User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:05, 22 November 2016 diff hist 0 N File:751.10.1.14 shape 10.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 example.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 part section.jpg current
- 09:04, 22 November 2016 diff hist +2,248 m 751.10 General Superstructure Per BR, expanded and clarified hairpin guidance especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
- 08:31, 22 November 2016 diff hist +28 m 751.5 Structural Detailing Guidelines updated link
- 16:14, 21 November 2016 diff hist +1 m Main Page
- 13:43, 21 November 2016 diff hist -94 m 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Notes: Per BR, further clarified revision from 7/10/14 about mechanical bar splices
- 13:42, 21 November 2016 diff hist +118 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per BR, further clarified revision from 7/10/14 about mechanical bar splices by updating MBS example figure
- 16:05, 18 November 2016 diff hist 0 m Main Page
- 14:17, 18 November 2016 diff hist 0 N File:751.5.9.2.8 example.pdf
- 14:17, 18 November 2016 diff hist -22 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Updated Mechanical Bar Splice Ex. figure
- 14:12, 18 November 2016 diff hist +147 m 751.6 General Quantities Per Bridge, clarified revision from 7/10/14 about mechanical bar splices.
- 14:10, 18 November 2016 diff hist -660 m 751.50 Standard Detailing Notes Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Note B1.9.7 removed.
- 11:23, 18 November 2016 diff hist 0 m 103.1 Bid Opening and Award Process Per DE, updated due dates chart link
- 11:21, 18 November 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per DE, updated due dates chart link
- 08:54, 18 November 2016 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.10 Cold Weather Placement: Per CM, revised to conform with the specs.
- 08:14, 18 November 2016 diff hist -172 m 236.4 Description Writing and Titles Per RW, removed archaic RW43, Request for Proposals - Title Company Services (Form 4-4.5b)
- 15:29, 17 November 2016 diff hist +178 LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:28, 17 November 2016 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 15:27, 17 November 2016 diff hist 0 N File:136.9.3 2016.docx
- 15:27, 17 November 2016 diff hist +7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, updated Fig. 136.9.3 to reflect the current versions of specs and standard plans
- 09:22, 17 November 2016 diff hist 0 N File:134.2.4 Nov 17 2016.docx
- 09:21, 17 November 2016 diff hist +9 m Category:134 Engineering Professional Services Fig. 134.2.4, minor update
- 08:49, 17 November 2016 diff hist 0 N File:134.2.4 Nov 2016.docx
- 08:48, 17 November 2016 diff hist +3 m Category:134 Engineering Professional Services Per LPA, revised Fig 134.2.4. Added #5 in the fig that was accidentally deleted during the last revision.
- 11:35, 16 November 2016 diff hist +254 m Category:153 Agreements and Contracts Per RW, updated links and minor changes to wording
- 13:49, 15 November 2016 diff hist 0 m Main Page
- 12:09, 15 November 2016 diff hist +3 m Help Article
- 12:05, 15 November 2016 diff hist +1 m Help Article →EPG Approval Process
- 10:25, 15 November 2016 diff hist -143 m 771.16 Penetrating Concrete Sealer - Silane →Materials: Per EPG, removed reference to archaic Penetrating Concrete Sealer JSP (which was a BSP)
- 09:55, 15 November 2016 diff hist +41 m 153.21 Traffic Per TR, updated link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement
- 09:53, 15 November 2016 diff hist -1 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:52, 15 November 2016 diff hist -9 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:51, 15 November 2016 diff hist -322 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others: Per TR, replaced TR-15A link with link to CCO’s sharepoint site for TR-32, Supplemental Signing Agreement.
- 09:47, 15 November 2016 diff hist +178 m Category:903 Highway Signing Per TR, replaced TR 15A with a link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement.
- 08:37, 15 November 2016 diff hist -576 m 153.21 Traffic Per Commissioner's Secr. deleted TR08-A since it is now TR3
- 16:02, 14 November 2016 diff hist -46 m 153.21 Traffic Per Commissioneer's Secr, removed two archaic agreements and added two new ones
- 14:55, 14 November 2016 diff hist 0 N File:Fig. 806.8.1 2016.docx current
- 14:54, 14 November 2016 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Storm Water Compliance Coord'r, minor updated for Fig. 806.8.1 MoDOT/Contractor Responsibility
- 09:48, 14 November 2016 diff hist +34 m 236.3 Administration Per Env'l, updated RES link
- 09:46, 14 November 2016 diff hist +34 Category:101 Standard Forms →Environmental and Cultural: Per Env
- 09:44, 14 November 2016 diff hist +34 m Category:128 Conceptual Studies Per Env'l, updated RES link
- 09:35, 14 November 2016 diff hist +68 m 127.1 Request for Environmental Services Per Env'l, updated RES link
- 14:41, 10 November 2016 diff hist +209 m Main Page EPG 127
- 14:09, 10 November 2016 diff hist -788 127.9 Floodplain Management Per Env'l, updated to reflect new processes and forms
- 13:47, 10 November 2016 diff hist -14 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated links
- 13:45, 10 November 2016 diff hist 0 N File:127.11 SCS CPA.pdf
- 13:45, 10 November 2016 diff hist 0 N File:127.11 AD 1006.pdf
- 13:45, 10 November 2016 diff hist -30 m 127.11 Farmland Conversion updated links
- 12:14, 10 November 2016 diff hist -2,133 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties →127.21.2 Project Development Milestones: Per Env'l, updated to reflect new processes and forms current
- 12:02, 10 November 2016 diff hist 0 m 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article
- 12:02, 10 November 2016 diff hist +87 N 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article current
- 12:00, 10 November 2016 diff hist +6 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated link
- 11:59, 10 November 2016 diff hist +6 m Category:128 Conceptual Studies updated link
- 11:58, 10 November 2016 diff hist +574 127.11 Farmland Conversion Per Env'l, updated to reflect new processes and forms
- 11:00, 10 November 2016 diff hist -1,856 Category:1053 Concrete Sealer Per EPG, to conform with new Sec title current
- 10:53, 10 November 2016 diff hist +85 m Category:1000 MATERIALS retitled EPG 1053
- 10:52, 10 November 2016 diff hist +2,259 N Category:1053 Concrete Sealer and Concrete Crack Filler Per EPG, retitled EPG 1053 Concrete Sealer to this new title to conform with retitled sec
- 10:50, 10 November 2016 diff hist +52 m Where to Find Construction and Materials Functions updated link
