User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:34, 26 April 2022 diff hist +916 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions: Per CM, moved safety and sanitary guidance from EPG 616.18 to EPG 107.4
- 13:39, 26 April 2022 diff hist -11 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated verbiage to come in line with USDOL verbiage
- 09:17, 26 April 2022 diff hist +137 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG Checking For Unauthorized Sample Records
- 12:27, 25 April 2022 diff hist +33 m 102.2 Contractor Performance Rating System →102.2.5 Contractor Recognition: Per CM, clarified the conditions for contractors to receive an award based on their contractor performance rating
- 15:13, 22 April 2022 diff hist 0 N File:236.16.2 April 2022 map.jpg current
- 15:13, 22 April 2022 diff hist +6 m 236.16 Outdoor Advertising Per ODA, further updated contact info and map
- 14:51, 22 April 2022 diff hist +40 m 642.8 Sidewalk Design Criteria Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:48, 22 April 2022 diff hist +40 m Category:150 Quality Management Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:37, 22 April 2022 diff hist +40 m LPA:136.12 Figures, Glossary and Other Useful Links Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:36, 22 April 2022 diff hist +80 m LPA:136.11 Local Public Agency Construction Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:34, 22 April 2022 diff hist +80 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 14:30, 22 April 2022 diff hist +40 m Category:101 Standard Forms →Construction and Materials: Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 15:13, 21 April 2022 diff hist -126 m Recent Policy Changes in the EPG EPG 712.1.4
- 14:43, 21 April 2022 diff hist -374 m Category:712 Structural Steel Construction →712.1.4 Welding: Per BR, removed archaic references to field welder cards. Added language for stud welding to match Sec 712.6.3.
- 14:17, 20 April 2022 diff hist -435 m Recent Policy Changes in the EPG
- 14:01, 20 April 2022 diff hist +538 m Recent Policy Changes in the EPG EPG 137
- 13:54, 20 April 2022 diff hist +32 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, revision briefly updates information about how CM Division stores electronic contract document.
- 13:07, 20 April 2022 diff hist -30 m 127.29 Stormwater →127.29.4.3 MCM 3: Illicit Discharge Detection and Elimination (IDDE) Program: Per Env'l, updated broken link
- 10:59, 20 April 2022 diff hist -314 m Recent Policy Changes in the EPG EPG 903.3.4.3
- 10:47, 20 April 2022 diff hist +895 m Recent Policy Changes in the EPG EPG 802, EPG 805, EPG 806.1, EPG 806.8
- 10:30, 20 April 2022 diff hist +36 m Category:805 Seeding →805.2.3 Construction Requirements (Sec 805.3): added link current
- 09:11, 20 April 2022 diff hist +1,205 m Recent Policy Changes in the EPG EPG 612, 616.6, 616.18, 616.19, 616.23, 617.1, 617.2, 1063, 1064
- 08:37, 20 April 2022 diff hist +60 m Recent Policy Changes in the EPG EPG 403.1.19
- 08:36, 20 April 2022 diff hist +21 m Category:403 Asphaltic Concrete Pavement
- 13:43, 19 April 2022 diff hist -662 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.6.3 Erosion Control Measures: Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 13:39, 19 April 2022 diff hist 0 m 806.2 Sediment Control Measures updated link
- 13:38, 19 April 2022 diff hist -2 m 806.1 Erosion Control Measures updated link
- 13:36, 19 April 2022 diff hist -6 m 750.6 Erosion Control and Energy Dissipation updated links
- 13:27, 19 April 2022 diff hist -166 806.1 Erosion Control Measures Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 12:49, 19 April 2022 diff hist +2 m Category:805 Seeding
- 12:43, 19 April 2022 diff hist +9,214 Category:805 Seeding Guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. New guidance for cool season and warm season grasses is available. A new seed species picture guide is available in EPG 805.2.4 Acceptance to assist with general inspection and acceptance of vegetative covers.
- 12:27, 19 April 2022 diff hist +1,642 Category:802 Mulching Per Env'l, guidance for mulching reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses. current
- 11:22, 19 April 2022 diff hist +424 Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per CM, the maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots.
- 11:09, 19 April 2022 diff hist -306 903.3 Ground-Mounted Sign Supports Per TS, in EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST), guidance for PSST anchor installations has been updated and clarified.
