, the Federal Highway Administration (FHWA) shall be offered the opportunity to participate as an observer. Should another entity (KDOT, IDOT, MPO, city, county, etc.) be funding part of the cost of the work that entity shall be offered the opportunity to participate as a member of the selection team.

Rating/Scoring the Consultants. Consultants MUST be rated based on the rating criteria that was published in the advertised solicitation. Adding or deleting any rating criteria after the solicitation expires is not allowed. If PM/CA wishes to have the option to shortlist respondents, the short-listing procedures and the weighted rating criteria used to short-list respondents must be included in the solicitation.

In order to short-list when presentations and interviews are not being conducted, a minimum of 10 respondents must be received, and the PM/CA shall have the ability to short-list down to a minimum of 3 qualified respondents. The rating criteria used to short-list shall include but is not limited to: The firms Pre-Qualification is current, Workforce Diversity, the firms listed experience as related to the advertised work, & the firms project team’s accessibility & availability. Shortlist scoring & a written summary of the shortlist selection shall be included in the eProject file, or wherever project files are retained, along with the eventual final scoring & selection of the most qualified firm.

If it's determined and noted in the solicitation request that the PM/CA will conduct interviews or presentations with the consultants, see Consultant Presentations and Interviews below for more information on how to rate and score the consultants. If interviews and/or presentations will not take place, the selection team can begin rating the consultants. The Consultant Rating Form, Fig. 134.2.2.5.1, shall be used to rate and select the most qualified firm.

Each member of the selection team will individually develop a numeric score to rate each firm using the categories listed in Fig. 134.2.2.5.1. The team will, as a group, compare these scores and discuss how they were determined. The team must reach consensus on the consultant to select. The team will create a rating summary as outlined in Fig. 134.2.2.5.2 clearly indicating which firm has been recommended for selection and documenting the selection process. The documentation must include written text on how the scores were determined. This documentation will be kept in the eProject file. Once the recommended selected firm is determined, send the Selection Approval letter (Fig. 134.2.2.5.3) for approval to the District Engineer/Division Engineer. With approval from the District Engineer/Division Engineer, the team can notify the selected firm. After contacting the firm, a copy of all documentation must be sent to Central Office via the email group CODEPSCReview including the signed Approval letter (Fig. 134.2.2.5.3) of the selected firm. The final, approved selected firm will be posted on MoDOT's Consultant Services webpage.

Consultant Presentations and Interviews

Most projects do not require interviews or presentations. The PM/CA will verify all respondents are current with their pre-qualification status and will verify the respondents workforce diversity statement as a pass/fail. The selection team may then select the most qualified firm by scoring the respondents and choosing the top ranked firm. Specific conditions that allow the selection to take place without interviews or presentations are as follows:

  • The scope and cost of the contract is considered to be minor or routine in nature.
  • The district or division is very familiar with the qualifications and capabilities of all the short-listed firms from previous services or presentations and believes presentations or interviews will not increase knowledge of the short-listed firms.
  • The need for an accelerated selection process due to the critical nature of the contract.

If interviews and/or presentations are required, the PM/CA will verify all respondents are current with their pre-qualification status, and will verify the respondents workforce diversity statement as a pass/fail. The selection team will then rate all the consultants based on the rating criteria published in the solicitation using Fig. 134.2.2.5.1 and as outlined above under Rating/Scoring the Consultants. Then the selection team will select the top 3-5 highest scoring firms and place them on a short list for further evaluation during presentations and/or interviews. If the PM/CA wants to interview less than 3 firms, approval must be granted by the PSC. Once the recommended selected firms are determined, send District/Division Approval of Short List (Fig. 134.2.2.5.4) for approval to the District Engineer/Division Engineer. With approval from the District Engineer/Division Engineer, the team can notify the selected firms. After contacting the firms, a copy of all documentation must be sent to the Central Office via the email group CODEPSCReview including the District/Division Approval of Short List (Fig. 134.2.2.5.4) of the selected firms. The final, approved selected firms will be posted on MoDOT's Consultant Services webpage. See Consultant Presentations and Consultant Interviews, immediately below.

Consultant Presentations. Before the presentations, the selection team must determine the scoring criteria (Fig. 134.2.2.5.5) to be used. These criteria can include many variables, but each element must be assigned a point value and expectations for assigning the maximum points should be developed. The PSC Chair is invited to attend the presentations. See the sample letter, Fig. 134.2.2.5.6, inviting the consultant to present.

After each consultant presentation, the selection team moves to a private location to discuss the presentation. Each member of the selection team will individually develop a numeric score to rate each firm based on the pre-determined criteria and scoring process. Although use of the example is not required, the criteria and scoring process must be determined prior to the actual presentation. The selection team will, as a group, compare these scores and discuss how they were determined; the selection team must reach consensus on the selected consultant.

The selection team will create a rating summary rating summary (Fig. 134.2.2.5.2) for all the short-listed firms, clearly indicating which firm is recommended for final selection and documenting the selection process in the eProject file. The rating summary is only one tool used in the selection. Although selection of the highest scoring firm is not required, if it is not selected the reasons must be documented. This documentation will be kept in the eProject file. The final approved selected firm will be posted at MoDOT's Consultant Services webpage.

Consultant Interviews. For a feasibility study, environmental assessment, environmental impact statement, major bridge design, major investment study, or at the PSC direction, the selection team should conduct interviews with the short-listed firms. This requires considerable preparatory work; however, the selection team can limit the number of consultant staff and specify particular individuals as well as the opening topics. (See Fig. 134.2.2.5.7 sample letter to interview). Before the interviews, the selection team must determine the interview questions along with a description of the correct type of answer. Depending on the complexity of the questions, 15 to 18 questions will fill the time allotted. Additionally, the scoring criteria must be pre-determined. These criteria can include many variables, but each element must be assigned a point value and expectations for allocating the maximum points should be developed. The PSC Chair is invited to attend the interviews. A sample format for an interview (with time guidelines) follows:

During the interview, each selection team member individually scores the consultant as each question is answered. After each interview, the selection team discusses the consultant responses and averages the scores from the entire team. After the final interview, the team will, as a group, compare these scores and discuss how the firms rank; the selection team must reach consensus on the consultant to select. The selection team will create a rating summary clearly indicating which firm is recommended for selection and documenting the selection process. The rating summary is only one tool used in the selection. Although selection of the highest scoring firm is not required, if it is not selected the reasons must be documented. This documentation will be kept in the eProject file. The team must receive approval from the District or Division Engineer before notifying the selected consultant or any other parties. The final, approved selected firm will be posted on MoDOT's Consultant Services webpage.

134.2.3 Consultant Solicitation and Selection Process – Noncompetitive

There may be occasions when the standard QBS solicitation process is not appropriate. Each occasion will be evaluated on a project by project basis. Projects for which competition is determined to be inadequate after solicitation, emergency work affecting public safety or highly specialized knowledge that would result in a single consultant responding to the RFQ are candidates for Noncompetitive Procurement (23 CFR 172.7(a)(3)). Examples of specialized work are; hazardous waste services, wetland mitigation, urgent bridge projects and historic preservation services. The PM/CA will work with their Design Liaison Engineer to determine if a PSC Noncompetitive Approval is appropriate and if so, will complete and submit the Solicitation and Request Letter (Fig. 134.2.2.2) to PSC via the email group CODEPSCReview for PSC review and approval.