- 10:06, 10 November 2016 diff hist -41 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 10:05, 10 November 2016 diff hist 0 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article
- 10:05, 10 November 2016 diff hist +72 N 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article current
- 10:05, 10 November 2016 diff hist +1 m Category:170 Maintenance Activity Planning Guidelines
- 10:04, 10 November 2016 diff hist +1 m 770.1 District Routine Maintenance and Special Crew Responsibilities current
- 10:00, 10 November 2016 diff hist +10 m Category:170 Maintenance Activity Planning Guidelines updated link
- 09:58, 10 November 2016 diff hist +5 m 770.1 District Routine Maintenance and Special Crew Responsibilities updated link
- 09:57, 10 November 2016 diff hist -4 m 771.15 Concrete Bridge Deck Sealer Selection Matrix updated link
- 09:54, 10 November 2016 diff hist +32 771.16 Penetrating Concrete Sealer - Silane →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 09:33, 10 November 2016 diff hist +200 m Category:717 Neoprene and Silicone Joint Systems delted old article current
- 09:32, 10 November 2016 diff hist +65 m Category:700 STRUCTURES AND HYDRAULICS Re-titled EPG 717
- 09:31, 10 November 2016 diff hist +182 Nm Category:717 Flexible Joint Systems Per EPG, new article to conform with Sec 717's new title. No change in guidance from old EPG 717 Neoprene and Silcone Joint Systems current
- 15:18, 9 November 2016 diff hist -433 m 236.6 Appraisal and Appraisal Review updated 49 CFR 24.103 link
- 15:14, 9 November 2016 diff hist 0 N File:806.8 EC Pre Con.pdf current
- 15:13, 9 November 2016 diff hist 0 N File:806.8 SW Database and Checklist.pdf
- 15:13, 9 November 2016 diff hist +208 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP)
- 14:19, 9 November 2016 diff hist -9 m Main Page
- 14:19, 9 November 2016 diff hist -9 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 14:17, 9 November 2016 diff hist -68 m Main Page EPG 101, EPG 236.6
- 11:47, 9 November 2016 diff hist -4 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Inspection QRG.pdf
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Initial Setup QRG.pdf
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Deficiency QRG.pdf
- 11:45, 9 November 2016 diff hist +173 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Storm Water Compliance Coord'r, replaced the Land Disturbance Proj Info QRG with three new Land Disturbance QRGs.
- 11:07, 9 November 2016 diff hist -2,137 m 236.6 Appraisal and Appraisal Review →236.6.2 Scope of Assignment: Per RW, updated to reflect current practices. Removed "Scope of Assignment for Simple Assignment or Experienced Staff and Fee".
- 15:15, 8 November 2016 diff hist 0 m 106.16 Special Designs and Shop Drawings 106.16 Special Designs moved to 106.16 Special Designs and Shop Drawings: at request of Bridge
- 15:15, 8 November 2016 diff hist +54 N 106.16 Special Designs 106.16 Special Designs moved to 106.16 Special Designs and Shop Drawings: at request of Bridge current
- 14:18, 8 November 2016 diff hist -61 m Main Page EPG 106.16
- 13:58, 8 November 2016 diff hist +2,973 m 106.16 Special Designs and Shop Drawings Per CM and BR, expanded guidance for handling drawings from suppliers
- 13:19, 4 November 2016 diff hist 0 m Main Page
- 08:25, 4 November 2016 diff hist -11 m 949.2 Speed Limit Guidelines Per RW, updated TMS link
- 08:21, 4 November 2016 diff hist -11 m Category:145 Transportation Management Systems (TMS) Per RW, updated TMS link
- 08:20, 4 November 2016 diff hist -11 m 236.16 Outdoor Advertising Per RW, updated TMS link
- 12:24, 3 November 2016 diff hist -2 m Category:108 Prosecution and Progress →Example 4: Per CM, corrected date in Example 4
- 07:17, 3 November 2016 diff hist +2 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.1 Introduction
- 10:06, 2 November 2016 diff hist -5 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes
- 09:25, 2 November 2016 diff hist 0 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes: Per TS, corrected sizes of EMERGENCY SIGNAL sign
- 14:44, 1 November 2016 diff hist 0 N File:Main Page 2 November 1, 2016.jpg current
- 14:43, 1 November 2016 diff hist 0 N File:Main Page November 1, 2016.jpg current
- 14:43, 1 November 2016 diff hist +69 m Main Page
- 11:02, 1 November 2016 diff hist -283 m Main Page EPG 643.2.16.1, EPG 616.16, EPG 236.4.4
- 10:23, 1 November 2016 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private →643.2.16.1 Buy America Guidelines for Utilities: Per DE and FHWA, the steel industry won against the federal stance on Buy America. We will use the older, more relaxed, FHWA interpretation of BA
- 09:17, 1 November 2016 diff hist 0 m 236.4 Description Writing and Titles →236.4.4.2 Title Information - Phase I
- 09:15, 1 November 2016 diff hist -247 m 236.4 Description Writing and Titles →236.4.4 Title Datum and Allied Services: Per RW, updated the agreements between Commission and abstractor or title companies to be current with business is conducted
- 08:40, 1 November 2016 diff hist -14 m 616.16 Law Enforcement Services Per CM and TS, additional guidance for incorporating law enforcement to contractor projects and maintenance operation work zones.
- 07:18, 1 November 2016 diff hist -49 m Category:101 Standard Forms →Environmental and Cultural: Per Env'l, updated Instructions for the RES Form.
- 07:16, 1 November 2016 diff hist 0 N File:127.1 Instructions for the RES Form.docx
- 07:16, 1 November 2016 diff hist -49 m 127.1 Request for Environmental Services Per Env'l, updated Instructions for the RES Form.
- 12:14, 31 October 2016 diff hist 0 m Main Page
- 13:33, 28 October 2016 diff hist 0 N File:134.5.1.3 2016.xlsx current
- 13:32, 28 October 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, added a section to Fig. 134.5.1.3 for workforce diversity reporting requirements
- 12:22, 28 October 2016 diff hist -2 m Category:101 Standard Forms →Construction and Materials: updated CM form links
- 08:24, 27 October 2016 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy →616.14.5 Tracking Measures
- 08:24, 27 October 2016 diff hist 0 N File:616.14.5.jpg current
- 08:24, 27 October 2016 diff hist -7 m 616.14 Work Zone Safety and Mobility Policy →616.14.5 Tracking Measures
- 10:13, 26 October 2016 diff hist +28 m Main Page
- 09:59, 26 October 2016 diff hist -355 m Main Page EPG 153
- 09:31, 26 October 2016 diff hist 0 N File:153 Agreements Process 2016.doc current
- 09:30, 26 October 2016 diff hist +871 m Category:153 Agreements and Contracts Per TP, revised guidance due to implementation of eAgreements
- 10:30, 25 October 2016 diff hist +1 m Main Page
- 10:29, 25 October 2016 diff hist +78 m Main Page EPG 751.50
- 10:28, 25 October 2016 diff hist +344 m 751.50 Standard Detailing Notes →I1. General: Per BR, clarified cleaning and coating in accordance with Sec 1080 in note I1.51.