- 10:37, 19 April 2022 diff hist -38 Category:1064 Temporary Concrete Traffic Barrier Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 10:36, 19 April 2022 diff hist +13 Category:1063 Temporary Traffic Control Devices Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 10:34, 19 April 2022 diff hist -1,503 617.2 Construction Inspection Guidelines for Sec 617 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.
- 10:29, 19 April 2022 diff hist +36 617.1 Temporary Traffic Barriers Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:17, 19 April 2022 diff hist -217 616.23 Traffic Control for Field Operations →616.23.2.5 Temporary Traffic Control Devices: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:15, 19 April 2022 diff hist -2 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.15 Traffic Management
- 10:12, 19 April 2022 diff hist -208 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.7 Changeable Message Sign/Flashing Arrow Panels/Traffic Signals: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:09, 19 April 2022 diff hist -125 616.18 Construction Inspection Guidelines for Sec 616 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 10:04, 19 April 2022 diff hist -632 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:56, 19 April 2022 diff hist -3 Category:612 Impact Attenuators Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 14:31, 18 April 2022 diff hist +167 m Recent Policy Changes in the EPG EPG 236.7
- 14:26, 18 April 2022 diff hist +1,138 m 236.7 Negotiation Per RW, additional guidance for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.
- 08:01, 18 April 2022 diff hist 0 N File:236.16.2 2022 map.jpg current
- 08:00, 18 April 2022 diff hist -16 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: Per ODA, updated contact info and map
- 14:42, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review →236.6.3.3 Waiver Valuation: Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.
- 14:38, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.
- 12:39, 14 April 2022 diff hist -19,511 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, moved contents to EPG 105.16 current Tag: Replaced
- 11:23, 14 April 2022 diff hist +19,826 m Category:105 Control of Work →105.16 Controversies and Claims for Adjustment (Sec 105.16): Per CM, moved content of EPG 113 Construction Inspection Guidance for Contractor's Claims to EPG 105.16
- 10:29, 14 April 2022 diff hist -11 m 903.5 Regulatory Signs →903.5.20 DO NOT ENTER Sign (R5-1) (MUTCD Section 2B.37): minor correction
- 09:23, 13 April 2022 diff hist 0 N File:905.2.14.2.5.jpg current
- 09:22, 13 April 2022 diff hist -45 m 905.2 Traffic Studies Per TS, updated text to current verbiage by changing "accidents" to "crashes", "SWAR" changed to "SWCR" and "AR" to "CR". current
- 10:44, 12 April 2022 diff hist +1 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19)
- 10:26, 12 April 2022 diff hist +8 m Category:126 Location Study and Alternatives Analysis Per Env'l, replaced CE2 Form with existing example version of CE3 Form. Also, updated archaic dot file to dotx
- 07:22, 12 April 2022 diff hist +27 m 751.22 Prestressed Concrete I Girders →751.22.2.5 Pretensioned Anchorage Zones: minor cosmetic revisions
- 14:45, 11 April 2022 diff hist -30 m Category:1011 Geotextile Per MT, updated link current
- 14:30, 11 April 2022 diff hist -246 m Recent Policy Changes in the EPG EPG 751.22
- 13:59, 11 April 2022 diff hist 0 N File:751.22.3.2.6 2022.jpg current
- 13:57, 11 April 2022 diff hist 0 N File:751.22.3.2.5 2022.jpg current
- 13:53, 11 April 2022 diff hist 0 N File:751.22.3.2.4 2022.jpg current
- 13:51, 11 April 2022 diff hist 0 N File:751.22.3.2.3 2022.jpg current
- 13:49, 11 April 2022 diff hist 0 N File:751.22.3.2.2 2022.jpg current
- 13:44, 11 April 2022 diff hist 0 N File:751.22.3.2.1 2022.jpg current
- 13:40, 11 April 2022 diff hist 0 N File:751.22.2.5 2022.jpg current
- 13:34, 11 April 2022 diff hist +1,487 m 751.22 Prestressed Concrete I Girders Per BR, revision allows a larger number of bonded strands for many of these girders, effectively increasing the span limits for these girders. Expanded guidance in EPG 751.22.3.2 to eliminate or reduce conflict between lowest middle two strands and the B bars.