The Noncompetitive Method may be appropriate for projects with any of the following conditions:

1. The critical nature of the work requires an accelerated selection process. The term “critical nature” refers to tasks required as a result of unanticipated events, legal actions or compliance with directives from regulatory agencies. However, the PSC Chair will consider these requests on a case by case basis.
2. The scope of services requires highly specialized knowledge and expertise that limits the number of qualified firms. Examples are underwater bridge inspection, designs to address environmental mitigation, and cultural resource investigations.
3. The work qualifies for the small purchase category. This category includes those contracts with a cost less than $25,000 and required services outside the work categories for an On-Call MOU contract.

134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

Every three years MoDOT requests interested firms to respond to a Master Agreement RFQ, which lists specific work categories in a specific district or Central Office Division. The selected consultant is approved to only provide professional services under a Memorandum of Understanding (MOU) for the district/division in their selected work category. Each respective district/division evaluates the letters of interest from responding consultants, completes the consultant selection process, following RsMO 8.291, and requests PSC approval of the selected consultants. Once the PSC approves the selections, the Design Division drafts and executes a Master Agreement with each approved consultant and also maintains a list of consultants approved to provide services under the Master Agreement per district and/or division. The current on-call consultant list is available at MoDOT's Consultant Prequalification Requirements. The following lists the specific work categories approved for the 2020-2023 Master Agreements:

District Work Categories
1. Construction Materials Testing & Inspection
2. Roadway Design
3. Surveying
Division Work Categories
1. Bridge Deck Surveys
2. Bridge Design
3. Disadvantaged Business Enterprise (DBE)
4. Environmental - Cultural Resources
5. Environmental - Endangered Species
6. Environmental - NEPA
7. Environmental - Noise Studies
8. General Services - Architectural/Interior Design
9. General Services - Civil/Structural
10. General Services - Mechanical/Electrical
11. Geotechnical Engineering Services
12. LiDAR & Photogrammetry
13. Pavement Friction Testing
14. Value Engineering
Statewide District Use Categories
1. Right of Way Acquisition & Relocation Services
2. SUE
3. Traffic Engineering
4. Traffic – Electrical Engineering
5. Traffic – ITS Management & Design
6. Traffic – Safety Data Analysis
7. Traffic – Structures
8. Utility Accommodation & Coordination

Deletions or additions to the on-call consultant list require the PSC Chair’s approval. Approval to use a consultant other than on the district’s or division’s approved list may be granted upon written request to the PSC. MoDOT's Consultant Prequalification Requirements webpage contains the lists of approved on-call consultants.

Information on the financial prequalification process for consultants can be found on MoDOT's Consultant Prequalification Requirements webpage. Consulting firms must be financially prequalified for selection to the On-Call Consultant list and must maintain their prequalification throughout the three-year term of the Master Agreement. To execute an MOU with a consultant, the selected consultant must be pre-qualified and have current E-Verify on file.

To ensure on-call contracts are used as intended, the PSC has established several guidelines:

1. All district MOUs must be approved by the Design Liaison Engineer prior to selection of an on-call consultant to ensure all other resources have been considered.
2. The Master Agreement may be executed for a maximum period of three years, although the master agreement may include provisions for a one-year extension at the end of the three-year period.
3. No single MOU will exceed a total cost of $200,000. Neither the district, nor Central Office, may, in any instance, execute multiple MOUs for a single job for services that exceeds a total of $200,000 in aggregate. MOUs within the $200,000 limit do not need prior PSC approval for execution and can be executed by the respective District Engineer or division engineer (up to $100,000) or a member of the Executive Committee (over $100,000). If an MOU is near the $200,000 limit, the Project Manager/Contract Administrator (PM/CA) shall contact their Design Liaison Engineer to determine if the project will follow the guidance of EPG 134.2 Solicitation and Selection Process.

Master Agreement Execution Process

Outlined below is the process of executing the Master Agreement for On-Call Contracts.

1. The RFQ is posted to the web and electronic notification is sent to interested parties listed on the Design Consultant distribution list.
2. The district/division rates and develops a list of selected consultants.
3. The PSC chair approves the selection of consultants for specific work categories in each district/division.
4. Only Approved Pre-Qualified Consultants are eligible for Master Agreement. The pre-qualification process also includes a review of the firm’s indirect cost rate.
5. Since the amount of future services to be performed under the agreement is unknown, the allowable fixed fee based upon direct labor cost is limited to 12 percent.
6. The Design Division develops a “Master Agreement” to be executed by the approved consultant(s). This agreement outlines the basic conditions of the contractual relationship and specifies the work category(ies). The Master Agreement is the foundation for a Memorandum of Understanding (MOU) that the district or division later executes with a consultant to address the need for a specific scope of services in a specific work category. When the agreement is created and saved in eAgreements, the system will auto-assign a new file name. This auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.
7. Design Division drafts the Master Agreement in eAgreements and executes the Master Agreements electronically through DocuSign.

The district or division then follows the procedures below for executing individual MOUs to obtain services as the need arises.

MoDOT MOU Execution Process

Fig. 134.2.4 Processing On-Call/MOU Consultant Contracts Checklist has been created to guide project managers through the process of hiring an on-call consultant through close- out of the MOU.

Outlined below is the process of executing an MOU for On-Call Contracts.