- 07:15, 25 October 2016 diff hist +1 m Main Page
- 07:14, 25 October 2016 diff hist -134 m Main Page EPG 751.50
- 07:11, 25 October 2016 diff hist -276 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, deleted last sentence of H3.29.1 and H3.49.1 because this criteria is already covered in Notes H3.26 and H3.46 respectively.
- 10:44, 24 October 2016 diff hist +1 m 616.8 Typical Applications (MUTCD 6H)
- 10:44, 24 October 2016 diff hist 0 N File:616.8.42 DECM 2016.pdf current
- 10:44, 24 October 2016 diff hist 0 N File:616.8.23 MT 2016.pdf
- 10:43, 24 October 2016 diff hist 0 N File:616.8.12a MT 2016.pdf current
- 10:43, 24 October 2016 diff hist 0 N File:616.8.12 MT 2016.pdf current
- 10:43, 24 October 2016 diff hist 0 N File:616.8.11 MT 2016.pdf current
- 10:42, 24 October 2016 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, minor revisions for several TAs. In TA 11MT, 12MT and 12aMT, "should" is replaced with "may" to be consistent with MUTCD.
- 09:30, 24 October 2016 diff hist -19 m Main Page
- 09:28, 24 October 2016 diff hist +63 m Main Page
- 09:26, 24 October 2016 diff hist 0 N File:Main Page October 24, 2016.jpg current
- 09:25, 24 October 2016 diff hist -105 m Main Page
- 10:51, 21 October 2016 diff hist +1 m Main Page
- 07:13, 21 October 2016 diff hist +3 m 943.3 AASHTO Policy on Route Marking and Application Updated link to US Route Numbering - Electronic Application Form
- 11:23, 20 October 2016 diff hist +4 m LPA:136.13 LPA Policy Changes
- 11:22, 20 October 2016 diff hist +382 m LPA:136.13 LPA Policy Changes EPG 136.6.2
- 11:19, 20 October 2016 diff hist +172 m LPA:136.6 Environmental and Cultural Requirements Per LPA, added clarifying sentence to help LPAs find info in Fig. 136.6.4
- 10:16, 20 October 2016 diff hist -1 m Category:101 Standard Forms →Construction and Materials: corrected a link
- 08:52, 20 October 2016 diff hist +5 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link to Pile Driving Data
- 14:28, 19 October 2016 diff hist 0 N File:103.1 award letter.docx
- 14:27, 19 October 2016 diff hist +8 m 103.1 Bid Opening and Award Process Per Bidding and Contracts, updated award letter form
- 14:20, 19 October 2016 diff hist -272 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, deleted two archaic QRGs.
- 09:23, 19 October 2016 diff hist +9 m Category:101 Standard Forms Per Bidding and Contracts, clarification of form
- 10:42, 18 October 2016 diff hist 0 N File:Main Page October 18, 2016.jpg current
- 10:42, 18 October 2016 diff hist +108 m Main Page
- 10:03, 18 October 2016 diff hist 0 m Main Page
- 12:44, 17 October 2016 diff hist 0 N File:616.14 WZ Questions 2016.docx
- 12:44, 17 October 2016 diff hist -28 m 616.14 Work Zone Safety and Mobility Policy Per CM, updated WZ Questions for the Core Team form
- 15:18, 14 October 2016 diff hist +129 m Category:101 Standard Forms →Design Forms: Per EPG, updated JSP forms
- 14:35, 14 October 2016 diff hist 0 m Main Page
- 09:04, 14 October 2016 diff hist +31 m Category:101 Standard Forms →Construction and Materials
- 08:55, 14 October 2016 diff hist +30 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 07:09, 13 October 2016 diff hist +19 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.16 On the Job Training (OJT) (23 CFR Section 230): Per ECR, minor clarification
- 13:46, 11 October 2016 diff hist +838 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, further clarification for verification that contractors comply with the law on subsistence deductions from employee paycheck
- 13:02, 11 October 2016 diff hist -9 m Main Page
- 13:00, 11 October 2016 diff hist +2 m Main Page
- 12:58, 11 October 2016 diff hist 0 N File:Main Page 2 October 11, 2016.jpg current
- 12:58, 11 October 2016 diff hist 0 N File:Main Page October 11, 2016.jpg current
- 12:57, 11 October 2016 diff hist +307 m Main Page
- 14:35, 7 October 2016 diff hist 0 m Main Page
- 10:52, 7 October 2016 diff hist +180 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated links to two QRGs
- 10:50, 7 October 2016 diff hist +468 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, added links to forms
- 10:46, 7 October 2016 diff hist -12 m Category:101 Standard Forms →Construction and Materials
- 10:41, 7 October 2016 diff hist +641 m Category:101 Standard Forms →Construction and Materials: Per CM, added new links to forms
- 10:35, 7 October 2016 diff hist +3,061 m Category:101 Standard Forms →Construction and Materials: Per CM, added new links for forms
- 10:05, 7 October 2016 diff hist +171 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Peer CM, updated links
- 09:35, 7 October 2016 diff hist +482 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated links
- 09:16, 7 October 2016 diff hist +139 m Category:101 Standard Forms →Materials Related: Per CM, updatedlinks
- 09:09, 7 October 2016 diff hist -2 m Category:101 Standard Forms →Construction and Contractor Related
- 09:06, 7 October 2016 diff hist -202 m Category:101 Standard Forms →Forms for Contractor Use: Per CM, updated links
- 08:51, 7 October 2016 diff hist -318 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 08:27, 7 October 2016 diff hist -1,041 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 12:43, 6 October 2016 diff hist -13 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details: Per BR, minor correction
- 08:18, 6 October 2016 diff hist -117 m Category:101 Standard Forms →Materials Related: Per CM, removed archaic Aggregate Quality Control Plan.