- 10:31, 11 April 2022 diff hist 0 m 642.8 Sidewalk Design Criteria minor update to ADA Checklist links
- 10:30, 11 April 2022 diff hist -1 m Category:150 Quality Management minor update to ADA Checklist links
- 10:29, 11 April 2022 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: minor update to ADA Checklist links
- 10:28, 11 April 2022 diff hist 0 m LPA:136.11 Local Public Agency Construction minor update to ADA Checklist links
- 10:27, 11 April 2022 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) minor update to ADA Checklist links
- 10:25, 11 April 2022 diff hist 0 m Category:101 Standard Forms →Construction and Materials: minor update to ADA Checklist link
- 07:10, 11 April 2022 diff hist -157 m 171.4 Shoulders and Approaches →S&A(C2) Culvert Ends: updated broken std plan links
- 15:19, 6 April 2022 diff hist +2 m 153.20 Right of Way Per RW and CCO, minor updates to RW51 contract requirements. This agreement should include the approval as to form and attestation signature.
- 12:40, 6 April 2022 diff hist +6 m Category:101 Standard Forms →Bridge
- 12:39, 6 April 2022 diff hist +79 m Category:101 Standard Forms →Bridge: Per BR, updated link to Culvert Hydraulics Report
- 15:16, 5 April 2022 diff hist +24 m Recent Policy Changes in the EPG EPG 127.2.5
- 15:11, 5 April 2022 diff hist +386 m 127.2 Historic Preservation and Cultural Resources →127.2.5 Approximate Timelines for Section 106 Compliance: Per Env'l, Clarifying the timelines for completing the Section 106 of the National Historic Preservation Act review process
- 14:38, 5 April 2022 diff hist -46 m 642.8 Sidewalk Design Criteria Per CM, updated links to ADA Checklist
- 14:37, 5 April 2022 diff hist -46 m Category:150 Quality Management Per CM, updated links to ADA Checklist
- 14:36, 5 April 2022 diff hist -46 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, updated links to ADA Checklist
- 14:35, 5 April 2022 diff hist -92 m LPA:136.11 Local Public Agency Construction Per CM, updated links to ADA Checklist
- 14:33, 5 April 2022 diff hist -92 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, updated links to ADA Checklist
- 14:31, 5 April 2022 diff hist -46 m Category:101 Standard Forms →Construction and Materials: Per CM, updated ADA Checklist links
- 12:17, 5 April 2022 diff hist +95 m Category:940 Access Management Per TS, updated link to "Managing Access to Missouri's Highways" brochure current
- 11:30, 5 April 2022 diff hist -28 m 642.8 Sidewalk Design Criteria
- 10:52, 5 April 2022 diff hist +191 m 642.8 Sidewalk Design Criteria Per CM, minor revisions to the ADA Checklist
- 10:51, 5 April 2022 diff hist +152 m Category:150 Quality Management Per CM, minor revisions to the ADA Checklist
- 10:48, 5 April 2022 diff hist +198 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per CM, minor revisions to ADA Checklist
- 10:45, 5 April 2022 diff hist +11 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.10 ADA Checklist
- 10:44, 5 April 2022 diff hist +401 m LPA:136.11 Local Public Agency Construction Per CM, minor revisions to the ADA Checklist
- 10:36, 5 April 2022 diff hist +347 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, minor revisions to the ADA Checklist
- 10:21, 5 April 2022 diff hist +149 m Category:101 Standard Forms →Construction and Materials: Per CM, minor revisions to ADA Checklist
- 12:16, 4 April 2022 diff hist +208 m Category:105 Control of Work →105.16 Controversies and Claims for Adjustment (Sec 105.16): Per CM, minor clarification
- 11:13, 1 April 2022 diff hist -17 m Help Article →Division Contacts
- 14:30, 31 March 2022 diff hist 0 N File:202.1 detonation.docx current
- 14:30, 31 March 2022 diff hist +244 m Category:202 Removal of Buildings and Structures added "Detonating an I-35 ramp bridge" current
- 13:21, 29 March 2022 diff hist 0 N File:127.13 Soundwall brochure.pdf current
- 13:20, 29 March 2022 diff hist +64 m 127.13 Noise Per Env'l, added Sound Wall brochure for general information
- 07:14, 29 March 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.5 Camber, Haunching and Girder Steps: updated link
- 15:21, 28 March 2022 diff hist +23 m Recent Policy Changes in the EPG
