- 10:07, 7 August 2018 diff hist 0 N File:616.7.2.1.jpg
- 10:05, 7 August 2018 diff hist +917 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) Per TS, clarified guidance on what traffic control devices are needed based on the work duration.
- 09:53, 7 August 2018 diff hist -44 m Category:612 Impact Attenuators →612.1.5 MoDOT Protective Vehicle/TMA Operator’s Training
- 09:51, 7 August 2018 diff hist +74 N 612.5 Maintenance Planning Guidelines for Impact Attenuators Smithk moved page 612.5 Maintenance Planning Guidelines for Impact Attenuators to 612.4 Maintenance Planning Guidelines for Impact Attenuators: EPG 612.4 Truck-Mounted Attenuator Training has been removed and the former EPG 612.5 is now EPG 612... current
- 09:50, 7 August 2018 diff hist 0 N File:612.2 array.jpg current
- 09:48, 7 August 2018 diff hist +1,171 Category:612 Impact Attenuators Per TS, sand barrel impact attenuator setup will now be based on manufacturer's recommendations instead of std plans. WZ durations have been revised. New guidance clarifies when flashing arrow panel and lights on TMA should be active.
- 11:16, 3 August 2018 diff hist +14 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced "Retroreflectivity Calculation" with "Retroreflectivity Payment Adjustment"
- 13:49, 2 August 2018 diff hist -1 m 751.1 Preliminary Design →751.1.2.20 Soundings (Borings): Per BR, minor grammatical revisions
- 13:21, 2 August 2018 diff hist +94 m 236.13 Designing Right of Way Plans Per RW, updated RW links
- 13:20, 2 August 2018 diff hist +47 m 236.12 Quality Assurance Reviews Per RW, updated RW link
- 13:19, 2 August 2018 diff hist +47 m 236.8 Relocation Assistance Program Per RW, updated RW link
- 13:18, 2 August 2018 diff hist +47 m 236.5 Property Management Per RW, updated RW link
- 13:17, 2 August 2018 diff hist +47 m 236.2 Right of Way Organization and Personnel Per RW, updated RW link
- 13:17, 2 August 2018 diff hist +47 m 236.1 General Information Per RW, updated RW links
- 13:16, 2 August 2018 diff hist +94 m 236.10 Right Of Way Condemnation Per RW, updated RW links
- 13:46, 1 August 2018 diff hist -36 m 320.4 Procedure for Final Sounding Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:45, 1 August 2018 diff hist -18 m 320.3 Drilling Operations Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:44, 1 August 2018 diff hist -9 m Category:101 Standard Forms Per BR, minor update for "Request for Final Sounding for Structures" Form
- 13:43, 1 August 2018 diff hist 0 N File:751.1.2.20 Guidance.xlsx
- 13:42, 1 August 2018 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx
- 13:42, 1 August 2018 diff hist 0 N File:751.1.2.20 Request.xlsx
- 13:41, 1 August 2018 diff hist -28 m 751.1 Preliminary Design Per BR, slightly revised the title of "Guidance for Request for Final Soundings for Structures" form. Also, minor update for "Request for Final Sounding for Structures" Form
- 13:51, 31 July 2018 diff hist -206 m 236.12 Quality Assurance Reviews Per RW, updated CFR links
- 14:50, 30 July 2018 diff hist 0 m 751.40 LFD Widening and Repair →751.40.1.2 Steel HP Pile Maintenance and Repair: Per BR, updated link
- 10:48, 26 July 2018 diff hist -33 m 616.14 Work Zone Safety and Mobility Policy deleted photo
- 10:47, 26 July 2018 diff hist -57 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2.3 Short-term Stationary
- 10:18, 26 July 2018 diff hist -27 m 236.16 Outdoor Advertising Per RW, updated link to Performance Bond
- 10:15, 26 July 2018 diff hist 0 N File:236.16 and 941.6.3.6 Performance bond.pdf
- 10:15, 26 July 2018 diff hist +52 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: Per TS, added Performance Bond file