- 08:11, 6 October 2016 diff hist -8 m LPA:136.13 LPA Policy Changes
- 08:09, 6 October 2016 diff hist +304 m LPA:136.13 LPA Policy Changes EPG 136.8.4.1.1.10.1
- 08:06, 6 October 2016 diff hist -292 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per LPA, removed federal wage rate language to stay current with federal regulations
- 07:53, 6 October 2016 diff hist +205 m LPA:136.13 LPA Policy Changes Removed Fig. 136.6.4
- 07:52, 6 October 2016 diff hist -77 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, Fig. 136.6.4 LPA Request for Environmental Review (RER) was eliminated and replaced with a link to the new RER
- 07:47, 6 October 2016 diff hist +51 m LPA:136.3 Federal Aid Basics →136.3.8 Programs: Per LPA, Fig. 136.6.4 LPA Request for Environmental Review (RER) was eliminated and replaced with a link to the new RER
- 10:51, 4 October 2016 diff hist -10 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others
- 10:50, 4 October 2016 diff hist 0 N File:127.25.2.1 Hazardous.docx
- 10:50, 4 October 2016 diff hist -83 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others: Per Env'l, updated Hazardous Materials Response Plan document
- 08:29, 4 October 2016 diff hist -432 m Main Page
- 14:30, 3 October 2016 diff hist -1 m Main Page
- 11:30, 3 October 2016 diff hist -9 m 236.13 Designing Right of Way Plans Per RW, "How to Use the DGN Merger" updated to provide better results of dgn/cadd files for Spatial Editor
- 07:12, 3 October 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents updated PS&E table links
- 07:10, 3 October 2016 diff hist 0 m 103.1 Bid Opening and Award Process
- 12:38, 30 September 2016 diff hist -134 m 751.50 Standard Detailing Notes →H1. Steel
- 12:24, 30 September 2016 diff hist +12 m 751.50 Standard Detailing Notes →J1. General: Per BR, added a subscript "r" as necessary
- 09:15, 30 September 2016 diff hist +49 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, clarified Note H2c2.2
- 09:08, 30 September 2016 diff hist +862 m 751.50 Standard Detailing Notes Per BR, corrected and clarified Notes B3.22 and H1.42. New Note H1.43.
- 15:25, 29 September 2016 diff hist +4 m Main Page
- 14:52, 29 September 2016 diff hist -26 m Main Page EPG 236.5
- 14:35, 29 September 2016 diff hist -103 m 236.5 Property Management →236.5.21.5 Full Disclosure Clause: Per RW, the full disclosure clause updated to reflect how MoDOT currently handles property conveyances.
- 14:27, 29 September 2016 diff hist -27 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, provided different link for the change order template
- 13:58, 29 September 2016 diff hist +198 m 238.2 Land Surveying Per RW, updated Form A-472
- 09:05, 29 September 2016 diff hist -5 m Main Page EPG 751.5.1.4
- 08:56, 29 September 2016 diff hist 0 N File:751.5.1.4 adding 2016.jpg current
- 08:55, 29 September 2016 diff hist 0 N File:751.5.1.4 deleting 2016.jpg current
- 08:55, 29 September 2016 diff hist 0 N File:751.5.1.4 file names.jpg current
- 08:54, 29 September 2016 diff hist +2,341 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, revised guidance for change orders to bridge plans
- 08:32, 29 September 2016 diff hist 0 N File:751.5.1.4 revising 2016.jpg current
- 13:54, 28 September 2016 diff hist +26 m Category:747 Bridge Reports and Layouts updated link
- 13:53, 28 September 2016 diff hist +44 m 751.1 Preliminary Design updated links
- 13:52, 28 September 2016 diff hist +22 m 751.1 Preliminary Design →751.1.1.5 New Regular Bridge Design Schedule (Nonseismic)
- 13:49, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 New Routine Bridge Design Schedule (Nonseismic)
- 13:49, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic): Per BR, minor clarification in subtitle
- 13:30, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)
- 13:29, 28 September 2016 diff hist 0 N File:751.1.1.5 Sept 28 2016.jpg current
- 13:29, 28 September 2016 diff hist +3 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic): Per BR, asthetically revised figure
- 08:51, 28 September 2016 diff hist 0 N File:751.1.1.5 Sept 2016.jpg current
- 08:51, 28 September 2016 diff hist +420 m 751.1 Preliminary Design Per BR, further revised the New Routine Design Schedule
- 08:19, 28 September 2016 diff hist +165 m Main Page EPG 751.36.2
- 08:18, 28 September 2016 diff hist +538 m 751.36 Driven Piles Per BR, clarified the cast in place pipe pile wall thicknesses commonly available.
- 14:58, 27 September 2016 diff hist 0 m Main Page
- 13:45, 27 September 2016 diff hist -8 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, removed underline in H2c1.10
- 09:31, 27 September 2016 diff hist -200 m Category:642 Pedestrian Facilities →Guidance Documents: per LPA, minor clarification
- 07:37, 27 September 2016 diff hist +3 m 751.14 Steel Superstructure →751.14.6.2 Girder Camber and Dead Load Deflection: minor correction
- 07:19, 27 September 2016 diff hist 0 N File:642 Questions.pdf current
- 07:19, 27 September 2016 diff hist +451 m Category:642 Pedestrian Facilities →Guidance Documents: Per EPG, added Q&A for DOJ/DOT Joint Technical Assistance on the Title II of the ADA Requirements
- 14:49, 23 September 2016 diff hist -7 m 236.8 Relocation Assistance Program
- 14:47, 23 September 2016 diff hist -5 m 236.8 Relocation Assistance Program
- 14:42, 23 September 2016 diff hist +5 m 236.8 Relocation Assistance Program Per RW, updated link
- 14:27, 23 September 2016 diff hist +11 m Category:138 Project Development Chronology Per EPG, updated title
- 14:26, 23 September 2016 diff hist +383 m Category:130 Value Engineering Per EPG, updated title
- 14:23, 23 September 2016 diff hist +55 m 104.13 Construction Inspection Guidance for Sec 104 Per EPG, revised title
- 14:20, 23 September 2016 diff hist +56 m Help Article Per EPG, revised title
- 13:53, 23 September 2016 diff hist 0 m Main Page
- 13:40, 23 September 2016 diff hist +334 Main Page
- 13:25, 23 September 2016 diff hist +766 m Category:130 Value Engineering →130.1 Discussion: Per EPG, updates reflect tracker identified goal and detail the new workbook available for district-led Value Analysis use.
- 12:04, 23 September 2016 diff hist -235 m Main Page EPG 751.1.1
- 11:29, 23 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)
- 11:28, 23 September 2016 diff hist 0 N File:751.1.1.5 2016.jpg current
- 11:27, 23 September 2016 diff hist +1,842 m 751.1 Preliminary Design Per BR, routine update to conform with internal Bridge Division current practice.