- 15:20, 28 March 2022 diff hist +33 m Recent Policy Changes in the EPG EPG 751.50
- 15:15, 28 March 2022 diff hist -373 m 751.50 Standard Detailing Notes Per BR, removed references to web coil ties in bulb-tee and NU girders
- 13:30, 28 March 2022 diff hist +1 m Category:101 Standard Forms →Materials Related: Per CM, updated broken link
- 13:27, 21 March 2022 diff hist -38 m 616.18 Construction Inspection Guidelines for Sec 616 →Safety Requirements (for Sec 616.3): deleted outdated photo of PPE
- 11:04, 18 March 2022 diff hist +5 m Help Article →EPG Ballot Cycles
- 11:03, 18 March 2022 diff hist +3 m Help Article →EPG Ballot Cycles
- 11:02, 18 March 2022 diff hist -21 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist +19 m Help Article →EPG Ballot Cycles
- 11:01, 18 March 2022 diff hist -19 m Help Article →EPG Ballot Cycles: updated schedule
- 08:25, 17 March 2022 diff hist -190 m 643.2 Local Utility Adjustments - Public and Private updated broken links
- 08:17, 17 March 2022 diff hist -36 643.4 Railroads updated broken links
- 15:19, 16 March 2022 diff hist -9 m Recent Policy Changes in the EPG
- 15:17, 16 March 2022 diff hist +75 m Recent Policy Changes in the EPG EPG 109.11
- 15:08, 16 March 2022 diff hist +4,839 m Category:109 Measurement and Payment →109.11 Compensation for Project Delays (for Sec 109.11): Per CM, expanded guidance to produce more uniform administration of delay claims
- 12:59, 16 March 2022 diff hist -969 m 106.17 New Product Evaluation Per CM, deleted archaic info in "How MoDOT Employees Report Product Tests" and updated the location of the New Products Coordinator from Organizational Results to Construction and Materials.
- 11:22, 14 March 2022 diff hist -14 m 1045.5 Policy on Color of Structural Steel Paint updated link current
- 10:15, 14 March 2022 diff hist +13 m Category:1029 Fabricating Prestressed Concrete Members for Bridges updated broken link
- 14:37, 11 March 2022 diff hist +275 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.16
- 14:35, 11 March 2022 diff hist 0 N File:136.9.4.1.1.16 Training.docx current
- 14:34, 11 March 2022 diff hist -35 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.16 On the Job Training (OJT) (23 CFR Section 230): Per LPA, updated training provision link with the current training provision.
- 08:43, 11 March 2022 diff hist -100 m Help Article updated link
- 08:38, 11 March 2022 diff hist +100 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design: updated link current
- 08:25, 11 March 2022 diff hist +8 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 08:21, 11 March 2022 diff hist +11 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 08:14, 11 March 2022 diff hist +44 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices: updated links
- 15:55, 10 March 2022 diff hist -242 m Category:1180 Bituminous Stockpile Patching Material current
- 14:37, 10 March 2022 diff hist 0 N File:Table 805.2.4a.docx current
- 14:37, 10 March 2022 diff hist +242 m Category:1180 Bituminous Stockpile Patching Material
- 16:19, 9 March 2022 diff hist -241 m Category:1180 Bituminous Stockpile Patching Material
- 16:18, 9 March 2022 diff hist 0 N File:Table 805.2.4.docx current
- 16:18, 9 March 2022 diff hist +241 m Category:1180 Bituminous Stockpile Patching Material
- 15:51, 9 March 2022 diff hist +268 m LPA:136.13 LPA Policy Changes EPG 136.2
- 15:45, 9 March 2022 diff hist +10 m LPA:136.2 Certification and Training Per LPA, updated LPA training requirements to current practice current
- 15:32, 9 March 2022 diff hist +158 m LPA:136.1 Introduction →136.1.2.1.1 Requirements: Per LPA, updated LPA training requirements
- 15:30, 8 March 2022 diff hist +186 m LPA:136.13 LPA Policy Changes EPG 136.3.13
- 15:27, 8 March 2022 diff hist +97 m LPA:136.3 Federal Aid Basics →136.3.13 Agreements: Per LPA, removed archaic requirment to submit 7 copies of the program agreement
- 12:04, 8 March 2022 diff hist +13 m 905.2 Traffic Studies updated broken link
- 08:55, 8 March 2022 diff hist +11 m 901.16 Construction Inspection Guidelines for Sec 901 updated archaic link current
