User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:52, 5 December 2016 diff hist +774 751.1 Preliminary Design Per BR, clarified form liner requirements for large block wall.
- 08:39, 5 December 2016 diff hist +1,400 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, clarified form liner requirements for large block wall.
- 15:48, 23 November 2016 diff hist 0 N File:123.1.1 Podi list 2016.xlsm
- 15:48, 23 November 2016 diff hist -437 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated PODI list
- 15:46, 23 November 2016 diff hist -428 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding, updated PODI list
- 15:43, 23 November 2016 diff hist -414 m Category:101 Standard Forms Per Bidding, updated D-12 link
- 15:42, 23 November 2016 diff hist -414 m 643.2 Local Utility Adjustments - Public and Private Per Bidding, updated D-12 link
- 15:41, 23 November 2016 diff hist 0 N File:237.9 D-12.docx
- 15:41, 23 November 2016 diff hist -828 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding, updated D-12 link
- 15:39, 23 November 2016 diff hist -828 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated D-12 link
- 10:53, 23 November 2016 diff hist -39 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, corrected (6) to remove a reference to avoiding angled hairpins for CIP decks
- 10:49, 23 November 2016 diff hist +29 m Main Page
- 09:09, 23 November 2016 diff hist -1 m 236.4 Description Writing and Titles →236.4.4.5 Agreements Between Commission and Abstractor or Title Companies: Per RW, provided clarification for Title Services Agreements
- 09:00, 23 November 2016 diff hist +1,009 m Category:142 Missouri One Call System Per Geotechnical, updated to fit current dig-rite rules, regulations and procedures
- 08:08, 23 November 2016 diff hist +35 m 127.1 Request for Environmental Services updated link
- 14:32, 22 November 2016 diff hist +2 m Main Page
- 14:31, 22 November 2016 diff hist -149 m Main Page EPG 751.50
- 14:28, 22 November 2016 diff hist +279 m 751.50 Standard Detailing Notes →J1. General: Per BR, clarified responsibility of MSE wall designer/manufacturer to show range of acceptable ɵ angle for slope excavation line on drawings to be consistent w/ design computations
- 13:58, 22 November 2016 diff hist -77 m Main Page EPG 751.10, EPG 751.22
- 13:29, 22 November 2016 diff hist -19 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): updated link
- 11:21, 22 November 2016 diff hist +2,566 m 751.22 Prestressed Concrete I Girders Per BR, updated guidance for shear reinforcement to current practice and preferences of manufacturers and reinforcement suppliers. A1 reinforcement will not use WWR located in the flange of NU girders
- 10:05, 22 November 2016 diff hist -2 m Category:700 STRUCTURES AND HYDRAULICS
- 10:05, 22 November 2016 diff hist +2,215 Nm Category:771 Bridge Preventive Maintenance Guidelines Per BR, EPG 771's "Preventative" updated to "Preventive". EPG 771 was originally set up Dec 21, 2007. There were absolutely no changes to this page since 2007. current
- 09:58, 22 November 2016 diff hist -2 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking)
- 09:58, 22 November 2016 diff hist -2 m 771.2 Bridge Cleaning and Flushing
- 09:58, 22 November 2016 diff hist -2 m 771.3 Shaving Shoulder and Around Guardrail current
- 09:57, 22 November 2016 diff hist -2 m 771.4 Drain Basin Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.5 Mat Gutter Maintenance current
- 09:57, 22 November 2016 diff hist -2 m 771.6 Channel Work - Gabion Installation current
- 09:56, 22 November 2016 diff hist -2 m 771.7 Channel Work - Rock Blanket current
- 09:56, 22 November 2016 diff hist -2 m 771.8 Remove Drift current
- 09:56, 22 November 2016 diff hist -2 m 771.9 Temporary Bridge Deck Repair
- 09:55, 22 November 2016 diff hist -2 m 771.10 Bridge Joint Sealing - Hot Pour current
- 09:55, 22 November 2016 diff hist -2 m 771.11 Bridge Joint Sealing - Silicone
- 09:54, 22 November 2016 diff hist -2 m 771.12 Bridge Joint Sealing - Polytite current
- 09:54, 22 November 2016 diff hist -2 m 771.13 Sealing Abutment and Pier Caps current
- 09:54, 22 November 2016 diff hist -2 m 771.14 Spot Painting of Bearings and Piling
- 09:53, 22 November 2016 diff hist -2 m 771.15 Concrete Bridge Deck Sealer Selection Matrix current
- 09:53, 22 November 2016 diff hist -2 m 771.16 Penetrating Concrete Sealer - Silane current
- 09:52, 22 November 2016 diff hist -2 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) current
- 09:52, 22 November 2016 diff hist -2 m 771.18 In-Deck Bridge Deck Crack Filler current
- 09:51, 22 November 2016 diff hist -2 m 771.19 Chip Seal to Entire Deck
- 09:50, 22 November 2016 diff hist -2 m 771.20 Cut and Spray Brush and Vines current
- 09:50, 22 November 2016 diff hist -2 m 771.21 Rainy Day Bridge Activities current
- 09:24, 22 November 2016 diff hist -290 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per BR, clarified hairpin guidance
- 09:17, 22 November 2016 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 09:16, 22 November 2016 diff hist +177 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, hairpin guidance clarified
- 09:11, 22 November 2016 diff hist 0 N File:751.14.4.5.jpg current
- 09:09, 22 November 2016 diff hist -34 m 751.5 Structural Detailing Guidelines updated link
- 09:07, 22 November 2016 diff hist +12 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement
- 09:05, 22 November 2016 diff hist 0 N File:751.10.1.14 shape 10.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 example.jpg current
- 09:04, 22 November 2016 diff hist 0 N File:751.10.1.14 part section.jpg current
- 09:04, 22 November 2016 diff hist +2,248 m 751.10 General Superstructure Per BR, expanded and clarified hairpin guidance especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
- 08:31, 22 November 2016 diff hist +28 m 751.5 Structural Detailing Guidelines updated link
- 16:14, 21 November 2016 diff hist +1 m Main Page
- 13:43, 21 November 2016 diff hist -94 m 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Notes: Per BR, further clarified revision from 7/10/14 about mechanical bar splices
- 13:42, 21 November 2016 diff hist +118 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per BR, further clarified revision from 7/10/14 about mechanical bar splices by updating MBS example figure
- 16:05, 18 November 2016 diff hist 0 m Main Page
- 14:17, 18 November 2016 diff hist 0 N File:751.5.9.2.8 example.pdf
- 14:17, 18 November 2016 diff hist -22 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Updated Mechanical Bar Splice Ex. figure
- 14:12, 18 November 2016 diff hist +147 m 751.6 General Quantities Per Bridge, clarified revision from 7/10/14 about mechanical bar splices.
- 14:10, 18 November 2016 diff hist -660 m 751.50 Standard Detailing Notes Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Note B1.9.7 removed.