- 10:42, 23 September 2016 diff hist 0 m 751.6 General Quantities Per BR, minor correction
- 09:59, 23 September 2016 diff hist -208 m Main Page EPG 237.2.8, EPG 751.10;1;11
- 09:50, 23 September 2016 diff hist +187 m 237.2 Title Sheet →237.2.8 Utility Information Note: Per DE, relocated specifications to more reasonable locations
- 09:17, 23 September 2016 diff hist +35 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 09:12, 23 September 2016 diff hist +41 m 751.14 Steel Superstructure →751.14.6.2 Girder Camber and Dead Load Deflection: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 09:08, 23 September 2016 diff hist 0 m 751.10 General Superstructure →751.10.1.11 Slab Elevations
- 09:07, 23 September 2016 diff hist 0 N File:751.10.1.11 Typical Details.jpg current
- 09:06, 23 September 2016 diff hist -1,379 m 751.10 General Superstructure →751.10.1.11 Slab Elevations: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 14:42, 22 September 2016 diff hist +1 m 751.5 Structural Detailing Guidelines →751.5.4.4 Expansion Devices
- 14:35, 22 September 2016 diff hist -1 m 751.6 General Quantities Per BR, corrected pay item identification
- 14:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 54.pdf current
- 14:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 50.pdf current
- 14:29, 22 September 2016 diff hist +255 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Transportation Management Plan: Per CM, added two TMP examples
- 14:14, 22 September 2016 diff hist +68 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, clarification by boxing the guidance
- 12:36, 22 September 2016 diff hist -3 m Category:617 Traffic Barrier Per BR, minor correction
- 12:35, 22 September 2016 diff hist -3 m 611.3 Concrete Slope Protection →611.3.2 Construction Inspection (Sec 611.60.3): Per BR, minor correction
- 12:34, 22 September 2016 diff hist -3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.6 Barrier Wall Delineation: Per BR, minor correction
- 12:33, 22 September 2016 diff hist -3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.5 Guardrail Delineation: Per BR, minor correction
- 12:32, 22 September 2016 diff hist -3 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Per BR, minor correction
- 12:31, 22 September 2016 diff hist -24 m 751.50 Standard Detailing Notes Per BR, minor correction
- 10:53, 22 September 2016 diff hist -13 m Main Page EPG 109.1
- 10:32, 22 September 2016 diff hist +264 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, guidance about measuring quantities was clarified. Current guidance no longer exceeds the degree of accuracy requried by the specs or JSPs
- 09:35, 22 September 2016 diff hist -38,199 m 751.5 Structural Detailing Guidelines Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:31, 22 September 2016 diff hist -3,765 m 751.40 LFD Widening and Repair Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:22, 22 September 2016 diff hist 0 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 08:21, 22 September 2016 diff hist -560 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:19, 22 September 2016 diff hist -468 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.2 Vertical Drains: Per BR, replaced outdated details with links to the internet
- 08:14, 22 September 2016 diff hist +431 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.4 Exploded View of the End Bent: New EPG 751.34.3.5 (links to the internet in lieu of adding duplicate table)
- 08:12, 22 September 2016 diff hist -1,488 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:08, 22 September 2016 diff hist -4,294 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:06, 22 September 2016 diff hist -782 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (Top Mounted) TL-4 (NCHRP 350): Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:01, 22 September 2016 diff hist -3,379 m 751.10 General Superstructure Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:52, 22 September 2016 diff hist -1,483 m Category:503 Bridge Approach Slabs Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 13:02, 15 September 2016 diff hist 0 N File:Main Page September 15, 2016.jpg current
- 13:02, 15 September 2016 diff hist -184 m Main Page EPG 903
- 10:22, 15 September 2016 diff hist -40 m 153.9 Design CCO renumbered the contracts. New links needed.
- 09:27, 15 September 2016 diff hist +181 m 153.7 Construction and Materials CCO renumbered the contracts. New links needed.
- 09:08, 15 September 2016 diff hist -46 m 153.5 Bridge CCO renumbered the contracts. New links needed.
- 08:36, 15 September 2016 diff hist -1,027 m 903.3 Ground-Mounted Sign Supports Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 08:21, 15 September 2016 diff hist +741 m 903.2 Extent of Signing →903.2.12 Quantity Computations: Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 13:52, 14 September 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements
- 10:34, 14 September 2016 diff hist -199 m Main Page EPG 110.3
- 08:04, 14 September 2016 diff hist +397 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, guidance updated to comply with the e-Construction JSP.
- 07:20, 14 September 2016 diff hist +26 m 903.6 Warning Signs →903.6.33 LANE END Signs (W4-2, W9-1, W9-2) (MUTCD Section 2C.42): Per TS, clarification of the use of Lane Ends sign
- 11:29, 13 September 2016 diff hist +87 m Category:101 Standard Forms
- 11:28, 13 September 2016 diff hist +87 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 11:27, 13 September 2016 diff hist +87 m Category:101 Standard Forms →Construction and Materials: Per TS, updated WZ Inspection Form link
- 11:00, 13 September 2016 diff hist -2 m Main Page
- 10:24, 13 September 2016 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing
- 10:11, 13 September 2016 diff hist +54 m Category:101 Standard Forms Per TS, updated WZ Inspection Form links
- 10:10, 13 September 2016 diff hist +27 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 14:36, 9 September 2016 diff hist 0 m Main Page
- 14:44, 8 September 2016 diff hist 0 m Main Page
- 15:10, 7 September 2016 diff hist -211 m Category:747 Bridge Reports and Layouts →747.1.3.5 Valley/Channel Section Sheets: Per BR, rvision brings guidance into line with related changes previously completed in EPG 238.3.36.3.6.
- 15:07, 7 September 2016 diff hist -247 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per BR, irrelevant paragraph removed
- 13:19, 7 September 2016 diff hist +42 m 236.8 Relocation Assistance Program Per RW, updated link to Form 236.8.9.4.8, Replacement Housing Claim (Form 236.8.9.4(b))
- 12:57, 7 September 2016 diff hist 0 N File:Main Page September 7, 2016.jpg current
- 12:57, 7 September 2016 diff hist +65 m Main Page
- 07:24, 7 September 2016 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to Form 136.8.7.1.11
- 07:19, 7 September 2016 diff hist +35 m LPA:136.13 LPA Policy Changes
- 07:18, 7 September 2016 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 07:18, 7 September 2016 diff hist +35 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 11:25, 6 September 2016 diff hist +214 m LPA:136.13 LPA Policy Changes Form 136.8.7.1.11
- 11:22, 6 September 2016 diff hist -157 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 6 September 2016 diff hist +111 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.7.1.11
- 11:18, 6 September 2016 diff hist 0 N File:136.8.7.1.11.docx
- 11:17, 6 September 2016 diff hist +20 m LPA:136.8 Local Public Agency Land Acquisition
- 11:17, 6 September 2016 diff hist -197 m LPA:136.8 Local Public Agency Land Acquisition Per RW, the prorata tax form (7-22.2C) was updated to be only for the LPAs. It was also relabeled as Form 136.8.7.1.11.
- 10:56, 6 September 2016 diff hist +146 m Main Page EPG 131.1
- 10:08, 6 September 2016 diff hist -754 m 751.5 Structural Detailing Guidelines →751.5.8.1 Bridge Approach Slab: Per BR, deleted links to archaic drawings of Approach slabs.