- 09:54, 26 July 2018 diff hist -117 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: removed link to Performance Bond
- 09:53, 26 July 2018 diff hist +116 m Category:941 Permits and Access Requests →941.6.3.6 Deposit Requirements: Per TS, added link to Performance Bond
- 08:49, 26 July 2018 diff hist +196 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced JOC Pavement Repair with two forms: JOC Concrete Pavement Repair and JOC Asphalt Pavement Repair. Added a third form (JOC Signal and Lighting Repair)
- 12:55, 25 July 2018 diff hist +118 m Category:101 Standard Forms →Construction and Materials: Per CM, added the 2018 version of the JOC Rail Cable Fence Spreadsheet
- 12:50, 25 July 2018 diff hist +197 m Category:101 Standard Forms →Construction and Materials: Per CM, added two forms (Asphalt Roadway Report Sq. Yards and Final Plans Memo). Updated a third form (Asphalt Roadway Report)
- 08:07, 25 July 2018 diff hist +10 m Main Page EPG 237.14.3.6
- 08:05, 25 July 2018 diff hist +26 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, updated guidance to make bidding documents more easily accessible. Reference to archaic plan sheet dgn file procedures deleted.
- 07:42, 25 July 2018 diff hist 0 File:106.15.2.pdf Smithk uploaded a new version of File:106.15.2.pdf current
- 07:26, 25 July 2018 diff hist 0 File:106.15.1.pdf Smithk uploaded a new version of File:106.15.1.pdf current
- 07:13, 25 July 2018 diff hist +742 m 127.29 Stormwater →127.29.8 MCM 6: Pollution Prevention/Good Housekeeping: Per Env'l, moved EPG 129.13 to EPG 127.29.9
- 07:13, 25 July 2018 diff hist -563 m Category:129 Public Involvement →129.13 Public Involvement for Stormwater: Per Env'l, moved EPG 129.13 to EPG 127.29.9
- 13:19, 24 July 2018 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) updated STIP link
- 12:52, 24 July 2018 diff hist 0 File:756 LRFD flowchart.pdf Smithk uploaded a new version of File:756 LRFD flowchart.pdf
- 10:19, 24 July 2018 diff hist -2 m 751.37 Drilled Shafts →751.37.3 Design for Axial Loading at Strength Limit State: minor correction
- 14:29, 23 July 2018 diff hist 0 N File:Searching the Engineering Policy Guide.docx current
- 14:29, 23 July 2018 diff hist +242 Main Page Added "Searching the Engineering Policy Guide"
- 13:39, 23 July 2018 diff hist 0 File:106.3.2.83.7 elevation.pdf Smithk uploaded a new version of File:106.3.2.83.7 elevation.pdf current
- 13:38, 23 July 2018 diff hist 0 File:106.3.2.83.7 elevation.pdf Smithk uploaded a new version of File:106.3.2.83.7 elevation.pdf
- 13:13, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form 2012.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form 2012.pdf
- 13:12, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form 887.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form 887.pdf current
- 13:11, 23 July 2018 diff hist 0 File:104.11 Completed SIMS form.pdf Smithk uploaded a new version of File:104.11 Completed SIMS form.pdf current
- 11:16, 8 March 2017 diff hist +148 m Main Page EPG 751.22
- 11:11, 8 March 2017 diff hist +522 m 751.22 Prestressed Concrete I Girders →751.22.2.2 Prestressing Strands: Per BR, new guidance to align NU top flange, straight & harped prestressing strands, when possible, in NU prestressed girders to aid fabricating flange blockouts
- 10:27, 8 March 2017 diff hist +96 m Main Page EPG 751.1.2
- 10:26, 8 March 2017 diff hist +79 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: inserted links
- 09:40, 8 March 2017 diff hist +257 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, expanded and clarified bridge approach slabs requirements for Bridge Memo and the Design Layout.