- 11:23, 18 November 2016 diff hist 0 m 103.1 Bid Opening and Award Process Per DE, updated due dates chart link
- 11:21, 18 November 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per DE, updated due dates chart link
- 08:54, 18 November 2016 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.10 Cold Weather Placement: Per CM, revised to conform with the specs.
- 08:14, 18 November 2016 diff hist -172 m 236.4 Description Writing and Titles Per RW, removed archaic RW43, Request for Proposals - Title Company Services (Form 4-4.5b)
- 15:29, 17 November 2016 diff hist +178 LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:28, 17 November 2016 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 15:27, 17 November 2016 diff hist 0 N File:136.9.3 2016.docx
- 15:27, 17 November 2016 diff hist +7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, updated Fig. 136.9.3 to reflect the current versions of specs and standard plans
- 09:22, 17 November 2016 diff hist 0 N File:134.2.4 Nov 17 2016.docx
- 09:21, 17 November 2016 diff hist +9 m Category:134 Engineering Professional Services Fig. 134.2.4, minor update
- 08:49, 17 November 2016 diff hist 0 N File:134.2.4 Nov 2016.docx
- 08:48, 17 November 2016 diff hist +3 m Category:134 Engineering Professional Services Per LPA, revised Fig 134.2.4. Added #5 in the fig that was accidentally deleted during the last revision.
- 11:35, 16 November 2016 diff hist +254 m Category:153 Agreements and Contracts Per RW, updated links and minor changes to wording
- 13:49, 15 November 2016 diff hist 0 m Main Page
- 12:09, 15 November 2016 diff hist +3 m Help Article
- 12:05, 15 November 2016 diff hist +1 m Help Article →EPG Approval Process
- 10:25, 15 November 2016 diff hist -143 m 771.16 Penetrating Concrete Sealer - Silane →Materials: Per EPG, removed reference to archaic Penetrating Concrete Sealer JSP (which was a BSP)
- 09:55, 15 November 2016 diff hist +41 m 153.21 Traffic Per TR, updated link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement
- 09:53, 15 November 2016 diff hist -1 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:52, 15 November 2016 diff hist -9 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 09:51, 15 November 2016 diff hist -322 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others: Per TR, replaced TR-15A link with link to CCO’s sharepoint site for TR-32, Supplemental Signing Agreement.
- 09:47, 15 November 2016 diff hist +178 m Category:903 Highway Signing Per TR, replaced TR 15A with a link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement.
- 08:37, 15 November 2016 diff hist -576 m 153.21 Traffic Per Commissioner's Secr. deleted TR08-A since it is now TR3
- 16:02, 14 November 2016 diff hist -46 m 153.21 Traffic Per Commissioneer's Secr, removed two archaic agreements and added two new ones
- 14:55, 14 November 2016 diff hist 0 N File:Fig. 806.8.1 2016.docx current
- 14:54, 14 November 2016 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Storm Water Compliance Coord'r, minor updated for Fig. 806.8.1 MoDOT/Contractor Responsibility
- 09:48, 14 November 2016 diff hist +34 m 236.3 Administration Per Env'l, updated RES link
- 09:46, 14 November 2016 diff hist +34 Category:101 Standard Forms →Environmental and Cultural: Per Env
- 09:44, 14 November 2016 diff hist +34 m Category:128 Conceptual Studies Per Env'l, updated RES link
- 09:35, 14 November 2016 diff hist +68 m 127.1 Request for Environmental Services Per Env'l, updated RES link
- 14:41, 10 November 2016 diff hist +209 m Main Page EPG 127
- 14:09, 10 November 2016 diff hist -788 127.9 Floodplain Management Per Env'l, updated to reflect new processes and forms
- 13:47, 10 November 2016 diff hist -14 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated links
- 13:45, 10 November 2016 diff hist 0 N File:127.11 SCS CPA.pdf
- 13:45, 10 November 2016 diff hist 0 N File:127.11 AD 1006.pdf
- 13:45, 10 November 2016 diff hist -30 m 127.11 Farmland Conversion updated links
- 12:14, 10 November 2016 diff hist -2,133 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties →127.21.2 Project Development Milestones: Per Env'l, updated to reflect new processes and forms current
- 12:02, 10 November 2016 diff hist 0 m 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article
- 12:02, 10 November 2016 diff hist +87 N 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties 127.21 Federal Emergency Management Agency (FEMA) Buyout Properties moved to 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties: Per Env'l, slightly re-titled the article current
- 12:00, 10 November 2016 diff hist +6 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated link
- 11:59, 10 November 2016 diff hist +6 m Category:128 Conceptual Studies updated link
- 11:58, 10 November 2016 diff hist +574 127.11 Farmland Conversion Per Env'l, updated to reflect new processes and forms
- 11:00, 10 November 2016 diff hist -1,856 Category:1053 Concrete Sealer Per EPG, to conform with new Sec title current
- 10:53, 10 November 2016 diff hist +85 m Category:1000 MATERIALS retitled EPG 1053
- 10:52, 10 November 2016 diff hist +2,259 N Category:1053 Concrete Sealer and Concrete Crack Filler Per EPG, retitled EPG 1053 Concrete Sealer to this new title to conform with retitled sec
- 10:50, 10 November 2016 diff hist +52 m Where to Find Construction and Materials Functions updated link
- 10:06, 10 November 2016 diff hist -41 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 10:05, 10 November 2016 diff hist 0 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article
- 10:05, 10 November 2016 diff hist +72 N 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP): Per MT and CM, re-titled article current
- 10:05, 10 November 2016 diff hist +1 m Category:170 Maintenance Activity Planning Guidelines
- 10:04, 10 November 2016 diff hist +1 m 770.1 District Routine Maintenance and Special Crew Responsibilities current
- 10:00, 10 November 2016 diff hist +10 m Category:170 Maintenance Activity Planning Guidelines updated link
- 09:58, 10 November 2016 diff hist +5 m 770.1 District Routine Maintenance and Special Crew Responsibilities updated link
- 09:57, 10 November 2016 diff hist -4 m 771.15 Concrete Bridge Deck Sealer Selection Matrix updated link
- 09:54, 10 November 2016 diff hist +32 771.16 Penetrating Concrete Sealer - Silane →Materials: Per MT and CM, added a materials specification for Concrete Crack Filler
- 09:33, 10 November 2016 diff hist +200 m Category:717 Neoprene and Silicone Joint Systems delted old article current
- 09:32, 10 November 2016 diff hist +65 m Category:700 STRUCTURES AND HYDRAULICS Re-titled EPG 717
- 09:31, 10 November 2016 diff hist +182 Nm Category:717 Flexible Joint Systems Per EPG, new article to conform with Sec 717's new title. No change in guidance from old EPG 717 Neoprene and Silcone Joint Systems current
- 15:18, 9 November 2016 diff hist -433 m 236.6 Appraisal and Appraisal Review updated 49 CFR 24.103 link
- 15:14, 9 November 2016 diff hist 0 N File:806.8 EC Pre Con.pdf current
- 15:13, 9 November 2016 diff hist 0 N File:806.8 SW Database and Checklist.pdf
- 15:13, 9 November 2016 diff hist +208 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP)
- 14:19, 9 November 2016 diff hist -9 m Main Page
- 14:19, 9 November 2016 diff hist -9 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 14:17, 9 November 2016 diff hist -68 m Main Page EPG 101, EPG 236.6
- 11:47, 9 November 2016 diff hist -4 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Inspection QRG.pdf
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Initial Setup QRG.pdf
- 11:46, 9 November 2016 diff hist 0 N File:101 Land Disturbance Deficiency QRG.pdf
- 11:45, 9 November 2016 diff hist +173 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Storm Water Compliance Coord'r, replaced the Land Disturbance Proj Info QRG with three new Land Disturbance QRGs.