- 08:21, 6 September 2016 diff hist +2,410 m 131.1 Design Exception Process Per EPG, federal rule has reduced controlling criteria to 10, reducing instances where fed approval is required for controlling criteria on federal involvement projects.
- 15:17, 2 September 2016 diff hist +1 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award
- 15:03, 2 September 2016 diff hist +4 m Main Page
- 14:23, 2 September 2016 diff hist 0 m LPA:136.13 LPA Policy Changes
- 14:22, 2 September 2016 diff hist +210 m LPA:136.13 LPA Policy Changes EPG 136.10.8
- 14:20, 2 September 2016 diff hist +5 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award: Per LPA, clarified the need for a performance/contract bond in the executed construction contract for LPA projects.
- 14:24, 31 August 2016 diff hist 0 N File:Main Page 2 August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist 0 N File:Main Page August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist +550 m Main Page
- 07:13, 31 August 2016 diff hist 0 m Category:407 Tack Coat →407.1.5 Method of Measurement (Sec 407.5): Per CM, minor correction. To round gallons to nearest gallon, not nearest 10 gallons current
- 07:48, 30 August 2016 diff hist 0 m Main Page
- 10:43, 29 August 2016 diff hist +10 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:41, 29 August 2016 diff hist 0 N File:751.13.6.3 squared 2016.jpg current
- 10:41, 29 August 2016 diff hist +204 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:23, 29 August 2016 diff hist 0 N File:751.13.6.3 skewed 2016.jpg current
- 10:23, 29 August 2016 diff hist +4 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 14:48, 26 August 2016 diff hist -13 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor correction
- 14:21, 26 August 2016 diff hist +30 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated links
- 13:41, 26 August 2016 diff hist +88 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints
- 12:18, 26 August 2016 diff hist -21 m Main Page EPG 907.1
- 12:17, 26 August 2016 diff hist -146 m 907.7 Highway Safety Manual →907.7.2 When is the Highway Safety Manual Used?: Per TS, removed archaic link
- 12:16, 26 August 2016 diff hist +691 907.1 Safety Program Guidelines Per TS, restructured and clarified existing content; new content for safety funds that was previously issued by TP in the most recent STIP Programming Guidance.
- 09:22, 26 August 2016 diff hist +123 m 127.7 Threatened and Endangered Species →127.7.6.4 District Responsibilities: link to JSP
- 09:02, 26 August 2016 diff hist 0 N File:127.7 Tumbling Creek Outflight.wmv current
- 09:02, 26 August 2016 diff hist +42 m 127.7 Threatened and Endangered Species →127.7.2 Process: video upload
- 08:56, 26 August 2016 diff hist +35 m 127.7 Threatened and Endangered Species →127.7.6.3 Process: minor clarification
- 11:19, 25 August 2016 diff hist -468 m Main Page EPG 127.7, EPG 703.2.7
- 11:02, 25 August 2016 diff hist +765 m Category:703 Concrete Masonry Construction →703.2.7 Machine Finishing: Per CM and BR, expanded and clarified guidance for the use of a vibratory screed
- 09:20, 25 August 2016 diff hist 0 N File:127.7.6.1.jpg current
- 09:20, 25 August 2016 diff hist 0 N File:127.7.2.jpg current
- 09:19, 25 August 2016 diff hist +10,965 127.7 Threatened and Endangered Species Per Env'l, updated text to match LPA EPG, clarified several practices, added info on migratory birds
- 14:58, 24 August 2016 diff hist -10 Main Page EPG 401, EPG 460, EPG 606.1, EPG 616.18, EPG 643.2, EPG 231.8, EPG 751.1,
- 14:54, 24 August 2016 diff hist +862 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling: Per CM, collection of a 3rd pt. can of binder as retained sample is appropriate procedure. If a 3rd party test is needed, it can be performed on retained sample
- 14:42, 24 August 2016 diff hist 0 m 236.7 Negotiation Per RW, updated Form 7.2.12
- 13:57, 24 August 2016 diff hist -139 Category:401 Bituminous Base and Pavement →401.2.3 Job Mix Formula (Sec 401.4): Per CM, guidance brought in line w/ current practice. Contractors allowed flexibility in the field to make bin adjustments provided the specs are satisfied
- 13:46, 24 August 2016 diff hist +326 Category:401 Bituminous Base and Pavement →401.2.8 Quality Assurance (Sec 401.9): Per CM, reflects updates to Sec 401. Includes revision to TSR verbiage, plant setting adjustments by contractor without prior approval, average core results
- 13:34, 24 August 2016 diff hist +344 606.1 Guardrail →606.1.3 Guardrail Systems: Per EPG, removed incidental grading for Type A end terminals so that a separate pay item could be included for prime contractors to bid on projects.
- 13:26, 24 August 2016 diff hist +107 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, Hydro Demolition updates
- 12:49, 24 August 2016 diff hist -2,024 m 643.2 Local Utility Adjustments - Public and Private Per DE, generally updated the article to reflect current practice
- 12:47, 24 August 2016 diff hist +16 m Category:747 Bridge Reports and Layouts →747.1.3.4.1 General Information for All Profile Sheets
- 12:46, 24 August 2016 diff hist +2 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations
- 12:39, 24 August 2016 diff hist +56 m Category:747 Bridge Reports and Layouts updated links
- 12:37, 24 August 2016 diff hist +56 m 751.5 Structural Detailing Guidelines updated links
- 12:36, 24 August 2016 diff hist +144 751.1 Preliminary Design →751.1.2.5 Vertical and Horizontal Clearance: Per BR, Criteria for minimum bridge width expanded in EPG 231.8 to include National Bridge Inventory rating system requirements for bridge width.
- 12:22, 24 August 2016 diff hist +3,549 231.8 Bridge Width Per BR, Criteria for minimum bridge width expanded to include National Bridge Inventory rating system requirements for bridge width
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 section BB.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 elevation.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 part plan.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.4 finger plate.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.4 part plan of slab.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.3 skewed.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.3 squared.jpg current
- 12:07, 24 August 2016 diff hist +1,742 751.13 Expansion Joint Systems →751.13.6 Finger Plate Expansion Devices: New EPG 751.13.4 shows slab extensions at ends of finger plate expansion devices & additional bars in extension. New barrier curb reinforcement guidance
- 11:20, 24 August 2016 diff hist -567 m 616.18 Construction Inspection Guidelines for Sec 616 →Lighting Requirements (for Sec 616.5): Per CM, deleted pay item 616.2010 WORK ZONE LIGHTING
- 15:05, 22 August 2016 diff hist +1 m Main Page
- 14:41, 19 August 2016 diff hist -42 m 236.8 Relocation Assistance Program Per RW, updated link to Replacement Housing Claim form
- 13:55, 19 August 2016 diff hist -1 m Main Page
- 13:55, 19 August 2016 diff hist +89 m Main Page EPG 110.3
- 12:56, 19 August 2016 diff hist 0 N File:110.3 letter 4.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 3.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 2.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 1.doc current
- 12:55, 19 August 2016 diff hist +1,461 m Category:110 State and Federal Wage Rates and Other Requirements →Application of Prevailing Wage off of the Worksite: Per CM, new guidance to address late final plans paperwork from contractor.