- 08:06, 8 March 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:25, 7 March 2017 diff hist +402 m Main Page EPG 751
- 10:37, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.3 Encased Pile Cap Bent
- 10:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part section.jpg current
- 10:37, 7 March 2017 diff hist 0 N File:751.32.3.3 part elev.jpg current
- 10:36, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 10:36, 7 March 2017 diff hist 0 N File:751.32.3.2.1 alternate.jpg current
- 10:35, 7 March 2017 diff hist 0 N File:751.32.3.2.1 steel bearing.jpg current
- 10:35, 7 March 2017 diff hist +5 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:34, 7 March 2017 diff hist 0 N File:751.32 circled 7.gif current
- 10:34, 7 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 10:33, 7 March 2017 diff hist 0 N File:751.32.3.2.jpg current
- 10:33, 7 March 2017 diff hist -109 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:50, 7 March 2017 diff hist +383 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 09:19, 7 March 2017 diff hist +6 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 09:13, 7 March 2017 diff hist +18 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 08:51, 7 March 2017 diff hist +3,117 m 751.50 Standard Detailing Notes Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 12:03, 6 March 2017 diff hist +660 m 751.6 General Quantities Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:57, 6 March 2017 diff hist +50 m 751.5 Structural Detailing Guidelines →751.5.1.3.1 Abbreviations: Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 11:54, 6 March 2017 diff hist +3,579 m 751.1 Preliminary Design Per BR, all steel pile (HP, Closed end CIP, Opened end CIP) shall be galvanized.
- 15:03, 3 March 2017 diff hist -98 m 616.22 Advanced Work Zone Training Per CM and TS, removed references of training courses to coordinate with Sec 616
- 14:24, 3 March 2017 diff hist 0 m Main Page
- 15:43, 2 March 2017 diff hist -3 m 751.10 General Superstructure →751.10.4 Conduit Systems: minor correction
- 13:53, 2 March 2017 diff hist -3 m Main Page
- 14:39, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection Guide.docx current
- 14:38, 1 March 2017 diff hist 0 N File:1040.2 Guardrail Inspection.ppt current
- 14:38, 1 March 2017 diff hist +224 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material Per CM, added links to a PowerPoint, a guide document and checklist for guardrail inspection.
- 12:14, 1 March 2017 diff hist +80 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:11, 1 March 2017 diff hist +18 m 751.8 LRFD Concrete Box Culverts Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 12:10, 1 March 2017 diff hist +18 m 751.5 Structural Detailing Guidelines →751.5.9.2.7 Length Calculations: Per BR, replaced informal “bar bill” with “bill of reinforcing steel”
- 14:30, 28 February 2017 diff hist +13 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.1 Standard Safety Barrier Curbs used in Missouri: Per BR, corrected TL level for the Type D Std Safety Barrier Curb
- 14:23, 28 February 2017 diff hist 0 N File:Main Page February 28, 2017.jpg current
- 14:22, 28 February 2017 diff hist +34 m Main Page
- 16:23, 27 February 2017 diff hist 0 N File:616.8.50 Feb 27 2017.pdf
- 16:23, 27 February 2017 diff hist +6 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, further clarification of TA 50
- 15:40, 27 February 2017 diff hist 0 m Main Page
- 14:26, 27 February 2017 diff hist +13 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.3 WORK ZONE NO PHONE ZONE Sign: Per TS and CM, clarification of placement of the WZ No Phone sign
- 14:22, 27 February 2017 diff hist 0 N File:616.8.50 Feb 2017.pdf current
- 14:22, 27 February 2017 diff hist +8 m 616.8 Typical Applications (MUTCD 6H) Per TS and CM, clarification of TA 50
- 13:06, 27 February 2017 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist +2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:08, 27 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign
- 11:07, 27 February 2017 diff hist +28 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.1 RATE OUR WORK ZONE Sign: inserted link
- 11:06, 27 February 2017 diff hist +45 m 616.8 Typical Applications (MUTCD 6H) inserted link
- 08:14, 27 February 2017 diff hist +517 m Talk:231.1 Median Width current
- 08:13, 27 February 2017 diff hist +517 m Category talk:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches current
- 14:55, 24 February 2017 diff hist -121 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Project Signs: Per TS, further clarification to the revision from earlier this month
- 14:37, 24 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.1 Types of Devices (MUTCD 6F.01)
- 14:05, 23 February 2017 diff hist -121 m Main Page EPG 821