- 14:22, 3 March 2022 diff hist +41 m 903.3 Ground-Mounted Sign Supports clarification
- 13:40, 3 March 2022 diff hist 0 m 320.1 Preliminary Geotechnical Report →320.1.4.2 Example for the Summary for Preliminary Geotechnical Report - Form M-41
- 13:39, 3 March 2022 diff hist 0 N File:320.1.4.2 M-41 Example.jpg current
- 13:39, 3 March 2022 diff hist 0 N File:320.1 M-41.docx current
- 13:38, 3 March 2022 diff hist +136 m 320.1 Preliminary Geotechnical Report Per CM, provided updated Summary for Preliminary Geotechnical Report (Form M-41) and example of M-41
- 08:55, 3 March 2022 diff hist -10 m 236.8 Relocation Assistance Program updated links
- 08:36, 3 March 2022 diff hist 0 m 236.7 Negotiation updated links
- 16:25, 2 March 2022 diff hist +106 m 903.3 Ground-Mounted Sign Supports updated links
- 15:42, 1 March 2022 diff hist +17 Category:129 Public Involvement updated broken link
- 15:41, 1 March 2022 diff hist +68 m 236.7 Negotiation updated broken links
- 15:32, 1 March 2022 diff hist -12 m Category:132 Safety updated broken link
- 15:27, 1 March 2022 diff hist -70 m Category:132 Safety updated broken links
- 13:37, 1 March 2022 diff hist +13 m Category:107 Legal Relations and Responsibility to the Public updated broken link
- 13:30, 1 March 2022 diff hist +13 m 106.19 Materials Acceptance updated broken link current
- 15:30, 28 February 2022 diff hist -2 m Category:150 Quality Management Per EPS, replaced old ADA Checklist with current version
- 15:28, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.13.5 American’s with Disabilities Act (ADA) Check List: Per EPS, replaced old ADA Checklist with current version
- 15:27, 28 February 2022 diff hist +5 m LPA:136.11 Local Public Agency Construction →136.11.4 Preconstruction Conference: Per EPS, replaced old ADA Checklist with current version
- 13:58, 28 February 2022 diff hist -869 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, deleted archaic time and personnel reports guidance
- 15:53, 25 February 2022 diff hist -373 m 106.1 Source of Supply and Quality Requirements deleted archaic info
- 15:52, 25 February 2022 diff hist -2 m 106.1 Source of Supply and Quality Requirements updated broken link
- 14:55, 25 February 2022 diff hist +31 m Category:105 Control of Work updated broken link
- 14:42, 25 February 2022 diff hist +13 m 104.13 Construction Inspection Guidance for Sec 104 updated broken link current
- 14:15, 25 February 2022 diff hist -11 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes
- 14:09, 25 February 2022 diff hist 0 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) →104.12.2 Significant Scope Changes: updated link
- 14:08, 25 February 2022 diff hist +13 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated broken link
- 13:30, 25 February 2022 diff hist -57 m Category:134 Engineering Professional Services updated broken link
- 13:06, 25 February 2022 diff hist -165 m 238.2 Land Surveying Per CC and RW, deleted archaic RW11, Crop Damage Compensation Agreement and Release
- 11:51, 25 February 2022 diff hist +44 m 238.2 Land Surveying updated broken link
- 11:42, 25 February 2022 diff hist +11 m 238.1 Aerial Mapping and LiDAR Surveys updated broken link
- 09:41, 25 February 2022 diff hist -100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, deleted archaic "Work Zone Inspection Sheet"
- 13:22, 24 February 2022 diff hist 0 N File:127.14.3.5 secure 2022.pdf current
- 13:16, 24 February 2022 diff hist +5 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents →127.14.3.5 FHWA/MoDOT Environmental Partnering Agreement: Per Env'l, replaced older document with the 2022 FHWA/MoDOT Environmental Partnering Agreement
- 15:31, 23 February 2022 diff hist 0 N File:101 Bridge Hydraulics Report Feb 2022.dotx current
- 15:31, 23 February 2022 diff hist +4 m Category:101 Standard Forms →Bridge: Per BR, minor revision to Bridge Hydraulics Report
- 14:48, 23 February 2022 diff hist +100 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, moved "Work Zone Inspection Sheet" from EPG Work Zone Safety and Mobility Policy Resources
- 13:55, 23 February 2022 diff hist +12 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, minor update for Fig. 136.4.10 LPA Consultant Services Invoice