1. All MOUs will be federally funded, therefore, the Project Manager/Contract Administrator (PM/CA) must choose the federal MOU contract from the eAgreements SharePoint site, unless approved by the PSC to use a state funded MOU contract (state funded MOU contracts may be used if the funding source is the District/Division budget).
2. All District MOU’s must be reviewed and approved by the assigned Design Liaison Engineer prior to selection of an on-call consultant to ensure all other resources have been considered.
3. PM/CA to choose the MOU contract from the eAgreements SharePoint site.
The federal MOU contract must be used for all MOU’s unless approved by the PSC to use a state funded MOU contract (state funded MOU contracts may be used if the funding source is the District/Division budget). When the agreement is created and saved in eAgreements, the system will auto-assign a new file name. This auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.
4. Development of Scope of Services and DBE Requirements – Once the scope of work is defined, the MoDOT PM/CA must obtain a DBE Goal by sending the appropriate project information (including scope, county, estimated construction cost, and potential subcontracting opportunities) using the Estimated Breakdown of Work Spreadsheet to MoDOT External Civil Rights (ECR) for review at DBEConsultGoal@modot.mo.gov. Once the DBE goal has been established by ECR, it shall be included in the MOU. All consultant contracts that utilize federal funds must be reviewed by ECR, regardless of the dollar amount of the contract. If the prime consultant or any sub-consultants are DBE firms, the DBE section must be filled out. If the prime or subs are not DBE firms, the DBE section can be left blank.
5. The PM/CA will review the on-call consultant list and choose a consultant based on the scope of services that has been developed and DBE goal established. The on-call consultant list is found on the MoDOT Website – Consultant Services – Consultant Prequalification Requirements.
Note: Only firms that are prequalified with MoDOT financially can be chosen from the on-call consultant list. Firms must update their information yearly in order to stay current on their prequalification. MoDOT’s consultant prequalification list can be found on the MoDOT Website – Consultant Services – Consultant Prequalification Requirements.
6. Consultant agreements are to be sent to the assigned Design Liaison Engineer for “Review by Staff” in eAgreements.
7. DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded MOU to the consultant for execution. The PM/CA will send External Civil Rights (email group DBEConcurrence) as a “Reviewer”, along with the assigned Liaison Engineer, when processing the agreement for “Review by Staff” in eAgreements. ECR will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.
8. After receiving the DBE Concurrence from External Civil Rights, the PM/CA will send the MOU to the consultant for execution. Agreements may be executed by wet signatures or electronic signatures in DocuSign. Electronic signatures are encouraged to expedite the execution process.
9. The respective District Engineer, division engineer or Executive Committee member will execute the MOU as described in MHTC Policy "Delegation of Authority for Approval and Execution of Documents".
10. If using electronic signatures, copies of the fully executed agreement will be distributed to the recipients entered into DocuSign (see below for the Central Office Divisions that must receive a copy of the fully executed agreement).
If using wet signatures, the PM/CA is responsible for uploading a copy of the fully executed MOU in eAgreements, sending the consultant a copy of the fully executed agreement, and sending a link to the fully executed agreement to the appropriate Central Office Divisions. (See Item 9, below, for the Central Office Divisions that must receive a copy of the fully executed agreement.)
11. The PM/CA must email an electronic link to the fully executed agreement to the following Central Office Divisions:
  • Financial Services Division (email group Obligate with message “Obligate - please obligate funds for the fully executed agreement” and provide any specific funding details here, as applicable).
  • Design Division (email group CODEPSCReview with message “CODEPSCReview - fully executed agreement for your records”).
Note: If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing NTP to the consultant:
  • Financial Services indicating the obligation of funds is complete.
  • External Civil Rights (ECR) indicating concurrence in DBE participation.
12. The PM/CA will send the NTP letter (Fig 134.4.2) to the consultant AFTER:
  • Receiving DBE concurrence from External Civil Rights
  • Execution of the contract
  • Obligation of federal funds by Financial Services.

134.3 Consultant Contract Negotiation

Tasks, hours and price are negotiated after a consultant is selected and notified. During this process, price can be considered. Firms must be listed on the Approved Annual Financial Pre-Qualification List in order to provide professional services to MoDOT. Additional scope beyond what was advertised in the RFQ cannot be negotiated into the contract.

The selected firm will use the provisional overhead rate that was accepted by MoDOT during the firm’s prequalification process with MoDOT. If the firm elects to voluntarily reduce their overhead rate, the following language must be incorporated into the contract:

“The Company has voluntarily reduced its overhead rate to ___%. This rate will be used on all billings. Upon completion of these services outlined under this Agreement the final payment for these items will be based on accounting records of the Consultant incurred during the period of the Agreement. MoDOT reserves the right to require the actual audited overhead rates be used if those rates are less than the voluntarily reduced rate noted previously.”

134.3.1 Engineering Services Contract (ESC)

Contract negotiation should follow the schedule provided in the solicitation. Consult Chief Council’s Office CCO early in the negotiation phase for any proposed changes in the boilerplate agreement language. Modifications to the standard agreement language may be considered only where no other compromise can be reached to successfully negotiate the agreement, and must be approved “as to form” by CCO. If the PM/CA works with their Regional Counsel to approve the revisions to the boilerplate agreement, that Regional Counsel will need to approve the partially executed contract “as to form”. In general, no changes are allowed to the ESC.

The standard engineering services contracts (ESCs) can be found in the eAgreements SharePoint site. ESCs must follow the eAgreements process for drafting, reviewing and executing, as defined in EPG 153 Agreements and Contracts and the eAgreements Training Manual. In addition, the appropriate approvals must be obtained through the Professional Services Committee (PSC) process. When the agreement is created and saved in eAgreements, the system will auto-assign a new file name. This auto-assigned file name must be used as the agreement number, in the header, within the agreement itself.

The MoDOT unit responsible for the contract, either the district or the division, provides the consultant with an electronic PDF copy of the tentative contract. The tentative scope of services (including Specifications of Electronic Design Data for Consultants and MoDOT) may be provided in a non-PDF electronic format. The PM/CA is responsible for completing the Consultant Contracts. Contract language must be approved by CCO input prior to execution of the contract.

After reviewing the tentative contract and scope of services, the consultant prepares a proposal containing a detailed estimate of cost that includes task-hours, basic pay rates, pre-qualification accepted overhead rates, direct costs and fixed fee. Each of these items is reviewed by MoDOT to ensure it is reasonable with respect to the type of work involved and anticipated size of the contract. PM/CAs are responsible for the quality and content of professional services agreements. Fig. 134.3.1, District Checklist for Reviewing Consultant Contracts is a tool provided for PM/CAs to utilize while reviewing contracts.

Prior to receiving & negotiating the Scope and Fee from the selected firm, the PM/CA shall develop an Independent Cost Estimate (ICE) in compliance with 23 code of Federal Regulations (CFR) Part 172.7(a)(1)(v)(B) to serve as the basis for the negotiation of the contract.

After the PM/CA and consultant agree to the terms of the agreement, the PM/CA converts the Word document to a pdf file in eAgreements. The pdf file should include the Scope of Services and Exhibits.

134.3.1.1 Liability Insurance

The MoDOT Standard Consultant Contract language includes provisions for the amount of liability insurance that the consultant must provide to cover claims that may result from errors, omissions, or negligent acts of the consultant. Insurance Certificate of Liability must meet Missouri’s Sovereign Immunity Limits. In rare instances, the PM/CA may request an Acceptance of MHTC Liability to reduce the insurance requirements on the consultants. This process must obtain PSC approval and follow the procedures outlined in the Acceptance of MHTC Liability, available through the CCO, depending on the nature and complexity of the services.

A copy of the certificate of liability insurance for the prime consultant is to be requested by the PM/CA and kept in the project files with the executed contract. It is the responsibility of the consultant to meet the insurance requirements of the contract. Receipt of the consultant’s certificate of insurance liability does not imply approval of the amounts.

134.3.1.2 Payment Bond

State statute requires that in the event that any subconsultants are used to supply at least twenty five thousand dollars ($25,000) worth of materials and/or labor not within the scope of environmental assessment services or licensed professional services as defined by Chapter 327, RSMo, the consultant shall require any such subconsultants to provide laborers and materialmen with adequate bond security.

The payment bond value shall equal the amount of the total subcontracted non-engineering services and applicable direct costs. If there is uncertainty about whether an item of work is considered as non-engineering or as an applicable direct cost, it should be included in the amount covered by the payment bond. Fully document all decisions regarding contracted services not included in the payment bond amount and retain in the project file until the contract has been closed and audited for final payments. A copy of the payment bond is to be requested by the project manager and kept in the district project files with the executed contract.