- 11:07, 9 November 2016 diff hist -2,137 m 236.6 Appraisal and Appraisal Review →236.6.2 Scope of Assignment: Per RW, updated to reflect current practices. Removed "Scope of Assignment for Simple Assignment or Experienced Staff and Fee".
- 15:15, 8 November 2016 diff hist 0 m 106.16 Special Designs and Shop Drawings 106.16 Special Designs moved to 106.16 Special Designs and Shop Drawings: at request of Bridge
- 15:15, 8 November 2016 diff hist +54 N 106.16 Special Designs 106.16 Special Designs moved to 106.16 Special Designs and Shop Drawings: at request of Bridge current
- 14:18, 8 November 2016 diff hist -61 m Main Page EPG 106.16
- 13:58, 8 November 2016 diff hist +2,973 m 106.16 Special Designs and Shop Drawings Per CM and BR, expanded guidance for handling drawings from suppliers
- 13:19, 4 November 2016 diff hist 0 m Main Page
- 08:25, 4 November 2016 diff hist -11 m 949.2 Speed Limit Guidelines Per RW, updated TMS link
- 08:21, 4 November 2016 diff hist -11 m Category:145 Transportation Management Systems (TMS) Per RW, updated TMS link
- 08:20, 4 November 2016 diff hist -11 m 236.16 Outdoor Advertising Per RW, updated TMS link
- 12:24, 3 November 2016 diff hist -2 m Category:108 Prosecution and Progress →Example 4: Per CM, corrected date in Example 4
- 07:17, 3 November 2016 diff hist +2 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.1 Introduction
- 10:06, 2 November 2016 diff hist -5 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes
- 09:25, 2 November 2016 diff hist 0 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes: Per TS, corrected sizes of EMERGENCY SIGNAL sign
- 14:44, 1 November 2016 diff hist 0 N File:Main Page 2 November 1, 2016.jpg current
- 14:43, 1 November 2016 diff hist 0 N File:Main Page November 1, 2016.jpg current
- 14:43, 1 November 2016 diff hist +69 m Main Page
- 11:02, 1 November 2016 diff hist -283 m Main Page EPG 643.2.16.1, EPG 616.16, EPG 236.4.4
- 10:23, 1 November 2016 diff hist 0 m 643.2 Local Utility Adjustments - Public and Private →643.2.16.1 Buy America Guidelines for Utilities: Per DE and FHWA, the steel industry won against the federal stance on Buy America. We will use the older, more relaxed, FHWA interpretation of BA
- 09:17, 1 November 2016 diff hist 0 m 236.4 Description Writing and Titles →236.4.4.2 Title Information - Phase I
- 09:15, 1 November 2016 diff hist -247 m 236.4 Description Writing and Titles →236.4.4 Title Datum and Allied Services: Per RW, updated the agreements between Commission and abstractor or title companies to be current with business is conducted
- 08:40, 1 November 2016 diff hist -14 m 616.16 Law Enforcement Services Per CM and TS, additional guidance for incorporating law enforcement to contractor projects and maintenance operation work zones.
- 07:18, 1 November 2016 diff hist -49 m Category:101 Standard Forms →Environmental and Cultural: Per Env'l, updated Instructions for the RES Form.
- 07:16, 1 November 2016 diff hist 0 N File:127.1 Instructions for the RES Form.docx
- 07:16, 1 November 2016 diff hist -49 m 127.1 Request for Environmental Services Per Env'l, updated Instructions for the RES Form.
- 12:14, 31 October 2016 diff hist 0 m Main Page
- 13:33, 28 October 2016 diff hist 0 N File:134.5.1.3 2016.xlsx current
- 13:32, 28 October 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, added a section to Fig. 134.5.1.3 for workforce diversity reporting requirements
- 12:22, 28 October 2016 diff hist -2 m Category:101 Standard Forms →Construction and Materials: updated CM form links
- 08:24, 27 October 2016 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy →616.14.5 Tracking Measures
- 08:24, 27 October 2016 diff hist 0 N File:616.14.5.jpg current
- 08:24, 27 October 2016 diff hist -7 m 616.14 Work Zone Safety and Mobility Policy →616.14.5 Tracking Measures
- 10:13, 26 October 2016 diff hist +28 m Main Page
- 09:59, 26 October 2016 diff hist -355 m Main Page EPG 153
- 09:31, 26 October 2016 diff hist 0 N File:153 Agreements Process 2016.doc current
- 09:30, 26 October 2016 diff hist +871 m Category:153 Agreements and Contracts Per TP, revised guidance due to implementation of eAgreements
- 10:30, 25 October 2016 diff hist +1 m Main Page
- 10:29, 25 October 2016 diff hist +78 m Main Page EPG 751.50
- 10:28, 25 October 2016 diff hist +344 m 751.50 Standard Detailing Notes →I1. General: Per BR, clarified cleaning and coating in accordance with Sec 1080 in note I1.51.
- 07:15, 25 October 2016 diff hist +1 m Main Page
- 07:14, 25 October 2016 diff hist -134 m Main Page EPG 751.50
- 07:11, 25 October 2016 diff hist -276 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, deleted last sentence of H3.29.1 and H3.49.1 because this criteria is already covered in Notes H3.26 and H3.46 respectively.
- 10:44, 24 October 2016 diff hist +1 m 616.8 Typical Applications (MUTCD 6H)
- 10:44, 24 October 2016 diff hist 0 N File:616.8.42 DECM 2016.pdf current
- 10:44, 24 October 2016 diff hist 0 N File:616.8.23 MT 2016.pdf
- 10:43, 24 October 2016 diff hist 0 N File:616.8.12a MT 2016.pdf current
- 10:43, 24 October 2016 diff hist 0 N File:616.8.12 MT 2016.pdf current
- 10:43, 24 October 2016 diff hist 0 N File:616.8.11 MT 2016.pdf current
- 10:42, 24 October 2016 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, minor revisions for several TAs. In TA 11MT, 12MT and 12aMT, "should" is replaced with "may" to be consistent with MUTCD.