- 08:53, 23 February 2022 diff hist -72 m 902.12 Flashing Beacons (MUTCD Chapter 4L) updated broken links current
- 08:43, 23 February 2022 diff hist -52 m 821.9 Labels and Safety Data Sheets (SDS) Per SM, deleted archaic SDS Chemicals link current
- 16:11, 22 February 2022 diff hist +16 m Category:821 Herbicides and Roadsides updated broken link current
- 16:07, 22 February 2022 diff hist +16 m Category:808 Planting Trees, Shrubs, and Other Plants updated broken link current
- 14:40, 22 February 2022 diff hist -39 m 751.5 Structural Detailing Guidelines →751.5.1.7 Contract Addendums and Construction Changes: updated broken link
- 13:53, 22 February 2022 diff hist -41 m 643.3 Policy, Standards and Regulations updated broken link
- 11:03, 22 February 2022 diff hist -27 m Category:101 Standard Forms →Bridge: uploaded structural rehabilitation checklist file to replace broken link
- 11:01, 22 February 2022 diff hist -54 m Category:747 Bridge Reports and Layouts uploaded structural rehabilitation checklist file to replace broken link
- 10:56, 22 February 2022 diff hist -27 m 751.1 Preliminary Design uploaded structural rehabilitation checklist file to replace broken link
- 10:54, 22 February 2022 diff hist 0 N File:751.1.3.2 Structural Rehabilitation Checklist.xlsm current
- 10:53, 22 February 2022 diff hist -27 m 751.1 Preliminary Design →751.1.3.2 Documentation: uploaded structural rehabilitation checklist file to replace broken link
- 08:46, 22 February 2022 diff hist +6 m Category:133 Snow and Ice Control →Winter Operations Communication Plan
- 08:43, 22 February 2022 diff hist +185 m Category:133 Snow and Ice Control →Winter Operations Communication Plan: updating broken links
- 16:09, 18 February 2022 diff hist +13 m Category:612 Impact Attenuators updated broken link
- 16:06, 18 February 2022 diff hist +8 m Category:612 Impact Attenuators updated broken link
- 15:23, 18 February 2022 diff hist -8 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated broken link
- 14:52, 18 February 2022 diff hist +92 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: updated broken links
- 14:37, 18 February 2022 diff hist +18 m Category:133 Snow and Ice Control →Winter Operations Communication Plan: update broken link
- 14:04, 18 February 2022 diff hist +13 m 616.13 Work Zone Capacity, Queue and Travel Delay updated broken link
- 13:57, 18 February 2022 diff hist +32 m 238.3 Route Surveying updated broken link current
- 13:18, 18 February 2022 diff hist +51 m 141.3 Local Funding Options updated broken links current
- 13:11, 18 February 2022 diff hist +24 m Category:202 Removal of Buildings and Structures updated broken links
- 13:04, 18 February 2022 diff hist +11 m Demolition and Removal of Improvements updated broken link current
- 12:25, 18 February 2022 diff hist +61 m Category:127 MoDOT and the Environment updated broken link current
- 12:22, 18 February 2022 diff hist +11 m 607.2 Plans updated broken link current
- 12:18, 18 February 2022 diff hist +11 m 237.12 Communication with the Public updated broken link current
- 12:14, 18 February 2022 diff hist +11 m 643.1 Utilities - Status Letter updated broken link
- 12:04, 18 February 2022 diff hist +16 m 106.11 Metric Implementation updated broken link current
- 12:00, 18 February 2022 diff hist +16 m Category:1015 Bituminous Material updated broken link current
- 11:55, 18 February 2022 diff hist +16 m 320.6 Slide Investigations updated broken link current
- 11:51, 18 February 2022 diff hist +16 m Category:904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection updated broken link current
- 11:44, 18 February 2022 diff hist +16 m 127.20 Stream Stewardship Trust Fund in-Lieu Fee Mitigation Program updated broken link current
- 11:23, 18 February 2022 diff hist +10 m Category:1038 Bearing Pads for Structures updated broken links current
- 11:17, 18 February 2022 diff hist +5 m Category:1037 Shear Connectors updated broken link current
- 10:58, 18 February 2022 diff hist +42 m 171.5 Drainage updated broken links current
- 10:50, 18 February 2022 diff hist +58 m Category:139 Design - Build updated broken links