For more information on the payment bond language, refer to DE01 Consultant Services Master Agreement (All_Fees).

134.3.2 Fixed Fee Review

The fixed fee is the profit to the consultant. It is based on the scope, complexity of the project, contract duration, risk to the consultant, amount of sub consultant management, and professional nature of the services as well as the size and type of contract. Fixed fees are calculated based upon direct salary cost. Direct salary cost includes direct labor, overhead on direct labor, plus general and administrative overhead. It does not include travel expenses, printing, miscellaneous expenses or sub consultant costs. The Facilities Capital Cost of Money Rate (FCCM) shall not be included in the fixed fee calculation. The percentage of the fixed fee to the direct salary cost must not exceed the maximum allowable profit curve shown in Fig. 134.3.2 MoDOT Allowable Profit Curve. For standard solicitation contracts, the maximum allowable profit is capped at 15 percent, even if calculated to be higher. For consultant contracts that potentially include multiple future phases, the fixed fee will be based on the estimated total direct salary cost for the current phase plus all future phases. For MOU contracts, the maximum allowable profit is 12 percent as agreed to in the Consultant Services Master Agreement, DE01. The maximum subconsultant fixed fee for MOUs is also capped at 12 percent.

Fixed fees shall not be calculated on direct expenses. Sub consultants are a direct expense to the prime consultant. Therefore, sub consultant expenses are not included in the fixed fee calculations for the prime consultant. It should be noted the “fixed fee” is a fixed dollar amount and will be paid in full at the conclusion of the contract, even if the consultant does not use all the hours in the contract. Therefore, care should be taken to not overestimate man-hours.

134.3.3 Task-Hours Review

In order to establish a measure of “Fair & Reasonable” a pre-negotiation estimate is required by federal regulations in 2 CFR 200.324. The MoDOT PM/CA shall develop an estimate based on the task-hours that MoDOT would require to perform the same service. The consultant task-hour estimate is reviewed and compared to the MoDOT estimate. The consultant’s fee proposal submittal must include detailed hours and cost breakdowns by sub-task and by job title. For any subtask on the scope, it should be known how many different people, how many hours per person, any direct expenses, etc. for the prime and any subs. Negotiations should occur to assure that task-hours in the contract are comparable to the MoDOT estimated hours and those from similar projects. PMs should confer with the appropriate Central Office liaison for concurrence with the review.

134.3.4 Basis of Payment

The majority of Design Consultant Engineering Services Contracts are actual cost contracts. This means that all costs submitted for payment must be based on actual wages, overhead. Federal regulations (FAR Part 16.102) prohibit the use of cost plus a percentage of cost or percentage of construction costs as a method of compensation. The following methods may be used as the basis of payment in a contract:

  • Actual Cost Plus Fixed Fee (majority of contracts)
  • Specific rates of pay (for emergency situations only)
  • Lump Sum (prior approval required).

Each Subcontractor or subconsultant must be identified in the contract. Subcontractor expenses should also be calculated based upon actual costs. Prompt payment of subconsultants is required per FAR Subpart 32.9.

Per EPG 134.3.5.1, if the consultant is using a subconsultant with a cost exceeding $25,000, then the subconsultant shall include a detailed estimate of cost and a detailed overhead rate schedule (cost plus fixed fee breakdown).

Per EPG 134.3.5.2, if the consultant is using a subconsultant with a cost that DOES NOT exceed $25,000 then a letter quote from the subconsultant can be submitted with the engineering service contract.

Retainage is not allowed as a routine part of the contract i.e. blanket retainage is prohibited. Payment may be withheld on any particular work item that has not been completed in accordance with the contract. This can include work incidental to the work item, and required documentation directly related to the work.

Direct costs must be estimated using current Privately Owned Vehicle (POV) mileage reimbursement rates and per diem rates for Missouri. These rates can be found on the following web pages.

Mileage, subsistence and lodging must follow federal travel regulation guidelines.

134.3.5 Subconsultants

The use of subconsultants is allowed provided that each firm is identified in the engineering services contract. DBE firms should be listed under Disadvantaged Business Enterprise (DBE) Requirements, and other subconsultants should be listed in Subconsultants. The use of 2nd and 3rd Tier subconsultants is not allowed, that is, only the prime consultant can have subconsultants, the subconsultants cannot have subconsultants. Subconsultants do not have to be prequalified but it is strongly encouraged especially if the subconsultants routinely performs work >$25,000.

134.3.5.1 Subconsultant Cost Exceeding $25,000

If the consultant is using a subconsultant with a cost exceeding $25,000, then the subconsultant shall include a detailed estimate of cost and a detailed overhead rate schedule (cost plus fixed fee breakdown). Fig. 134.3.6.1.1 lists common unallowable costs. If the subconsultant is prequalified, the overhead rate listed must be the current overhead rate accepted by MoDOT through the annual financial prequalification process. In this case, a detailed overhead rate schedule would not be required.

If the subconsultant is not pre-qualified with MoDOT then the firm shall also include their Consultant Certification of Indirect Cost Form. Each subconsultant in this category must show its overhead in the required format. Fig. 134.3.6.1.2 provides an example Overhead Schedule. The detailed overhead rate schedule should be reviewed for possible unallowable costs per FAR Part 31.2, Fig. 134.3.6.1.1 lists common unallowable costs. The prime consultant is responsible for ensuring that all subconsultants comply with state and federal regulations, such as E-Verify, and are registered to do business in Missouri.

134.3.5.2 Subconsultant Cost NOT Exceeding $25,000

If the consultant is using a subconsultant with a cost that DOES NOT exceed $25,000 then a letter quote from the subconsultant can be submitted with the engineering service contract. The letter should quote the subconsultant’s cost shown in Exhibit III of the consultant contract. It is preferred however, that the subconsultants have cost plus fixed fee break down. If the subconsultant is not pre-qualified with MoDOT, the firm shall also include their Consultant Certification of Indirect Cost Form. The prime consultant is responsible for ensuring that all subconsultants comply with state and federal regulations, such as E-Verify, and are registered to do business in Missouri.

134.3.6 Ceasing Negotiation

If the district/division cannot negotiate a reasonable price with the consultant selected, they can formally cease negotiations with a formal written letter and begin negotiations with the next most qualified firm. After the district/division has ceased negotiations with the selected firm and have started negotiations with the next most qualified firm, they cannot go back to the first firm and start another round of negotiations; this is looked upon as price shopping and is unallowable. See the FHWA Consultant Services webpage for more information. If a contract cannot be negotiated with the second consultant, MoDOT may choose to negotiate with the third most qualified consultant. At any time, all proposals may be rejected and MoDOT can re-advertise the project with a revised scope.

134.3.7 Negotiation Documentation

All correspondence with the consultant during the course of the negotiations shall be documented and included in the eProject file for the consultant contract, including all email correspondence. Document in writing all verbal communication and personal visits with the consultant regarding the contract negotiations and include in the eProject file. These records shall be maintained for a period of three years after the final voucher is submitted in FMIS by Financial Services. If any litigation, claim, negotiation, audit or other action involving the records is started before the expiration of the three-year period, the records are retained until completion of the action and resolution of all issues arising from it or until the end of the three-year period, whichever is later.

