Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 02:53, 30 October 2020
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

29 October 2020

 m   07:24  Category:108 Prosecution and Progress diffhist +61 Smithk talk contribs →‎108.1.1 Review and Approval of a Subcontract Request: added link

28 October 2020

 m   13:38  Category:612 Impact Attenuators‎‎ 2 changes history+583[Smithk‎ (2×)]
 m   
13:38 (cur | prev) +52 Smithk talk contribs →‎612.3 Construction Inspection Guidelines
 m   
13:15 (cur | prev) +531 Smithk talk contribs Per EPS, update to clarify how the sand barrel impact attenuator arrays are paid for and used in work zones.
 m   11:27  751.14 Steel Superstructure diffhist +281 Smithk talk contribs →‎751.14.3.1 Field Bolted Splice Design: Per BR, added link to BR's online Structural Engineering Guidance for design of galvanized bolted connections.
 m   08:07  Category:134 Engineering Professional Services diffhist -31 Smithk talk contribs →‎134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, updated on-call consultant information

26 October 2020

 m   13:17  237.8 Contract Time diffhist +273 Smithk talk contribs Per Bid & Contract, clarified guidance to include needed justification on higher LDs.