- 13:40, 23 February 2017 diff hist 0 N File:821.25 krenite.jpg current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Vastlan General Information.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Perspective General Information 2017.docx current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Plateau General Information 2017.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Outrider General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Milestone General Information 2017.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Method.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Krenite S General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Escort XP General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 2,4-D General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Total Vegetative Control Custom Mix.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Basal Bark General Information 2017.doc current
- 13:36, 23 February 2017 diff hist 0 N File:821.25 Aquatic Glyphosate General Information 2017.doc current
- 13:36, 23 February 2017 diff hist +918 m 821.25 Products Per MT, new products with the new 2017 bid have replaced old products current
- 13:23, 23 February 2017 diff hist -196 m 821.23 Additives and Adjuvants Per MT, new products with the new 2017 bid have replaced old products current
- 11:36, 23 February 2017 diff hist -1 m 821.22 Weed Control in Landscaped Areas current
- 11:36, 23 February 2017 diff hist -709 m 821.22 Weed Control in Landscaped Areas Per MT, new products with the new 2017 bid have replaced old products
- 11:21, 23 February 2017 diff hist +57 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS and CM, updated LOGO tel number contact
- 10:43, 23 February 2017 diff hist +23 m 821.20 Woody Plant Control Per MT, new products with the new 2017 bid have replaced old products current
- 10:39, 23 February 2017 diff hist -11 m 821.19 Problem Weeds Per MT, new products with the new 2017 bid have replaced old products current
- 10:25, 23 February 2017 diff hist +452 m 821.18 Noxious Weeds Per MT, new products with the new 2017 bid have replaced old products
- 10:17, 23 February 2017 diff hist +253 m 821.17 Plant Growth Regulators (PGRs) Per MT, new products with the new 2017 bid have replaced old products current
- 10:06, 23 February 2017 diff hist -570 m 821.16 Total Vegetation Control Treatment Per MT, new products with the new 2017 bid have replaced old products current
- 09:48, 23 February 2017 diff hist -125 m 821.14 Herbicide Spills Incident Reporting →Table 821.14.1: Per MT, new products with the new 2017 bid have replaced old products current
- 09:46, 23 February 2017 diff hist +8 m 821.12 Mixing and Handling Guidelines Per MT, new products with the new 2017 bid have replaced old products current
- 09:45, 23 February 2017 diff hist -79 m 821.11 Calibration Per MT, new products with the new 2017 bid have replaced old products current
- 09:30, 23 February 2017 diff hist -1 m 821.10 Equipment and Application Methods Per MT, new products with the new 2017 bid have replaced old products current
- 09:30, 23 February 2017 diff hist +57 m 821.9 Labels and Safety Data Sheets (SDS) Per MT, new products with the new 2017 bid have replaced old products
- 09:27, 23 February 2017 diff hist 0 m 821.9 Labels and Safety Data Sheets (SDS) 821.9 Labels and Material Safety Data Sheets (MSDS) moved to 821.9 Labels and Safety Data Sheets (SDS): MSDS is now SDS...no more "Material"
- 09:27, 23 February 2017 diff hist +55 N 821.9 Labels and Material Safety Data Sheets (MSDS) 821.9 Labels and Material Safety Data Sheets (MSDS) moved to 821.9 Labels and Safety Data Sheets (SDS): MSDS is now SDS...no more "Material" current
- 09:26, 23 February 2017 diff hist -1 m 821.6 Inventory Control and Storage Per MT, new products with the new 2017 bid have replaced old products current
- 09:25, 23 February 2017 diff hist -1 m 821.5 Storage Facilities Per MT, new products with the new 2017 bid have replaced old products current
- 09:24, 23 February 2017 diff hist +163 m 821.4 Pesticides and the Environment Per MT, new products with the new 2017 bid have replaced old products current
- 09:22, 23 February 2017 diff hist +19 m 821.2 Safety Per MT, new products with the new 2017 bid have replaced old products current
- 09:19, 23 February 2017 diff hist -76 m Category:821 Herbicides and Roadsides Per MT, new products with the new 2017 bid have replaced old products
- 10:33, 22 February 2017 diff hist 0 m Where to Find Construction and Materials Functions current
- 10:29, 22 February 2017 diff hist -277 m Category:610 Masonry Construction Laboratory Testing Guidelines EPG 610 Masonry Construction Lab Testing Guidelines was virtually unchanged from its original Aug 2007 form. It had about 7385 hits. current
- 10:22, 22 February 2017 diff hist +93 m Category:600 INCIDENTAL CONSTRUCTION Per DE, moved EPG 610 to EPG 647. Now that there is a Sec 610, moved this info to make room for potential EPG info related to the new Sec 610.