134.3.8 Contract Assurances

Prior to executing a contract with a consultant, MoDOT will assure the following:

1. The consultant has been apprised of all applicable technical work requirements and administrative controls, including those of the FHWA and any other agencies that may have jurisdictions over the project.
2. After selection, the firm was provided all pertinent information relative to the desired engineering services or other professional services requested. The tentative contract set out the scope of the services in sufficient detail to provide the consultant with a definite knowledge of the services and results expected. The consultant was instructed to submit a proposal that indicated clearly identifiable, sufficiently detailed, and easily auditable charges for the work and/or units of work. These proposed charges (rates and man-hours) were reviewed for acceptability before negotiations proceeded.
3. Contracts include a requirement for a three-year retention of records after the final voucher is submitted in FMIS by Financial Services. On actual cost contracts, the consultant was informed that records must be open for inspection by authorized government personnel.

134.4 Contract Approval, Execution and Distribution

Once the district and the division agree to the man-hours, salary rates, overhead rates, direct costs, and fixed fee, the information is submitted to the PSC for review and approval, via the email group CODEPSCReview. See Fig. 134.4.1. The submittal letter to the PSC documents that the above procedures have been followed and the requirements of Brooks Act, 23 CFR 172 and RSMO Section 8 have been satisfied. When approved by the PSC, the standard contract language, the scope of services and the consultant’s cost proposal are made part of a formal agreement for execution.

Consultant agreements are to be sent to the assigned Liaison Engineers for “Review by Staff” in eAgreements.

DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded agreement to the consultant for execution. The PM/CA will include External Civil Rights (email group DBEConcurrence) as a “Reviewer”, along with the assigned Liaison Engineers, when processing the agreement for “Review by Staff” in eAgreements. External Civil Rights will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.

After receiving the DBE Concurrence from External Civil Rights, the contract may be executed. MHTC authorization to execute the contract may be obtained in one of following ways:

1. Projects in the Statewide Transportation Improvement Program (STIP)
The Commission’s approval of the STIP includes delegation of authority to execute professional services contracts for projects contained in the STIP. The execution of agreements is done either by electronic or wet signature. Instructions are included in the eAgreements Training Manual and summarized below.
2. Projects Not Included in the STIP
To obtain authorization to execute contracts for projects that are not included in the approved STIP and have a contract ceiling exceeding $25,000, the contracts must be presented to the MHTC at a regularly scheduled monthly meeting. The appropriate division places these contracts on the Commission agenda for the next meeting. The District Engineer or division engineer should be prepared to discuss this item at the Commission meeting in case questions arise. After obtaining authorization to execute the contract from the Commission, the contract administrator then proceeds with the execution process.

Execution and Distribution of the Professional Services Contract

The Professional Services Contract shall be executed electronically in DocuSign:

  • Electronic Signatures – Signing agreements electronically in DocuSign will expedite the execution process. The PM/CA must add all recipients in the DocuSign site that need to sign and/or receive an electronic copy (see below) of the fully executed agreement.

The PM/CA must send an electronic copy of the fully executed agreement to various Central Office Divisions. For electronically executed agreements, this is done by cc:/ in DocuSign. The following are the Central Office Divisions that must be notified:

  • Financial Services Division (email group Obligate with message “Obligate - please obligate funds for the fully executed agreement and please advise when we can give a NTP” and provide any specific funding details here, as applicable).
  • Design Division (email group CODEPSCReview with message “CODEPSCReview - fully executed agreement for your records”).

Note: If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing Notice to Proceed the consultant:

  • Financial Services indicating the obligation of funds is complete
  • External Civil Rights (ECR) indicating concurrence in DBE participation.

If federal funds were used to finance the contract, Financial Services submits a copy of the executed contract to the FHWA Finance Section for approval. Federal funds will not be paid for charges to the contract prior to FHWA approval. Any supplemental agreements are also submitted to the FHWA after execution.

Notice to Proceed Letter

The PM/CA is responsible for sending a Notice to Proceed (NTP) Letter (Fig. 134.4.2) to the consultant. The NTP cannot be sent prior to:

  • Receiving DBE concurrence from External Civil Rights.
  • Execution of the contract.

134.5 Consultant Contract Administration

A MoDOT employee will be assigned as the PM/CA for each contract, including contracts in which the services are for project management of a construction project or for contract administration. MoDOT's PM/CA is responsible for administering the contract and overseeing the consultant’s progress towards the provision of services required by the contract. Some of these responsibilities are:

1. Scheduling and attending progress meetings with the consultant and being involved in decisions leading to change orders or supplemental agreements.
2. Being familiar with the qualifications and responsibilities of the consultant’s staff.
3. Assuring that costs billed are consistent with the acceptability and performance of the consultant’s work.
4. Monitoring the consultant’s operations, as necessary, and adequately documenting contract performance (prior to final settlement of the contract) for later use.
5. Conducting interim technical and audit evaluations as deemed necessary during the performance of the consultant contract.
6. Completing performance evaluations in the Design Consultant Database at major milestones and at the completion of the contract. An evaluation is to be completed at least annually.
7. Notifying the Design Division, Financial Services and AI when a project is complete and finalized. The PM/CA should make arrangements with the Resident Engineer to be notified when construction is complete.

134.5.1 Invoicing

The consultant files a monthly invoice and progress report to the PM/CA. The invoice template found in Fig. 134.5.1.1 must be used for all consultant contracts. Prime consultant invoices must use Fig. 134.5.1.1. Sub-consultants who have a contract with the prime that is greater than $25,000 must either use Fig. 134.5.1.1 or provide all the information that is listed in this figure to be considered acceptable. Each invoice must be submitted with the necessary supporting documentation and must be numbered in sequential order and label the final invoice as FINAL. The invoice shall be based on the total incurred cost during the invoice period. Invoices should identify each task in the scope of work, as well as the employees and hours spent on each task during the billing period. Direct costs must also be shown by task. The MoDOT Consultant Invoice Checklist (Fig 134.5.1.2) can be used as tools to ensure all proper documentation is in place for each invoice in order for the invoice to be accepted and paid. Fig. 134.5.1.5 is available as an example of a filled-out invoice.

The PM/CA should make every effort to see that the consultant is paid in a timely manner, the goal being 30 days. Missouri law states that the consultant is entitled to interest if the invoice is not paid in 45 days. The 45-day period starts when all questions about the invoice have been addressed and agreed to by both parties.

The PM/CA uploads a copy of the invoice to Financial Services' Contractual Payments Library following the step-by-step instructions, which includes the PM/CA indicating the invoice as having been reviewed, thus approving it for payment. Fig. 134.2.2 and Fig. 134.2.4 are checklists to help PM/CAs with the paperwork process for Standard and On-call contracts, including invoicing.