- 09:30, 24 October 2016 diff hist -19 m Main Page
- 09:28, 24 October 2016 diff hist +63 m Main Page
- 09:26, 24 October 2016 diff hist 0 N File:Main Page October 24, 2016.jpg current
- 09:25, 24 October 2016 diff hist -105 m Main Page
- 10:51, 21 October 2016 diff hist +1 m Main Page
- 07:13, 21 October 2016 diff hist +3 m 943.3 AASHTO Policy on Route Marking and Application Updated link to US Route Numbering - Electronic Application Form
- 11:23, 20 October 2016 diff hist +4 m LPA:136.13 LPA Policy Changes
- 11:22, 20 October 2016 diff hist +382 m LPA:136.13 LPA Policy Changes EPG 136.6.2
- 11:19, 20 October 2016 diff hist +172 m LPA:136.6 Environmental and Cultural Requirements Per LPA, added clarifying sentence to help LPAs find info in Fig. 136.6.4
- 10:16, 20 October 2016 diff hist -1 m Category:101 Standard Forms →Construction and Materials: corrected a link
- 08:52, 20 October 2016 diff hist +5 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link to Pile Driving Data
- 14:28, 19 October 2016 diff hist 0 N File:103.1 award letter.docx
- 14:27, 19 October 2016 diff hist +8 m 103.1 Bid Opening and Award Process Per Bidding and Contracts, updated award letter form
- 14:20, 19 October 2016 diff hist -272 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, deleted two archaic QRGs.
- 09:23, 19 October 2016 diff hist +9 m Category:101 Standard Forms Per Bidding and Contracts, clarification of form
- 10:42, 18 October 2016 diff hist 0 N File:Main Page October 18, 2016.jpg current
- 10:42, 18 October 2016 diff hist +108 m Main Page
- 10:03, 18 October 2016 diff hist 0 m Main Page
- 12:44, 17 October 2016 diff hist 0 N File:616.14 WZ Questions 2016.docx
- 12:44, 17 October 2016 diff hist -28 m 616.14 Work Zone Safety and Mobility Policy Per CM, updated WZ Questions for the Core Team form
- 15:18, 14 October 2016 diff hist +129 m Category:101 Standard Forms →Design Forms: Per EPG, updated JSP forms
- 14:35, 14 October 2016 diff hist 0 m Main Page
- 09:04, 14 October 2016 diff hist +31 m Category:101 Standard Forms →Construction and Materials
- 08:55, 14 October 2016 diff hist +30 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 07:09, 13 October 2016 diff hist +19 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.16 On the Job Training (OJT) (23 CFR Section 230): Per ECR, minor clarification
- 13:46, 11 October 2016 diff hist +838 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, further clarification for verification that contractors comply with the law on subsistence deductions from employee paycheck
- 13:02, 11 October 2016 diff hist -9 m Main Page
- 13:00, 11 October 2016 diff hist +2 m Main Page
- 12:58, 11 October 2016 diff hist 0 N File:Main Page 2 October 11, 2016.jpg current
- 12:58, 11 October 2016 diff hist 0 N File:Main Page October 11, 2016.jpg current
- 12:57, 11 October 2016 diff hist +307 m Main Page
- 14:35, 7 October 2016 diff hist 0 m Main Page
- 10:52, 7 October 2016 diff hist +180 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated links to two QRGs
- 10:50, 7 October 2016 diff hist +468 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, added links to forms
- 10:46, 7 October 2016 diff hist -12 m Category:101 Standard Forms →Construction and Materials
- 10:41, 7 October 2016 diff hist +641 m Category:101 Standard Forms →Construction and Materials: Per CM, added new links to forms
- 10:35, 7 October 2016 diff hist +3,061 m Category:101 Standard Forms →Construction and Materials: Per CM, added new links for forms
- 10:05, 7 October 2016 diff hist +171 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Peer CM, updated links
- 09:35, 7 October 2016 diff hist +482 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated links
- 09:16, 7 October 2016 diff hist +139 m Category:101 Standard Forms →Materials Related: Per CM, updatedlinks
- 09:09, 7 October 2016 diff hist -2 m Category:101 Standard Forms →Construction and Contractor Related
- 09:06, 7 October 2016 diff hist -202 m Category:101 Standard Forms →Forms for Contractor Use: Per CM, updated links
- 08:51, 7 October 2016 diff hist -318 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 08:27, 7 October 2016 diff hist -1,041 m Category:101 Standard Forms →Construction and Materials: Per CM, updated links
- 12:43, 6 October 2016 diff hist -13 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details: Per BR, minor correction
- 08:18, 6 October 2016 diff hist -117 m Category:101 Standard Forms →Materials Related: Per CM, removed archaic Aggregate Quality Control Plan.
- 08:11, 6 October 2016 diff hist -8 m LPA:136.13 LPA Policy Changes
- 08:09, 6 October 2016 diff hist +304 m LPA:136.13 LPA Policy Changes EPG 136.8.4.1.1.10.1
- 08:06, 6 October 2016 diff hist -292 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per LPA, removed federal wage rate language to stay current with federal regulations
- 07:53, 6 October 2016 diff hist +205 m LPA:136.13 LPA Policy Changes Removed Fig. 136.6.4
- 07:52, 6 October 2016 diff hist -77 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, Fig. 136.6.4 LPA Request for Environmental Review (RER) was eliminated and replaced with a link to the new RER
- 07:47, 6 October 2016 diff hist +51 m LPA:136.3 Federal Aid Basics →136.3.8 Programs: Per LPA, Fig. 136.6.4 LPA Request for Environmental Review (RER) was eliminated and replaced with a link to the new RER
- 10:51, 4 October 2016 diff hist -10 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others
- 10:50, 4 October 2016 diff hist 0 N File:127.25.2.1 Hazardous.docx
- 10:50, 4 October 2016 diff hist -83 m 127.25 Maintenance Environmental Policies →127.25.2.1 Hazardous Material Spills (Roadway) by Others: Per Env'l, updated Hazardous Materials Response Plan document
- 08:29, 4 October 2016 diff hist -432 m Main Page
- 14:30, 3 October 2016 diff hist -1 m Main Page
- 11:30, 3 October 2016 diff hist -9 m 236.13 Designing Right of Way Plans Per RW, "How to Use the DGN Merger" updated to provide better results of dgn/cadd files for Spatial Editor
- 07:12, 3 October 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents updated PS&E table links
- 07:10, 3 October 2016 diff hist 0 m 103.1 Bid Opening and Award Process
- 12:38, 30 September 2016 diff hist -134 m 751.50 Standard Detailing Notes →H1. Steel
- 12:24, 30 September 2016 diff hist +12 m 751.50 Standard Detailing Notes →J1. General: Per BR, added a subscript "r" as necessary
- 09:15, 30 September 2016 diff hist +49 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, clarified Note H2c2.2
- 09:08, 30 September 2016 diff hist +862 m 751.50 Standard Detailing Notes Per BR, corrected and clarified Notes B3.22 and H1.42. New Note H1.43.