- 10:21, 22 February 2017 diff hist +860 Nm Category:647 Masonry Construction Laboratory Testing Guidelines Per DE, moved EPG 610 to EPG 647. Now that there is a Sec 610, moved this info to make room for potential EPG info related to the new Sec 610.
- 16:09, 21 February 2017 diff hist -310 m Main Page EPG 104.7
- 16:04, 21 February 2017 diff hist 0 N File:Fig 104.7 2017.doc
- 16:03, 21 February 2017 diff hist 0 m 104.7 Scoping Estimates Per Estimating and Bidding, updated Cost Estimate Guide for rural preliminary design
- 14:46, 21 February 2017 diff hist +1 m Main Page
- 13:27, 21 February 2017 diff hist -64 m 236.13 Designing Right of Way Plans updated links
- 13:24, 21 February 2017 diff hist +11 m Category:101 Standard Forms updated link
- 13:22, 21 February 2017 diff hist -118 m 238.2 Land Surveying updated links
- 15:49, 17 February 2017 diff hist 0 m Main Page
- 11:55, 17 February 2017 diff hist +29 m LPA:136.11 Local Public Agency Construction →136.11.6 Information Posters: Per Cm, updated checklist link
- 11:53, 17 February 2017 diff hist -28 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.11.13
- 11:52, 17 February 2017 diff hist -28 m LPA:136.11 Local Public Agency Construction Per CM, updated checklist link
- 11:51, 17 February 2017 diff hist -28 m Category:110 State and Federal Wage Rates and Other Requirements →110.2 Federal-Aid Projects (Guidance for Sec 110.2): Per CM, updated checklist link
- 10:40, 17 February 2017 diff hist +40 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR, updated checklist link
- 10:38, 17 February 2017 diff hist +78 m LPA:136.11 Local Public Agency Construction Per ECR, updated checklist link
- 10:37, 17 February 2017 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links
- 10:36, 17 February 2017 diff hist +77 m LPA:136.12 Figures, Glossary and Other Useful Links Per ECR, updated link
- 10:09, 17 February 2017 diff hist +13 m Main Page EPG 236.7.4.5
- 10:06, 17 February 2017 diff hist -1,203 m 236.7 Negotiation →236.7.4.5 Subordination of Mortgage Liens: Per RW, updated guidance to our current practices
- 09:49, 17 February 2017 diff hist +139 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent
- 09:49, 17 February 2017 diff hist +139 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 09:45, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.5 Hammer Head Type
- 09:45, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.3 Web Beam
- 09:43, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 08:40, 17 February 2017 diff hist +1 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections
- 08:23, 17 February 2017 diff hist -49 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Removed, per BR
- 08:21, 17 February 2017 diff hist +201 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per BR, sentence inadvertently omitted from previous revision.