The following metadata fields are required:

  • Name (J#, invoice#, Consultant abbrev.)
  • Job No. (include the J)
  • Financial No. (if known)
  • Agreement No. (eAgreements)
  • Payee/Vendor
  • Invoice Date
  • Invoice Number
  • Invoice Amount
  • Final Invoice (if applicable)
  • District/Division/Office
  • Reviewed and Approved (checkbox)
  • Reviewed and Approved By
  • Activity Code
  • Link to eAgreements (first invoice only)
  • Payment Status (default to New Entry)
  • Comment (if necessary).

The following are the most frequently used activity codes:

Activity Description
R351 Conceptual Plans
R352 Surveying/Mapping
R354 Preliminary Plans
R356 Final Design Plans
R358 Final Construction Plans
R35A Support – Build New Hwys & Bridges

If the contract encompasses more than one job number, or if there are separate invoices, each invoice will need to be uploaded separately and the partnering jobs listed in the comment section of the metadata. When the last invoice is submitted for payment, the final invoice checkbox should be checked. This notifies Financial Services that the contract is complete. (See EPG 134.5.3 Consultant Contract Close-Out).

If the consultant project/agreement has more than 4 jobs associated with it, the PM/CA will continue to submit the Consultant invoices to Financial Services electronically by utilizing the Contractual Payments system.

Design-Build (contractor) invoices and non-contractual invoices will continue to be submitted electronically by email to Financial Services at Contractual.Payments@modot.mo.gov. However the design-build consultant invoices should be submitted using the Contractual Payments Library.

If errors are found on the consultant invoice, the PM/CA should contact the consultant and request a corrected invoice. The PM/CA should never change an invoice. The invoice should be sent back to the consultant for corrects and they must re-date the invoice and re-submit to MoDOT. If the consultant makes an error and requests more reimbursement than allowed by the contract, the PM/CA may submit the invoice and authorize payment of an amount less than the invoice requests. The reasons for paying an amount different than the invoice requests must be clearly documented in the cover letter.

If the period of service in the contract has lapsed, a letter to extend the period of service signed by both MoDOT and the consultant must be completed prior to paying any invoices. For hourly-rate contracts the period of service is defined in the MOU not the Master Agreement.

Consultant invoices for projects administered by the Bridge Division should be submitted electronically by the consultant directly to BRInvoiceAdmin@modot.mo.gov and the Structural Liaison Engineer assigned to the project should be copied on the email.

Electronic payments to a consultant may be set up by submitting an “Electronic Funds Transfer” form. Information is available at MissouriBUYS.

134.5.1.1 Workforce Diversity Verification

The workforce diversity verification section of the template invoice (Fig. 134.5.1.1, Blank Consultant Invoice ) must be filled out. The verification summary should contain the project team’s diversity, not the company wide diversity. For reporting purposes, females and minorities are the only diversity categories that must be reported in the verification summary. The following groups are considered to be minorities: Black, Hispanic, Asian, American Indian, Native Hawaiian or Pacific Islander. The report is based on the hours worked by minorities and women during each invoicing period.

134.5.2 Supplemental Agreements

Supplemental agreements are used to add/delete work within the scope of services that was advertised in the RFQ. Supplemental agreements cannot be used to increase the scope of work outside the solicitation/RFQ or to increase overhead or fixed fee. For example, a no cost supplemental agreement can be executed to extend the period of service as outlined in the original consultant contract.

Each supplemental agreement must include new subconsultants, and modifications to the scope of services, new cost estimates and schedule or period of service adjustments as applicable.

Costs associated with these modifications to the scope of services may be covered by the unit costs included in the original contract or by a newly negotiated cost in the supplemental agreement. Direct costs and overhead costs for the services contained in the supplemental agreement should reflect the costs that will be in effect during the performance of the service.

Once it is determined that the scope of services needs modification, the PM/CA follows the same negotiation process for the supplemental agreement that is followed for new contracts through submission to the PSC, via the email group CODEPSCReview. Any modifications to the scope of services, whether it results in a change in cost or not, must be included in an approved supplemental agreement. If a DBE goal was established in the original contract it will continue to apply. The agreement must be executed prior to the consultant receiving authorization to proceed with the modified scope of services. Supplemental Agreements for extension of time, with no additional cost, are not required to be submitted through the PSC. The district or division director has the delegation of authority to sign the Supplemental Agreement if the total contract is below $100,000. If the combined original contract cost and the supplemental agreement cost are above $100,000, then a member of the Executive Committees must sign the supplemental agreement. The executed copy of the Supplemental Agreement must be submitted through CODEPSCReview.

When a supplemental agreement is necessary, additional funds to cover the added costs in the contract must be identified from the appropriate budget category and be approved as a necessary expenditure.

Supplemental agreements shall be sent to the assigned Liaison Engineers for “Review by Staff” in eAgreements.

DBE Concurrence must be obtained from External Civil Rights prior to sending a federally funded agreement to the consultant for execution. The PM/CA will include External Civil Rights (email group DBEConcurrence) as a “Reviewer”, along with the assigned Liaison Engineers, when processing the agreement for “Review by Staff” in eAgreements. External Civil Rights will respond to the email notification if any additional DBE information is needed - including, but not limited to, specific DBE details, such as name of DBE firm, DBE Goal, dollar amount of DBE participation, Exhibits such as Scope of Services, Fee Estimate, etc.

After receiving the DBE Concurrence from External Civil Rights, the contract may be executed. The contract information is submitted to the PSC via the email group CODEPSCReview using PSC Approval to Execute Supplemental Agreement, Fig. 134.5.2. After PSC approval, the PM/CA will execute the supplemental agreement. The supplemental agreement is executed electronically in DocuSign:

  • Electronic Signatures – Signing agreements electronically in DocuSign will expedite the execution process. The PM/CA must add all recipients in the DocuSign site that need to sign and/or receive an electronic copy (see below) of the fully executed supplemental agreement.

The PM/CA must send an electronic copy of the fully executed supplemental agreement to various Central Office Divisions. For electronically executed agreements, this is done by cc:/ in DocuSign. The following are the Central Office Divisions that must be notified:

  • Financial Services Division (email group Obligate with message “Obligate - please obligate funds for the fully executed agreement” and provide any specific funding details here, as applicable).
  • Design Division (email group CODEPSCReview with message “CODEPSCReview - fully executed agreement for your records”).

Note: If federal funds are used, the PM/CA must wait for email notifications from the following Central Office Divisions before issuing Notice to Proceed to the consultant:

  • Financial Services indicating the obligation of funds is complete
  • External Civil Rights (ECR) indicating concurrence in DBE participation

If federal funds were used to finance the contract, Financial Services submits a copy of the executed contract to the FHWA Finance Section for approval. Federal funds will not be paid for charges to the contract prior to FHWA approval. Any supplemental agreements are also submitted to the FHWA after execution.

Notice to Proceed Letter

The PM/CA is responsible for sending a Notice to Proceed (NTP) Letter (Fig. 134.4.2) to the consultant. The NTP cannot be sent prior to:

  • Receiving DBE concurrence from External Civil Rights.
  • Execution of the contract
  • Obligation of federal funds by Financial Services.