- 15:25, 29 September 2016 diff hist +4 m Main Page
- 14:52, 29 September 2016 diff hist -26 m Main Page EPG 236.5
- 14:35, 29 September 2016 diff hist -103 m 236.5 Property Management →236.5.21.5 Full Disclosure Clause: Per RW, the full disclosure clause updated to reflect how MoDOT currently handles property conveyances.
- 14:27, 29 September 2016 diff hist -27 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, provided different link for the change order template
- 13:58, 29 September 2016 diff hist +198 m 238.2 Land Surveying Per RW, updated Form A-472
- 09:05, 29 September 2016 diff hist -5 m Main Page EPG 751.5.1.4
- 08:56, 29 September 2016 diff hist 0 N File:751.5.1.4 adding 2016.jpg current
- 08:55, 29 September 2016 diff hist 0 N File:751.5.1.4 deleting 2016.jpg current
- 08:55, 29 September 2016 diff hist 0 N File:751.5.1.4 file names.jpg current
- 08:54, 29 September 2016 diff hist +2,341 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, revised guidance for change orders to bridge plans
- 08:32, 29 September 2016 diff hist 0 N File:751.5.1.4 revising 2016.jpg current
- 13:54, 28 September 2016 diff hist +26 m Category:747 Bridge Reports and Layouts updated link
- 13:53, 28 September 2016 diff hist +44 m 751.1 Preliminary Design updated links
- 13:52, 28 September 2016 diff hist +22 m 751.1 Preliminary Design →751.1.1.5 New Regular Bridge Design Schedule (Nonseismic)
- 13:49, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 New Routine Bridge Design Schedule (Nonseismic)
- 13:49, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic): Per BR, minor clarification in subtitle
- 13:30, 28 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)
- 13:29, 28 September 2016 diff hist 0 N File:751.1.1.5 Sept 28 2016.jpg current
- 13:29, 28 September 2016 diff hist +3 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic): Per BR, asthetically revised figure
- 08:51, 28 September 2016 diff hist 0 N File:751.1.1.5 Sept 2016.jpg current
- 08:51, 28 September 2016 diff hist +420 m 751.1 Preliminary Design Per BR, further revised the New Routine Design Schedule
- 08:19, 28 September 2016 diff hist +165 m Main Page EPG 751.36.2
- 08:18, 28 September 2016 diff hist +538 m 751.36 Driven Piles Per BR, clarified the cast in place pipe pile wall thicknesses commonly available.
- 14:58, 27 September 2016 diff hist 0 m Main Page
- 13:45, 27 September 2016 diff hist -8 m 751.50 Standard Detailing Notes →H2c. Prestressed Girders and Beams: Per BR, removed underline in H2c1.10
- 09:31, 27 September 2016 diff hist -200 m Category:642 Pedestrian Facilities →Guidance Documents: per LPA, minor clarification
- 07:37, 27 September 2016 diff hist +3 m 751.14 Steel Superstructure →751.14.6.2 Girder Camber and Dead Load Deflection: minor correction
- 07:19, 27 September 2016 diff hist 0 N File:642 Questions.pdf current
- 07:19, 27 September 2016 diff hist +451 m Category:642 Pedestrian Facilities →Guidance Documents: Per EPG, added Q&A for DOJ/DOT Joint Technical Assistance on the Title II of the ADA Requirements
- 14:49, 23 September 2016 diff hist -7 m 236.8 Relocation Assistance Program
- 14:47, 23 September 2016 diff hist -5 m 236.8 Relocation Assistance Program
- 14:42, 23 September 2016 diff hist +5 m 236.8 Relocation Assistance Program Per RW, updated link
- 14:27, 23 September 2016 diff hist +11 m Category:138 Project Development Chronology Per EPG, updated title
- 14:26, 23 September 2016 diff hist +383 m Category:130 Value Engineering Per EPG, updated title
- 14:23, 23 September 2016 diff hist +55 m 104.13 Construction Inspection Guidance for Sec 104 Per EPG, revised title
- 14:20, 23 September 2016 diff hist +56 m Help Article Per EPG, revised title
- 13:53, 23 September 2016 diff hist 0 m Main Page
- 13:40, 23 September 2016 diff hist +334 Main Page
- 13:25, 23 September 2016 diff hist +766 m Category:130 Value Engineering →130.1 Discussion: Per EPG, updates reflect tracker identified goal and detail the new workbook available for district-led Value Analysis use.
- 12:04, 23 September 2016 diff hist -235 m Main Page EPG 751.1.1
- 11:29, 23 September 2016 diff hist 0 m 751.1 Preliminary Design →751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)
- 11:28, 23 September 2016 diff hist 0 N File:751.1.1.5 2016.jpg current
- 11:27, 23 September 2016 diff hist +1,842 m 751.1 Preliminary Design Per BR, routine update to conform with internal Bridge Division current practice.
- 10:42, 23 September 2016 diff hist 0 m 751.6 General Quantities Per BR, minor correction
- 09:59, 23 September 2016 diff hist -208 m Main Page EPG 237.2.8, EPG 751.10;1;11
- 09:50, 23 September 2016 diff hist +187 m 237.2 Title Sheet →237.2.8 Utility Information Note: Per DE, relocated specifications to more reasonable locations
- 09:17, 23 September 2016 diff hist +35 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 09:12, 23 September 2016 diff hist +41 m 751.14 Steel Superstructure →751.14.6.2 Girder Camber and Dead Load Deflection: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 09:08, 23 September 2016 diff hist 0 m 751.10 General Superstructure →751.10.1.11 Slab Elevations
- 09:07, 23 September 2016 diff hist 0 N File:751.10.1.11 Typical Details.jpg current
- 09:06, 23 September 2016 diff hist -1,379 m 751.10 General Superstructure →751.10.1.11 Slab Elevations: Per BR, revised various notes (H1.7, H2c6.1, H2c6.10, and H2c6.12) and details to match each other and MicroStation cells.