- 09:24, 18 August 2016 diff hist 0 m 903.6 Warning Signs →Table 903.6.3 Warning Sign and Plaque Sizes: Per TS, corrected the mistaken sizes of the W16-7P
- 08:01, 17 August 2016 diff hist -5 m 643.4 Railroads Per Multimodal, updated BNSF link
- 14:05, 16 August 2016 diff hist 0 N File:Main Page August 16, 2016.jpg current
- 14:05, 16 August 2016 diff hist +124 m Main Page
- 07:41, 16 August 2016 diff hist -73 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) updated link to Std Plan 616.10
- 14:37, 12 August 2016 diff hist +38 m Main Page EPG 134.3.4
- 14:24, 12 August 2016 diff hist +618 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: Per LPA, clarified that the majority of consultant contracts are actual cost plus fixed fee; added Lump Sum and Hourly Rate Contracts to the list of payment methods.
- 12:24, 12 August 2016 diff hist 0 N File:134.2.2 2016.pdf
- 12:24, 12 August 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2 Standard Consultant Contract Checklist. Added hyperlinks
- 11:08, 12 August 2016 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig 134.2.4 so that the hyperlinks were operational
- 10:45, 12 August 2016 diff hist +229 m Main Page EPG 134.2.4
- 10:38, 12 August 2016 diff hist 0 N File:134.2.4 2016.pdf
- 10:38, 12 August 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, Fig 134.2.4, MOU Checklist revised to clarify the steps of the MOU process to better align with EPG 134.2.4 guidance
- 10:37, 12 August 2016 diff hist +230 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, removed text where MOU's are "..for the quick delivery of
- 15:00, 11 August 2016 diff hist 0 N File:Main Page August 11, 2016.jpg current
- 14:59, 11 August 2016 diff hist -216 m Main Page
- 14:40, 11 August 2016 diff hist 0 m Main Page
- 08:16, 11 August 2016 diff hist +36 m 236.7 Negotiation Per RW, the Pro Rata Real Estate Tax Claim (Form 7-2.22C) replaced with: Prorata Real Est Tax Claim, Owner's Section (Form 7-2.22C) and D, MoDOT's section
- 07:58, 11 August 2016 diff hist 0 m 236.7 Negotiation
- 12:47, 10 August 2016 diff hist -2 m Main Page
- 09:01, 10 August 2016 diff hist +36 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: inserted link
- 08:16, 10 August 2016 diff hist -189 m 237.9 Submission of Plans and Supporting Documents Per Est. and Review, additional revision to the article to reflect current guidance on how to handle the confidential estimate information
- 13:37, 8 August 2016 diff hist -51 m 236.16 Outdoor Advertising →236.16.25 File Storage Process: Per RW, vegetation application deleted from retention list. It was not a required document
- 13:02, 8 August 2016 diff hist 0 N File:616.8.14a DECM 2014.pdf
- 13:02, 8 August 2016 diff hist 0 N File:616.8.14 DECM 2016.pdf current
- 13:02, 8 August 2016 diff hist 0 N File:616.8.13 DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10g DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10f DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10d DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10 DECM 2016.pdf current
- 12:59, 8 August 2016 diff hist +40 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 12:30, 8 August 2016 diff hist 0 N File:616.8 legend 2016.pdf current
- 12:30, 8 August 2016 diff hist +5 m Category:616 Temporary Traffic Control Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 12:26, 8 August 2016 diff hist -2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 07:23, 8 August 2016 diff hist -58 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS, updated Unit Pricing for Logo Work on MoDOT Constr Projects
- 07:22, 8 August 2016 diff hist 0 N File:616.18 Unit Price.pdf current
- 07:21, 8 August 2016 diff hist -2 m 903.11 Specific Service Signs - Logos Per TS, again updated Unit Pricing for Logo Work on MoDOT Constr Projects
- 08:36, 5 August 2016 diff hist 0 m Main Page
- 07:40, 5 August 2016 diff hist -1 m Help Article →EPG Approval Process
- 13:02, 4 August 2016 diff hist +10 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 13:01, 4 August 2016 diff hist -2 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 12:57, 4 August 2016 diff hist -241 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, reference to archaic Hazardous Matertials Reporting Procedures Training was removed
- 14:38, 3 August 2016 diff hist 0 m Main Page
- 10:39, 3 August 2016 diff hist +5 m 106.3.2.76 TM-76, Acid Insoluble Residue →106.3.2.76.7 Volumetric Determination of Percent Non-Carbonate Using Individual Fractions current
- 10:12, 3 August 2016 diff hist -13 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 10:08, 3 August 2016 diff hist +13 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 14:41, 2 August 2016 diff hist +3 m Main Page
- 13:37, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 10:08, 2 August 2016 diff hist -1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 10:07, 2 August 2016 diff hist -1 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing
- 10:07, 2 August 2016 diff hist +1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 09:57, 2 August 2016 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 09:56, 2 August 2016 diff hist -5 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 09:54, 2 August 2016 diff hist +64 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 09:51, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:50, 2 August 2016 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:47, 2 August 2016 diff hist -87 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:45, 2 August 2016 diff hist +338 m 237.9 Submission of Plans and Supporting Documents updated links, per Bids
- 09:34, 2 August 2016 diff hist -6 751.7 General Design Data current
- 14:04, 29 July 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 13:50, 29 July 2016 diff hist +65 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 13:41, 29 July 2016 diff hist -3 m Main Page EPG 237.9
- 12:59, 29 July 2016 diff hist +1 m Main Page
- 11:05, 29 July 2016 diff hist 0 N File:616.8.39a.pdf current
- 11:05, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 2 DECM 2016.pdf
- 11:04, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 1 DECM 2016.pdf
- 11:04, 29 July 2016 diff hist 0 N File:616.8.34 DECM 2016.pdf current
- 11:04, 29 July 2016 diff hist 0 N File:616.8.32 DECM 2016.pdf current
- 11:04, 29 July 2016 diff hist 0 N File:616.8.7b DECM 2016.pdf current
- 11:03, 29 July 2016 diff hist +133 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per Traffic, several minor updates to TAs. New TA 39A is a slightly updated Fig. 616.7 Standard Temporary Connection...