134.5.3 Consultant Contract Close-Out

To close out a consultant contract the PM/CA must notify Design, External Civil Rights and Financial Services that the last invoice is the FINAL invoice and no further payments will be processed. The PM/CA must change the Agreement Status to “Completed” in eAgreements to initiate the retention schedule of the document and to accurately track open/closed contracts. See EPG 134.5.1 Invoicing for information on invoicing and the appropriate email addresses to send the FINAL invoices. Contracts include a requirement for a three-year retention of records after the final voucher is submitted in FMIS by Financial Services.

Final Audit. MoDOT conducts a final audit to determine total allowable contract costs, unless the contract is on a firm, fixed-price basis. Allowable cost principles are identified based on the experience of MoDOT personnel in administering past contracts and in accordance with applicable requirements of 2 CFR 200.400, Federal Acquisition Regulation (FAR), and 23 CFR 172, Administration of Engineering and Design Related Service Contracts.

The PM/CA is responsible for notifying Design when the contract is substantially complete. The final audit may be conducted any time after the project is let; the consultant contract need not be completed for the final audit to be conducted.

Should MoDOT agree prior to contract execution that it is necessary for a consultant to purchase special equipment, materials, or property to accomplish the required services, MoDOT will establish a before and after value and will receive an appropriate credit for any residual values. This credit is passed on to FHWA.

134.5.4 Consultant Performance Appraisals

The MoDOT PM/CA must perform an Online Evaluation of the consultant’s performance under any engineering services contract with MoDOT at each project milestone and at a minimum, on an annual basis during the term of the consultant’s services provided by the contract. Input for the evaluation should be requested from other divisions that may have project experience with the company, such as the Environmental section, or Construction Division. MoDOT’s PM/CA also completes a final comprehensive evaluation of the consultant’s performance within 30 days after contract completion. The evaluation is included in the project file. MoDOT personnel complete another evaluation of the consultant’s performance within 30 days of completion of the construction phase of the project. The evaluation must contain written comments on how the evaluation was determined. All evaluation comments must be factual and not based upon personal opinion, i.e. all comments must be able to be backed up by actual facts.

Upon completing any evaluation, furnish a copy to the consultant prior to meeting with the district or division project manager to discuss the evaluation. These evaluations are included in MoDOT’s Design Consultant Database and are used during consideration of the consultant for future work assignments. The PM/CA is defined as the project manager, or other person who is responsible for reviewing and approving the consultant’s invoices.

134.5.5 Restitution for Errors and Omissions

At times, errors or omissions in the project design or in the information provided for the project may become evident during a project’s bidding or construction phases. When this occurs, the causes surrounding the errors or omissions are investigated to determine a final resolution, which may require financial restitution. A face-to-face meeting between the DE and the consultant will take place to discuss the situation.

The procedure for investigating errors or omissions is:

1. Contractor/RE initializes a change order with the reason code – CD (Consultant Design Error). The RE and PM from Construction and Design review the change order and develop recommendation for action and assessment of both direct and indirect costs.
2. The District Construction and Material Engineer and the District Engineer review and provide comments.
3. The District Engineer reviews and makes final district recommendations. Form is forwarded to the Construction Division.
4. The Construction Division Liaison Engineer, the Design Division Liaison Engineer and CCO jointly make the final decision regarding pursuit of reimbursement. The district is informed of the decision.
5. If the decision is to pursue recovery of costs, then CCO drafts a “Letter of Notice” for the District Engineer’s signature.
6. The District Engineer sends the Letter of Notice to the Financial Services Division – Accounts Receivable Section (FS A/R) requesting an invoice be created. A copy is to be sent to the Design Division.
7. Upon receipt of DE’s Letter of Notice to the design consultant, Financial Services Division will create an invoice for the claim and submit it directly to the design consultant with the Letter of Notice. The revenue source code of 1814-05 “Design Consultant Claims” will be used to track reimbursement by design consultants.
8. If the consultant does not respond by the “respond by date” in the Letter of Notice, then the Design Liaison Engineer presents the background information to senior management, who decides whether to begin legal proceedings to pursue reimbursement of costs. If legal proceedings are pursued, the Design Liaison Engineer notifies Financial Services Division – Accounts Receivable.

Should formal dispute resolution as detailed in EPG 134.6 Dispute Resolution be initiated during the above procedure, the following steps will ensure MoDOT receives payment:

1. The PM/CA, with the help of CCO, prepares and provides the FS Director with a letter from the State Design Engineer to the consultant indicating the Dispute Resolution Committee’s (DRC) decision and the dollar amount of restitution.
2. The FS Director prepares an invoice for the restitution payment and sends it to the consultant with the letter from the State Design Engineer. A copy of the letter and invoice is provided to the Design Division and the district. These documents indicate the payment is made to Department of Revenue – Credit State Road Fund and mailed to:
Missouri Department of Transportation
Financial Services
P.O. Box 270
Jefferson City, Mo. 65102
The FS Director will track the invoice to ensure payment is received from the consultant in a timely manner.

134.5.6 Incentive and Disincentive Program

MoDOT has instituted an incentive and disincentive program with the consulting industry to assure that consultants:

1. Deliver the most cost-efficient design that provides the right solution to the identified need (i.e., Practical Design)
2. Deliver quality plans
3. Deliver the roadway and bridge design plans on time as required in the contract
4. Prepare construction cost estimates that are within an acceptable range of the contract award amount.

The incentive and/or disincentives vary according to the listed category. This program will not be used on every MoDOT roadway and bridge design contract. The incentive and disincentives will be used in whole or in part on major projects that are critical to MoDOT accountability with the public. Fifty percent of the fixed fee is the maximum disincentive that can be incurred. When the district requests approval from the PSC chair to solicit consultant services, the approval will specify whether the contract will or will not include the incentive/disincentive program. Project specific incentives and disincentives will be noted in the contract agreement.

Cost-effective Design (Practical Design) and Quality Plans. The consultant’s performance on delivering the most cost-efficient design that provides the right solution for the identified need will become a part of the consultant performance evaluation. Quality of Plans will be based on the score for overall performance.

Evaluation scores must be considered on all future contract selections. Consultants who perform poorly or who do not deliver cost-effective designs will not be considered for future contracts until they demonstrate to MoDOT that significant changes have been made within their company to address the concerns. The PSC will monitor this performance and MoDOT staff will be kept informed on the status of any firms that are not being allowed to compete for projects.

Deliver Roadway and Bridge Design Plans on Time.