- 14:42, 22 September 2016 diff hist +1 m 751.5 Structural Detailing Guidelines →751.5.4.4 Expansion Devices
- 14:35, 22 September 2016 diff hist -1 m 751.6 General Quantities Per BR, corrected pay item identification
- 14:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 54.pdf current
- 14:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 50.pdf current
- 14:29, 22 September 2016 diff hist +255 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Transportation Management Plan: Per CM, added two TMP examples
- 14:14, 22 September 2016 diff hist +68 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, clarification by boxing the guidance
- 12:36, 22 September 2016 diff hist -3 m Category:617 Traffic Barrier Per BR, minor correction
- 12:35, 22 September 2016 diff hist -3 m 611.3 Concrete Slope Protection →611.3.2 Construction Inspection (Sec 611.60.3): Per BR, minor correction
- 12:34, 22 September 2016 diff hist -3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.6 Barrier Wall Delineation: Per BR, minor correction
- 12:33, 22 September 2016 diff hist -3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.5 Guardrail Delineation: Per BR, minor correction
- 12:32, 22 September 2016 diff hist -3 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Per BR, minor correction
- 12:31, 22 September 2016 diff hist -24 m 751.50 Standard Detailing Notes Per BR, minor correction
- 10:53, 22 September 2016 diff hist -13 m Main Page EPG 109.1
- 10:32, 22 September 2016 diff hist +264 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, guidance about measuring quantities was clarified. Current guidance no longer exceeds the degree of accuracy requried by the specs or JSPs
- 09:35, 22 September 2016 diff hist -38,199 m 751.5 Structural Detailing Guidelines Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:31, 22 September 2016 diff hist -3,765 m 751.40 LFD Widening and Repair Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:22, 22 September 2016 diff hist 0 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 08:21, 22 September 2016 diff hist -560 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:19, 22 September 2016 diff hist -468 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.2 Vertical Drains: Per BR, replaced outdated details with links to the internet
- 08:14, 22 September 2016 diff hist +431 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.4 Exploded View of the End Bent: New EPG 751.34.3.5 (links to the internet in lieu of adding duplicate table)
- 08:12, 22 September 2016 diff hist -1,488 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:08, 22 September 2016 diff hist -4,294 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:06, 22 September 2016 diff hist -782 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (Top Mounted) TL-4 (NCHRP 350): Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 08:01, 22 September 2016 diff hist -3,379 m 751.10 General Superstructure Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:52, 22 September 2016 diff hist -1,483 m Category:503 Bridge Approach Slabs Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 13:02, 15 September 2016 diff hist 0 N File:Main Page September 15, 2016.jpg current
- 13:02, 15 September 2016 diff hist -184 m Main Page EPG 903
- 10:22, 15 September 2016 diff hist -40 m 153.9 Design CCO renumbered the contracts. New links needed.
- 09:27, 15 September 2016 diff hist +181 m 153.7 Construction and Materials CCO renumbered the contracts. New links needed.
- 09:08, 15 September 2016 diff hist -46 m 153.5 Bridge CCO renumbered the contracts. New links needed.
- 08:36, 15 September 2016 diff hist -1,027 m 903.3 Ground-Mounted Sign Supports Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 08:21, 15 September 2016 diff hist +741 m 903.2 Extent of Signing →903.2.12 Quantity Computations: Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 13:52, 14 September 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements
- 10:34, 14 September 2016 diff hist -199 m Main Page EPG 110.3
- 08:04, 14 September 2016 diff hist +397 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, guidance updated to comply with the e-Construction JSP.
- 07:20, 14 September 2016 diff hist +26 m 903.6 Warning Signs →903.6.33 LANE END Signs (W4-2, W9-1, W9-2) (MUTCD Section 2C.42): Per TS, clarification of the use of Lane Ends sign
- 11:29, 13 September 2016 diff hist +87 m Category:101 Standard Forms
- 11:28, 13 September 2016 diff hist +87 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 11:27, 13 September 2016 diff hist +87 m Category:101 Standard Forms →Construction and Materials: Per TS, updated WZ Inspection Form link
- 11:00, 13 September 2016 diff hist -2 m Main Page
- 10:24, 13 September 2016 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing
- 10:11, 13 September 2016 diff hist +54 m Category:101 Standard Forms Per TS, updated WZ Inspection Form links
- 10:10, 13 September 2016 diff hist +27 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 14:36, 9 September 2016 diff hist 0 m Main Page
- 14:44, 8 September 2016 diff hist 0 m Main Page
- 15:10, 7 September 2016 diff hist -211 m Category:747 Bridge Reports and Layouts →747.1.3.5 Valley/Channel Section Sheets: Per BR, rvision brings guidance into line with related changes previously completed in EPG 238.3.36.3.6.
- 15:07, 7 September 2016 diff hist -247 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per BR, irrelevant paragraph removed
- 13:19, 7 September 2016 diff hist +42 m 236.8 Relocation Assistance Program Per RW, updated link to Form 236.8.9.4.8, Replacement Housing Claim (Form 236.8.9.4(b))
- 12:57, 7 September 2016 diff hist 0 N File:Main Page September 7, 2016.jpg current
- 12:57, 7 September 2016 diff hist +65 m Main Page
- 07:24, 7 September 2016 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to Form 136.8.7.1.11
- 07:19, 7 September 2016 diff hist +35 m LPA:136.13 LPA Policy Changes
- 07:18, 7 September 2016 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 07:18, 7 September 2016 diff hist +35 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 11:25, 6 September 2016 diff hist +214 m LPA:136.13 LPA Policy Changes Form 136.8.7.1.11
- 11:22, 6 September 2016 diff hist -157 m LPA:136.12 Figures, Glossary and Other Useful Links
- 11:21, 6 September 2016 diff hist +111 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.7.1.11
- 11:18, 6 September 2016 diff hist 0 N File:136.8.7.1.11.docx
- 11:17, 6 September 2016 diff hist +20 m LPA:136.8 Local Public Agency Land Acquisition
- 11:17, 6 September 2016 diff hist -197 m LPA:136.8 Local Public Agency Land Acquisition Per RW, the prorata tax form (7-22.2C) was updated to be only for the LPAs. It was also relabeled as Form 136.8.7.1.11.
- 10:56, 6 September 2016 diff hist +146 m Main Page EPG 131.1
- 10:08, 6 September 2016 diff hist -754 m 751.5 Structural Detailing Guidelines →751.5.8.1 Bridge Approach Slab: Per BR, deleted links to archaic drawings of Approach slabs.
- 08:21, 6 September 2016 diff hist +2,410 m 131.1 Design Exception Process Per EPG, federal rule has reduced controlling criteria to 10, reducing instances where fed approval is required for controlling criteria on federal involvement projects.
- 15:17, 2 September 2016 diff hist +1 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award
- 15:03, 2 September 2016 diff hist +4 m Main Page
- 14:23, 2 September 2016 diff hist 0 m LPA:136.13 LPA Policy Changes
- 14:22, 2 September 2016 diff hist +210 m LPA:136.13 LPA Policy Changes EPG 136.10.8
- 14:20, 2 September 2016 diff hist +5 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award: Per LPA, clarified the need for a performance/contract bond in the executed construction contract for LPA projects.