- 16:06, 16 February 2017 diff hist +214 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) Per TS, inserted link
- 15:51, 15 February 2017 diff hist -1 m LPA:136 Local Public Agency (LPA) Policy
- 14:47, 15 February 2017 diff hist +441 m Main Page EPG 616.6, EPG 902.4, EPG 127.29, EPG 751.9
- 14:04, 15 February 2017 diff hist +107 m 616.8 Typical Applications (MUTCD 6H)
- 14:02, 15 February 2017 diff hist 0 N File:616.8.50 2017.pdf
- 14:01, 15 February 2017 diff hist 0 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, implement Work Zone No Phone Zone Signs. TA-50 updated.
- 13:45, 15 February 2017 diff hist 0 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections
- 13:43, 15 February 2017 diff hist 0 N File:751.9.3.1.7.6 2017.jpg current
- 13:42, 15 February 2017 diff hist 0 N File:751.9.3.1.7.4 2017.jpg current
- 13:42, 15 February 2017 diff hist +11 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:31, 15 February 2017 diff hist -660 751.50 Standard Detailing Notes Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:18, 15 February 2017 diff hist 0 N File:751.35.4.3 2017.jpg current
- 13:18, 15 February 2017 diff hist +205 751.35 Concrete Pile Cap Integral End Bents →751.35.4 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:12, 15 February 2017 diff hist +94 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:09, 15 February 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents
- 13:08, 15 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents
- 13:07, 15 February 2017 diff hist 0 m 751.24 LFD Retaining Walls
- 13:05, 15 February 2017 diff hist 0 m 751.10 General Superstructure
- 13:05, 15 February 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy-Coated Reinforcement Requirements
- 13:04, 15 February 2017 diff hist 0 m 751.8 LRFD Concrete Box Culverts
- 13:03, 15 February 2017 diff hist +172 751.32 Concrete Pile Cap Intermediate Bents →751.32.4 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:59, 15 February 2017 diff hist 0 m 751.8 LRFD Concrete Box Culverts →751.8.1.1 Material Properties
- 12:47, 15 February 2017 diff hist +74 m 751.31 Open Concrete Intermediate Bents
- 12:40, 15 February 2017 diff hist +4 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 12:39, 15 February 2017 diff hist +8 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 12:39, 15 February 2017 diff hist +16 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 12:37, 15 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 12:36, 15 February 2017 diff hist 0 N File:751.31 part elev.jpg current
- 12:36, 15 February 2017 diff hist +831 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:21, 15 February 2017 diff hist +240 751.24 LFD Retaining Walls Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:17, 15 February 2017 diff hist -335 751.10 General Superstructure →751.10.1.8 Epoxy Coated Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:16, 15 February 2017 diff hist -199 751.8 LRFD Concrete Box Culverts →751.8.1.1 Material Properties: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:11, 15 February 2017 diff hist +2,007 751.5 Structural Detailing Guidelines →751.5.9.2 Reinforcing Steel: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 11:49, 15 February 2017 diff hist -64 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.3.1 Preventive Maintenance
- 11:47, 15 February 2017 diff hist +1,079 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.3 Signal Maintenance: Per TS, updated signal related preventive maintenance & inspection processes.
- 11:29, 15 February 2017 diff hist -1,459 902.4 Signal Installations and Equipment Per TS, updated signal related preventive maintenance & inspection processes. Cycle of controller & cabinet replacement lengthened from 15 years to 20; LED signal indications replacement extended
- 11:11, 15 February 2017 diff hist 0 N File:127.29.8 map 2017.jpg current
- 11:11, 15 February 2017 diff hist +4,039 127.29 Stormwater Per Env'l, new permit language and corresponding requirements. Also adds to the public involvement process as required to allow input on new permits.
- 10:59, 15 February 2017 diff hist +15 m 127.25 Maintenance Environmental Policies updated link
- 10:44, 15 February 2017 diff hist +733 Category:129 Public Involvement Per Env'l, new public involvement process as required to allow input on new stormwater permits.