- 10:44, 29 July 2016 diff hist 0 N File:237.9.3.3.4.1.jpg current
- 10:43, 29 July 2016 diff hist 0 N File:237.9.6.jpg current
- 10:42, 29 July 2016 diff hist -4 m 237.14 Electronic Design Data Delivery (BIM Deliverables) updated links
- 10:41, 29 July 2016 diff hist -5 m Category:138 Project Development Chronology updated links
- 10:40, 29 July 2016 diff hist -34 m 103.1 Bid Opening and Award Process updated links
- 10:39, 29 July 2016 diff hist +6,185 m 237.9 Submission of Plans and Supporting Documents Per Est. and Review, generally revised the article to reflect current guidance for the submission of plans and supporting documents for eProjects
- 08:16, 29 July 2016 diff hist -2 237.9 Submission of Plans and Supporting Documents
- 12:22, 26 July 2016 diff hist 0 N File:Main Page July 26, 2016.jpg current
- 12:22, 26 July 2016 diff hist -444 m Main Page EPG 237.3.7.5
- 12:19, 26 July 2016 diff hist +199 m 236.3 Administration →Acquisition Authority and Project Funding for Design-Build Projects: Per RW, updated the Design Build Project A-Date process
- 10:47, 26 July 2016 diff hist +210 m 236.3 Administration →236.3.7.5 Distribution of Clearance Certification: Per RW, additional guidance on the distribution of ROW Clearance Certifications
- 15:15, 22 July 2016 diff hist +1 m Main Page
- 12:22, 22 July 2016 diff hist 0 m LPA:136.13 LPA Policy Changes
- 12:22, 22 July 2016 diff hist +184 m LPA:136.13 LPA Policy Changes Fig. 136.10.2
- 12:19, 22 July 2016 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.10.2
- 12:19, 22 July 2016 diff hist +10 m LPA:136.10 Advertisement for Bid and Project Award Per Est & Rev, minor revision to Fig. 136.10.2. Asterisks are no longer shown by items DBE will perform.
- 12:18, 22 July 2016 diff hist 0 N File:136.10.2 2016.doc current
- 11:21, 22 July 2016 diff hist +761 m Category:Shoulder Maintenance updated links
- 11:07, 22 July 2016 diff hist +19 m Category:613 Pavement Repair updated links
- 11:07, 22 July 2016 diff hist +48 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 11:02, 22 July 2016 diff hist +31 m Category:735 Culvert Pipe Liner updated link current
- 10:59, 22 July 2016 diff hist +45 m 606.2 Guard Cable →606.2.6 Maintenance Planning Guidelines for Guard Cable: updated link
- 10:53, 22 July 2016 diff hist +84 m 413.5 Crack Treatment in Bituminous Pavements updated links current
- 10:50, 22 July 2016 diff hist +202 m Category:622 Pavement and Bridge Surface Removal and Texturing updated links
- 10:45, 22 July 2016 diff hist +122 m 413.9 Fly Coating updated links current
- 10:33, 22 July 2016 diff hist +2 m 609.5 Maintenance Planning Guidelines for Repairing Paved Ditches and Slopes updated link current
- 10:32, 22 July 2016 diff hist +17 m 609.6 Maintenance Planning Guidelines for Repairing Curbs updated links current
- 10:30, 22 July 2016 diff hist -10 m 614.4 Maintenance Planning Guidelines for Drop Inlets and Storm Sewers updated link current
- 10:27, 22 July 2016 diff hist 0 m 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers current
- 10:27, 22 July 2016 diff hist +76 m 617.5 Maintenance Planning Guidelines for Concrete Traffic Barriers updated links
- 10:24, 22 July 2016 diff hist +4 m 609.4 Maintenance Planning Guidelines for Cleaning and Reshaping Paved Ditches updated link current
- 10:22, 22 July 2016 diff hist +1 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:21, 22 July 2016 diff hist +51 m 607.4 Maintenance Planning Guidelines for Fences updated link current
- 10:18, 22 July 2016 diff hist +55 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:16, 22 July 2016 diff hist +25 m 824.1 Maintenance Planning Guidelines for Litter Pick-Up updated link current
- 10:16, 22 July 2016 diff hist +37 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:13, 22 July 2016 diff hist +25 m 822.8 Maintenance Planning Guidelines for Brush Cutting updated link
- 10:12, 22 July 2016 diff hist +30 m 822.7 Maintenance Planning Guidelines for Mowing Operations updated link
- 10:11, 22 July 2016 diff hist +85 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:09, 22 July 2016 diff hist +25 m 821.26 Maintenance Planning Guidelines for Chemical Weed Control updated link current
- 10:08, 22 July 2016 diff hist +44 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:07, 22 July 2016 diff hist +25 m Category:808 Planting Trees, Shrubs, and Other Plants →808.2 Maintenance Planning Guidelines for Landscaping: updated link
- 10:06, 22 July 2016 diff hist +34 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 10:01, 22 July 2016 diff hist +53 m Category:625 Slab Stabilization updated link
- 09:58, 22 July 2016 diff hist +86 m 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance updated links
- 09:57, 22 July 2016 diff hist +48 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 09:55, 22 July 2016 diff hist +4 m 570.5 Mudjacking (Slab Jacking) by MoDOT Maintenance
- 09:54, 22 July 2016 diff hist +1 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 09:53, 22 July 2016 diff hist -4 m 570.2 Joint and Crack Maintenance
- 09:52, 22 July 2016 diff hist +82 m 570.2 Joint and Crack Maintenance updated links
- 09:30, 22 July 2016 diff hist +283 m Category:470 Bituminous Asphalt Maintenance updated links current
- 08:44, 22 July 2016 diff hist +88 m Category:170 Maintenance Activity Planning Guidelines →Index of Printable Planning Guides
- 08:37, 22 July 2016 diff hist -5 m 171.12 Maintenance Policy History →BRG(A1) Utility Attachments to Bridges
- 08:27, 22 July 2016 diff hist 0 m Category:774 Cathodic Protection →774.5.2 Routine Cathodic System Evaluation: Section A: updated link
- 08:24, 22 July 2016 diff hist +45 m 771.19 Chip Seal to Entire Deck updated link
- 08:24, 22 July 2016 diff hist +57 m 771.18 In-Deck Bridge Deck Crack Filler →Materials: updated link
- 08:23, 22 July 2016 diff hist +57 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) →Health, Environment & Guidance: updated link
- 08:22, 22 July 2016 diff hist +52 m 771.16 Penetrating Concrete Sealer - Silane →Health, Environment and Guidance: updated link
- 08:21, 22 July 2016 diff hist +54 m Category:170 Maintenance Activity Planning Guidelines