- 14:24, 31 August 2016 diff hist 0 N File:Main Page 2 August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist 0 N File:Main Page August 31, 2016.jpg current
- 14:24, 31 August 2016 diff hist +550 m Main Page
- 07:13, 31 August 2016 diff hist 0 m Category:407 Tack Coat →407.1.5 Method of Measurement (Sec 407.5): Per CM, minor correction. To round gallons to nearest gallon, not nearest 10 gallons current
- 07:48, 30 August 2016 diff hist 0 m Main Page
- 10:43, 29 August 2016 diff hist +10 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:41, 29 August 2016 diff hist 0 N File:751.13.6.3 squared 2016.jpg current
- 10:41, 29 August 2016 diff hist +204 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 10:23, 29 August 2016 diff hist 0 N File:751.13.6.3 skewed 2016.jpg current
- 10:23, 29 August 2016 diff hist +4 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 14:48, 26 August 2016 diff hist -13 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor correction
- 14:21, 26 August 2016 diff hist +30 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated links
- 13:41, 26 August 2016 diff hist +88 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints
- 12:18, 26 August 2016 diff hist -21 m Main Page EPG 907.1
- 12:17, 26 August 2016 diff hist -146 m 907.7 Highway Safety Manual →907.7.2 When is the Highway Safety Manual Used?: Per TS, removed archaic link
- 12:16, 26 August 2016 diff hist +691 907.1 Safety Program Guidelines Per TS, restructured and clarified existing content; new content for safety funds that was previously issued by TP in the most recent STIP Programming Guidance.
- 09:22, 26 August 2016 diff hist +123 m 127.7 Threatened and Endangered Species →127.7.6.4 District Responsibilities: link to JSP
- 09:02, 26 August 2016 diff hist 0 N File:127.7 Tumbling Creek Outflight.wmv current
- 09:02, 26 August 2016 diff hist +42 m 127.7 Threatened and Endangered Species →127.7.2 Process: video upload
- 08:56, 26 August 2016 diff hist +35 m 127.7 Threatened and Endangered Species →127.7.6.3 Process: minor clarification
- 11:19, 25 August 2016 diff hist -468 m Main Page EPG 127.7, EPG 703.2.7
- 11:02, 25 August 2016 diff hist +765 m Category:703 Concrete Masonry Construction →703.2.7 Machine Finishing: Per CM and BR, expanded and clarified guidance for the use of a vibratory screed
- 09:20, 25 August 2016 diff hist 0 N File:127.7.6.1.jpg current
- 09:20, 25 August 2016 diff hist 0 N File:127.7.2.jpg current
- 09:19, 25 August 2016 diff hist +10,965 127.7 Threatened and Endangered Species Per Env'l, updated text to match LPA EPG, clarified several practices, added info on migratory birds
- 14:58, 24 August 2016 diff hist -10 Main Page EPG 401, EPG 460, EPG 606.1, EPG 616.18, EPG 643.2, EPG 231.8, EPG 751.1,
- 14:54, 24 August 2016 diff hist +862 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling: Per CM, collection of a 3rd pt. can of binder as retained sample is appropriate procedure. If a 3rd party test is needed, it can be performed on retained sample
- 14:42, 24 August 2016 diff hist 0 m 236.7 Negotiation Per RW, updated Form 7.2.12
- 13:57, 24 August 2016 diff hist -139 Category:401 Bituminous Base and Pavement →401.2.3 Job Mix Formula (Sec 401.4): Per CM, guidance brought in line w/ current practice. Contractors allowed flexibility in the field to make bin adjustments provided the specs are satisfied
- 13:46, 24 August 2016 diff hist +326 Category:401 Bituminous Base and Pavement →401.2.8 Quality Assurance (Sec 401.9): Per CM, reflects updates to Sec 401. Includes revision to TSR verbiage, plant setting adjustments by contractor without prior approval, average core results
- 13:34, 24 August 2016 diff hist +344 606.1 Guardrail →606.1.3 Guardrail Systems: Per EPG, removed incidental grading for Type A end terminals so that a separate pay item could be included for prime contractors to bid on projects.
- 13:26, 24 August 2016 diff hist +107 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, Hydro Demolition updates
- 12:49, 24 August 2016 diff hist -2,024 m 643.2 Local Utility Adjustments - Public and Private Per DE, generally updated the article to reflect current practice
- 12:47, 24 August 2016 diff hist +16 m Category:747 Bridge Reports and Layouts →747.1.3.4.1 General Information for All Profile Sheets
- 12:46, 24 August 2016 diff hist +2 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations
- 12:39, 24 August 2016 diff hist +56 m Category:747 Bridge Reports and Layouts updated links
- 12:37, 24 August 2016 diff hist +56 m 751.5 Structural Detailing Guidelines updated links
- 12:36, 24 August 2016 diff hist +144 751.1 Preliminary Design →751.1.2.5 Vertical and Horizontal Clearance: Per BR, Criteria for minimum bridge width expanded in EPG 231.8 to include National Bridge Inventory rating system requirements for bridge width.
- 12:22, 24 August 2016 diff hist +3,549 231.8 Bridge Width Per BR, Criteria for minimum bridge width expanded to include National Bridge Inventory rating system requirements for bridge width
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 section BB.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 elevation.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.5 part plan.jpg current
- 12:09, 24 August 2016 diff hist 0 N File:751.13.6.4 finger plate.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.4 part plan of slab.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.3 skewed.jpg current
- 12:08, 24 August 2016 diff hist 0 N File:751.13.6.3 squared.jpg current
- 12:07, 24 August 2016 diff hist +1,742 751.13 Expansion Joint Systems →751.13.6 Finger Plate Expansion Devices: New EPG 751.13.4 shows slab extensions at ends of finger plate expansion devices & additional bars in extension. New barrier curb reinforcement guidance
- 11:20, 24 August 2016 diff hist -567 m 616.18 Construction Inspection Guidelines for Sec 616 →Lighting Requirements (for Sec 616.5): Per CM, deleted pay item 616.2010 WORK ZONE LIGHTING
- 15:05, 22 August 2016 diff hist +1 m Main Page
- 14:41, 19 August 2016 diff hist -42 m 236.8 Relocation Assistance Program Per RW, updated link to Replacement Housing Claim form
- 13:55, 19 August 2016 diff hist -1 m Main Page
- 13:55, 19 August 2016 diff hist +89 m Main Page EPG 110.3
- 12:56, 19 August 2016 diff hist 0 N File:110.3 letter 4.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 3.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 2.doc current
- 12:55, 19 August 2016 diff hist 0 N File:110.3 letter 1.doc current
- 12:55, 19 August 2016 diff hist +1,461 m Category:110 State and Federal Wage Rates and Other Requirements →Application of Prevailing Wage off of the Worksite: Per CM, new guidance to address late final plans paperwork from contractor.
- 09:24, 18 August 2016 diff hist 0 m 903.6 Warning Signs →Table 903.6.3 Warning Sign and Plaque Sizes: Per TS, corrected the mistaken sizes of the W16-7P
- 08:01, 17 August 2016 diff hist -5 m 643.4 Railroads Per Multimodal, updated BNSF link
- 14:05, 16 August 2016 diff hist 0 N File:Main Page August 16, 2016.jpg current
- 14:05, 16 August 2016 diff hist +124 m Main Page
- 07:41, 16 August 2016 diff hist -73 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) updated link to Std Plan 616.10
- 14:37, 12 August 2016 diff hist +38 m Main Page EPG 134.3.4
- 14:24, 12 August 2016 diff hist +618 m Category:134 Engineering Professional Services →134.3.4 Basis of Payment: Per LPA, clarified that the majority of consultant contracts are actual cost plus fixed fee; added Lump Sum and Hourly Rate Contracts to the list of payment methods.