Right of Way Plans. The project manager should use the flowchart below to determine whether the incentives or disincentive are applicable based on the scheduled delivery date contained in the current contract or supplemental agreement. If changes are made by MoDOT that impact scheduling, the letting date may be re-negotiated .
Design Plan Delivery Flow Chart.png


Final Plans, Surveys, and Estimates. The project manager should use the flowchart below to determine whether the incentive or disincentive is applicable based on the scheduled delivery date contained in the current contract or supplemental agreement. If changes are made by MoDOT that impact scheduling, the letting date will be re-negotiated.
PS&E Delivery Flow Chart.png


Accurate Cost Estimates are critical for MoDOT to be able to deliver the program promised to the public. Program estimates are published in the STIP and each district programs sufficient projects each year to spend every dollar allocated. Poor estimating causes MoDOT numerous problems at letting. Once the project budget has been set it is then the design consultant’s responsibility to design a good project that satisfies the purpose and need within that budget. The project manager should use the flowchart below to determine whether the consultant qualifies for an incentive or disincentive based on their project estimates.
Incentive Disincentive Decision Flow Chart.png


134.6 Dispute Resolution

134.3.3.jpg

Once a consultant is selected to work for MoDOT, circumstances may arise that lead to a dispute between MoDOT’s PM/CA and the consultant. In most cases, a complete understanding and recognition of each party’s concerns will result in successful resolution of the disagreement. However, when that is not the case, this dispute resolution procedure is used.

The relationship between the consultant and MoDOT is a professional contractual relationship. All parties to the contract should understand the dispute resolution process. The PM/CA and the consultant should make every attempt to fully understand the dispute and express honest statements of fact prior to initiating formal dispute resolution. In this context, the PM/CA is defined as the person who authorizes MoDOT’s payment of the consultant invoices.

Before initiating formal dispute resolution, the following activities should occur:

1. The district engineer, or division engineer (hereinafter indicated by “DE”) prepares a letter to the consultant outlining the contested issues.
2. The disputing parties (project manager level for both MoDOT and consultant) participate in a face-to-face meeting.
3. The consulting firm conveys the firm’s recommendations for resolving the dispute.
4. MoDOT’s representative discusses the consultant’s proposed resolution and responds in a letter, either accepting the proposal or offering a rebuttal.
5. MoDOT and the consultant attempt to negotiate a settlement.

If the PM/CA and the consultant reach an agreement that provides the consultant with payment greater, or less than the contract maximum, the PM/CA needs to initiate a supplemental agreement and follow normal procedures to get the supplemental agreement executed, including approval by the PSC. If no settlement is forthcoming, formal dispute resolution is initiated.

134.6.1 Initiating Formal Dispute Resolution

When attempts between the PM/CA and the consultant have failed to resolve the disagreement, the consultant should enumerate the firm’s concerns in a letter to the DE, thereby initiating formal dispute resolution. A Dispute Resolution File should be started by the PM/CA.

Disagreements may arise over the scope of services, fees, hours, the consultant evaluation, errors and omissions, or other issues. Initiation of the resolution process will in no way be reflected on negatively in the consultant’s performance evaluation. The consultant’s letter to the DE should specifically outline the disagreement and the consultant’s view of the issues. This detailed letter must include:

1. A clear description of the items that are being disputed
2. What the consultant desires to resolve the dispute
3. Background—the sequence of events that led to the dispute
4. Documentation to support the request
5. All correspondence between the parties relating to the items in dispute (including e-mail)
6. A listing of previous attempts to resolve the issue (including e-mail)
7. A copy of the contract and any supplemental agreements

Upon receiving the consultant’s letter and documentation, the DE will have the PM/CA prepare a similar letter, also addressed to the DE, outlining the administrator’s view of the disagreement with particular attention to the information in the consultant’s letter. MoDOT may also initiate formal dispute resolution by the PM/CA sending a letter, under the DE’s signature, to the consultant contact listed in the contract. The consultant should be directed to respond to the department’s letter. As a courtesy, the PM/CA should notify the consultant project manager before writing this letter.

134.6.2 Dispute Review by District or Division Engineer

The PM/CA transmits the letter documenting the issues of the dispute, with the consultant’s letter attached, to MoDOT’s DE for review. In addition, the DE also notifies the Assistant Chief Engineer and the State Design Engineer that formal dispute resolution has been initiated. With this notice, the State Design Engineer begins tracking the dispute resolution process. Whenever the two parties in the dispute reach a resolution, the State Design Engineer should be notified of the following:

1. Where in the process resolution was reached
2. The date resolution was reached
3. What resolution was reached

The DE evaluates the information in the letters, discussing it with the PM/CA and the consultant project manager as necessary.

134.6.3 Meeting of the Two Parties

The DE arranges a meeting with the consultant principal. If an agreement is reached after discussion between the DE and the consultant principal, the DE provides a letter to the firm indicating the terms of the agreement. However if agreement is still not reached, the dispute may be taken to the Dispute Resolution Committee.

134.6.4 Dispute Resolution Committee

The Dispute Resolution Committee (DRC) is comprised of the Assistant Chief Engineer (acting as chair), Director of External Civil Rights, and Chief Financial Officer. In preparation for the DRC’s meeting, the DE will share written details of the formal dispute resolution’s outcome to this point with the State Design Engineer who then facilitates the DRC procedures. The committee will review this information together with other background information, including the original letters from the PM/CA and the consultant project manager outlining the dispute. When the committee meets, all representatives of the disputing parties are given the opportunity to attend. The DRC discusses the issues with the disputing parties and tries to reach a resolution satisfactory to both parties. If a resolution cannot be reached, an offer of mediation is made to the two parties. Should both parties agree to use mediation to settle the claim, they will share the cost of mediation equally.

If an agreement is reached, the DRC sends the consultant a letter outlining the resolution of the dispute.

134.6.5 Mediation

A mediator is an outside party who facilitates a discussion between the disputing parties and enables them to explore options to reach agreement. Responsibility for dispute resolution is solely that of MoDOT and the consultant. The mediator has knowledge of the process and the general terms of the dispute but is not intimately knowledgeable of all project details.

After the consultant has accepted MoDOT’s offer for mediation, the State Design Engineer is responsible for making arrangements for a mediator. This includes selecting an approved mediator from a list (developed jointly by ACEC and MoDOT) and arranging the time and place of the meeting. Participants at the meeting are limited to the DE, the DRC’s chair, the consultant principal, and the mediator. Others, including the PM/CA and the consultant project manager, are not active participants in this meeting but may provide information if the mediator so requests. Legal representation is optional. The disputing parties are responsible for their own costs associated with the mediation but will share all expenses associated with the mediator equally.

Should the mediation result in the dispute’s resolution, the DRC sends the consultant a letter explaining the resolution of the dispute. However, should the mediation not result in resolution of the dispute, the issue is forwarded to MoDOT's Chief Engineer for final action.

134.6.6 Final Decision by the DRC

When mediation fails, the State Design Engineer will notify the DRC and MoDOT’s Chief Engineer and provide any additional information gathered during the mediation process. The Chief Engineer will review the information provided and if desired, meet with the members of the DRC to discuss the results of the dispute resolution process up to that point. Upon decision by the Chief Engineer, the State Design Engineer provides a letter to the DE and the consultant principal informing them of the decision. When the consultant receives the letter from the State Design Engineer outlining the decision of the Chief Engineer, the firm may respond; however, formal dispute resolution will have been completed and MoDOT will not entertain further appeals from the consultant.


134.3.3.7.jpg

ko

Dispute Resolution Process (DRP)

ko

Articles in "134 Engineering Professional Services"

This category contains only the following page.