- 09:46, 18 February 2022 diff hist +33 m Category:235 Preliminary Plans updated broken links
- 09:35, 18 February 2022 diff hist +13 m 147.3 Job Order Contracting (JOC) updated broken link
- 09:20, 18 February 2022 diff hist +74 m Category:126 Location Study and Alternatives Analysis updated broken links
- 09:01, 18 February 2022 diff hist +13 m 144.5 Pavement Maintenance updated broken link
- 16:18, 17 February 2022 diff hist +18 m 643.4 Railroads updated broken links
- 16:04, 17 February 2022 diff hist +13 m 320.3 Drilling Operations updated broken link
- 15:51, 17 February 2022 diff hist +21 m Category:122 Aviation updated broken links current
- 13:13, 17 February 2022 diff hist +65 m Category:109 Measurement and Payment updated several broken links
- 12:27, 17 February 2022 diff hist +13 m Category:613 Pavement Repair updated broken link
- 12:19, 17 February 2022 diff hist +13 m Category:619 Pavement Edge Treatment updated broken link current
- 12:13, 17 February 2022 diff hist +13 m Category:206 Excavation for Structures updated broken link
- 12:02, 17 February 2022 diff hist +13 m 131.2 Proprietary Items and Public Interest Findings updated broken link
- 11:59, 17 February 2022 diff hist +13 m 106.1 Source of Supply and Quality Requirements updated several broken links
- 11:46, 17 February 2022 diff hist +38 m Category:108 Prosecution and Progress updated several broken links
- 11:37, 17 February 2022 diff hist +88 m Category:105 Control of Work updated several broken links
- 15:18, 16 February 2022 diff hist -176 m Category:101 Standard Forms →Contracts: deleted archaic links to DE contract
- 14:11, 16 February 2022 diff hist +163 m Category:101 Standard Forms →Construction and Contractor Related: Per CM, "Contractor's Affidavit Regarding Settlement of Claims (C-242) with Exceptions" now available
- 12:17, 16 February 2022 diff hist +64 m Recent Policy Changes in the EPG EPG 902.4
- 12:05, 16 February 2022 diff hist -2 m 902.4 Signal Installations and Equipment →902.4.2.1 Controller and Cabinet Replacement Program: Per TS, updated signal cabinet recommended replacement age to 25 years from 20 years
- 09:33, 16 February 2022 diff hist -31 m Category:109 Measurement and Payment →Contractor's Affidavit Regarding Settlement of Claims (C-242): updated C-242 link
- 16:14, 15 February 2022 diff hist +43 m 751.50 Standard Detailing Notes →J1. General: Per BR, Note J1.13 clarified
- 15:35, 15 February 2022 diff hist +88 m Recent Policy Changes in the EPG EPG 236.7.2.18 and EPG 236.11.1.3
- 15:27, 15 February 2022 diff hist +2 m 236.11 Mediation →236.11.1.3 Purpose
- 15:27, 15 February 2022 diff hist +274 m 236.7 Negotiation →236.7.2.19 Acquisition by Mediation: Per RW, updated mediation guidance to reflect current process and procedures, including the MoDOT Impasse Letter
- 14:57, 15 February 2022 diff hist 0 N File:236.11.1.3 Impasse.docx current
- 14:57, 15 February 2022 diff hist +272 m 236.11 Mediation →236.11.1.3 Purpose: Per RW, updated mediation guidance to reflect current process and procedures, including the MoDOT Impasse Letter
- 14:52, 15 February 2022 diff hist 0 m 236.11 Mediation →236.11.1.1 Authority
- 13:44, 15 February 2022 diff hist -112 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Work Zone Transportation Management Plan: updated links
- 13:11, 15 February 2022 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties
- 13:08, 15 February 2022 diff hist 0 N File:751.22.1.2 NU 63 70 78 2022.jpg current
- 13:04, 15 February 2022 diff hist 0 N File:751.22.1.2 NU 35 43 53 2022.jpg current
- 13:01, 15 February 2022 diff hist 0 N File:751.22.1.2 type 7 2022.jpg current
- 12:15, 15 February 2022 diff hist 0 N File:751.22.1.2 type 6 2022.jpg current
- 12:14, 15 February 2022 diff hist 0 N File:751.22.1.2 type 4 2022.jpg current
- 12:12, 15 February 2022 diff hist 0 N File:751.22.1.2 type 3 2022.jpg current
- 12:11, 15 February 2022 diff hist 0 N File:751.22.1.2 type 2 2022.jpg current
- 12:10, 15 February 2022 diff hist -4 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Properties: Per BR, minor clarification involving rounding and a minor correction for Type 8