- 12:24, 12 August 2016 diff hist 0 N File:134.2.2 2016.pdf
- 12:24, 12 August 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2 Standard Consultant Contract Checklist. Added hyperlinks
- 11:08, 12 August 2016 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig 134.2.4 so that the hyperlinks were operational
- 10:45, 12 August 2016 diff hist +229 m Main Page EPG 134.2.4
- 10:38, 12 August 2016 diff hist 0 N File:134.2.4 2016.pdf
- 10:38, 12 August 2016 diff hist 0 m Category:134 Engineering Professional Services Per LPA, Fig 134.2.4, MOU Checklist revised to clarify the steps of the MOU process to better align with EPG 134.2.4 guidance
- 10:37, 12 August 2016 diff hist +230 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, removed text where MOU's are "..for the quick delivery of
- 15:00, 11 August 2016 diff hist 0 N File:Main Page August 11, 2016.jpg current
- 14:59, 11 August 2016 diff hist -216 m Main Page
- 14:40, 11 August 2016 diff hist 0 m Main Page
- 08:16, 11 August 2016 diff hist +36 m 236.7 Negotiation Per RW, the Pro Rata Real Estate Tax Claim (Form 7-2.22C) replaced with: Prorata Real Est Tax Claim, Owner's Section (Form 7-2.22C) and D, MoDOT's section
- 07:58, 11 August 2016 diff hist 0 m 236.7 Negotiation
- 12:47, 10 August 2016 diff hist -2 m Main Page
- 09:01, 10 August 2016 diff hist +36 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: inserted link
- 08:16, 10 August 2016 diff hist -189 m 237.9 Submission of Plans and Supporting Documents Per Est. and Review, additional revision to the article to reflect current guidance on how to handle the confidential estimate information
- 13:37, 8 August 2016 diff hist -51 m 236.16 Outdoor Advertising →236.16.25 File Storage Process: Per RW, vegetation application deleted from retention list. It was not a required document
- 13:02, 8 August 2016 diff hist 0 N File:616.8.14a DECM 2014.pdf
- 13:02, 8 August 2016 diff hist 0 N File:616.8.14 DECM 2016.pdf current
- 13:02, 8 August 2016 diff hist 0 N File:616.8.13 DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10g DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10f DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10d DECM 2016.pdf current
- 13:01, 8 August 2016 diff hist 0 N File:616.8.10 DECM 2016.pdf current
- 12:59, 8 August 2016 diff hist +40 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 12:30, 8 August 2016 diff hist 0 N File:616.8 legend 2016.pdf current
- 12:30, 8 August 2016 diff hist +5 m Category:616 Temporary Traffic Control Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 12:26, 8 August 2016 diff hist -2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 07:23, 8 August 2016 diff hist -58 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS, updated Unit Pricing for Logo Work on MoDOT Constr Projects
- 07:22, 8 August 2016 diff hist 0 N File:616.18 Unit Price.pdf current
- 07:21, 8 August 2016 diff hist -2 m 903.11 Specific Service Signs - Logos Per TS, again updated Unit Pricing for Logo Work on MoDOT Constr Projects
- 08:36, 5 August 2016 diff hist 0 m Main Page
- 07:40, 5 August 2016 diff hist -1 m Help Article →EPG Approval Process
- 13:02, 4 August 2016 diff hist +10 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 13:01, 4 August 2016 diff hist -2 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 12:57, 4 August 2016 diff hist -241 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, reference to archaic Hazardous Matertials Reporting Procedures Training was removed
- 14:38, 3 August 2016 diff hist 0 m Main Page
- 10:39, 3 August 2016 diff hist +5 m 106.3.2.76 TM-76, Acid Insoluble Residue →106.3.2.76.7 Volumetric Determination of Percent Non-Carbonate Using Individual Fractions current
- 10:12, 3 August 2016 diff hist -13 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 10:08, 3 August 2016 diff hist +13 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 14:41, 2 August 2016 diff hist +3 m Main Page
- 13:37, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 10:08, 2 August 2016 diff hist -1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 10:07, 2 August 2016 diff hist -1 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing
- 10:07, 2 August 2016 diff hist +1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 09:57, 2 August 2016 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 09:56, 2 August 2016 diff hist -5 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 09:54, 2 August 2016 diff hist +64 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 09:51, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:50, 2 August 2016 diff hist -2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:47, 2 August 2016 diff hist -87 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 09:45, 2 August 2016 diff hist +338 m 237.9 Submission of Plans and Supporting Documents updated links, per Bids
- 09:34, 2 August 2016 diff hist -6 751.7 General Design Data current
- 14:04, 29 July 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 13:50, 29 July 2016 diff hist +65 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 13:41, 29 July 2016 diff hist -3 m Main Page EPG 237.9
- 12:59, 29 July 2016 diff hist +1 m Main Page
- 11:05, 29 July 2016 diff hist 0 N File:616.8.39a.pdf current
- 11:05, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 2 DECM 2016.pdf
- 11:04, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 1 DECM 2016.pdf
- 11:04, 29 July 2016 diff hist 0 N File:616.8.34 DECM 2016.pdf current
- 11:04, 29 July 2016 diff hist 0 N File:616.8.32 DECM 2016.pdf current
- 11:04, 29 July 2016 diff hist 0 N File:616.8.7b DECM 2016.pdf current
- 11:03, 29 July 2016 diff hist +133 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per Traffic, several minor updates to TAs. New TA 39A is a slightly updated Fig. 616.7 Standard Temporary Connection...
- 10:44, 29 July 2016 diff hist 0 N File:237.9.3.3.4.1.jpg current
- 10:43, 29 July 2016 diff hist 0 N File:237.9.6.jpg current
- 10:42, 29 July 2016 diff hist -4 m 237.14 Electronic Design Data Delivery (BIM Deliverables) updated links
- 10:41, 29 July 2016 diff hist -5 m Category:138 Project Development Chronology updated links
- 10:40, 29 July 2016 diff hist -34 m 103.1 Bid Opening and Award Process updated links
- 10:39, 29 July 2016 diff hist +6,185 m 237.9 Submission of Plans and Supporting Documents Per Est. and Review, generally revised the article to reflect current guidance for the submission of plans and supporting documents for eProjects
- 08:16, 29 July 2016 diff hist -2 237.9 Submission of Plans and Supporting Documents
- 12:22, 26 July 2016 diff hist 0 N File:Main Page July 26, 2016.jpg current
- 12:22, 26 July 2016 diff hist -444 m Main Page EPG 237.3.7.5