- 10:21, 15 February 2017 diff hist 0 N File:616.6.51.3.jpg current
- 10:21, 15 February 2017 diff hist +1,098 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Project Signs: Per TS, implement Work Zone No Phone Zone Signs
- 09:35, 14 February 2017 diff hist +518 m Category:134 Engineering Professional Services updated links
- 16:04, 10 February 2017 diff hist -2 m Main Page
- 11:39, 10 February 2017 diff hist +25 m Main Page EPG 751.10.4
- 11:36, 10 February 2017 diff hist +332 m 751.50 Standard Detailing Notes →H4. Conduit System: Per BR, added H4.11 and H4.12 (renumbereing previous H4.11 as H4.13) to clarify deflection fitting and expansion fitting requirements.
- 11:27, 10 February 2017 diff hist 0 m 751.10 General Superstructure →751.10.4 Conduit Systems
- 11:22, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits.jpg current
- 11:22, 10 February 2017 diff hist 0 N File:751.10.4 Section through Safety Barrier Curb 2017.jpg current
- 11:21, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb over Slab 2017.jpg current
- 11:20, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Safety Barrier Section BB.jpg current
- 11:20, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Safety Barrier 2017.jpg current
- 11:19, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Wing Section 2017.jpg current
- 11:19, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Wing 2017.jpg current
- 11:18, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb Detail B.jpg current
- 11:18, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb Detail A.jpg current
- 11:17, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb 2017.jpg current
- 11:16, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box.jpg current
- 11:16, 10 February 2017 diff hist 0 m 751.10 General Superstructure →751.10.4 Conduit Systems
- 11:14, 10 February 2017 diff hist 0 N File:751.10.4 Part Section Suspended Conduit Detail A.jpg current
- 11:13, 10 February 2017 diff hist 0 N File:751.10.4 Part Section Suspended Conduit.jpg current
- 11:12, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits in Deepened Slab 2017.jpg current
- 11:12, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits in Safety Barrier 2017.jpg current
- 11:10, 10 February 2017 diff hist 0 N File:751.10.4 Single Conduit in safety barrier curb.jpg current
- 11:10, 10 February 2017 diff hist 0 N File:751.10.4 Single Conduit in slab.jpg current
- 11:09, 10 February 2017 diff hist +3,377 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, clarified deflection fitting and expansion fitting requirements. Updated figures.
- 15:21, 9 February 2017 diff hist -440 m Main Page EPG 751.40.2.3
- 13:52, 9 February 2017 diff hist -1 m 751.40 LFD Widening and Repair →751.40.2.3.1 Formed and Unformed Repair Areas
- 13:49, 9 February 2017 diff hist 0 N File:751.40.2.3.1.2.jpg current
- 13:47, 9 February 2017 diff hist 0 N File:751.40.2.3.1.1.jpg current
- 13:47, 9 February 2017 diff hist +148 m 751.40 LFD Widening and Repair →751.40.2.3 Substructure Repair: Per BR, clarified formed and unformed repair areas
- 15:18, 8 February 2017 diff hist +82 m Category:134 Engineering Professional Services updated link to SharePoint
- 09:41, 8 February 2017 diff hist +123 m Category:134 Engineering Professional Services
- 09:30, 8 February 2017 diff hist -19 m Category:101 Standard Forms →Design Forms: updated links to SharePoint
- 09:27, 8 February 2017 diff hist +374 m Category:134 Engineering Professional Services updated links to SharePoint
- 14:43, 7 February 2017 diff hist 0 N File:Main Page 2 February 7, 2017.jpg current
- 14:42, 7 February 2017 diff hist 0 N File:Main Page February 7, 2017.jpg current
- 14:41, 7 February 2017 diff hist +638 m Main Page
- 09:08, 7 February 2017 diff hist +156 751.50 Standard Detailing Notes →G3. Vertical Drain at End Bent: Per BR, increased the drainage behind end bents to improve performance and reduce future maintenance.
- 14:33, 6 February 2017 diff hist -14 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.2 Procedure: Per CM, updated links
- 13:41, 6 February 2017 diff hist 0 m Main Page 40,000,000 hits, as of 2/3/17