Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 123.1.1)
m (EPG 616.23, EPG 303)
Line 28: Line 28:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2"| [[image:Main Page 3 Oct 29, 2013.jpg|center|390px|thumb|<center>'''    The [http://www.newriverbridge.org/ New I-70 Mississippi River Bridge project] team has started to test the cable lights. The downstream tower is lit in this photo.      '''</center> ]]
+
|colspan="2"| [[image:Main Page Oct 31, 2013.jpg|center|390px|thumb|<center>'''    Intermed. Construction Inspector Aaron Rieder measures the width of the shoulder at a new interchange under construction at I-49 and 30th Rd. in Lamar.      '''</center> ]]
 
|-
 
|-
|colspan="2"| [[image:Main Page 2 Oct 29, 2013.jpg|center|390px|thumb|<center>'''    Sr. Mtnc. Worker Alan Elliott mows Rte. O near New London to help maintenance crews complete the mowing of all the minor routes this week.    '''</center> ]]
+
|colspan="2"| [[image:Main Page 3 Oct 29, 2013.jpg|center|390px|thumb|<center>'''    The [http://www.newriverbridge.org/ New I-70 Mississippi River Bridge project] team has started to test the cable lights. The downstream tower is lit in this photo.    '''</center> ]]
 
|-
 
|-
| colspan="2"| [[image:Main Page Oct 29, 2013.jpg|center|390px|thumb|<center>'''    The bridge girders for [http://www.modot.org/stlouis/major_projects/Route364upgrade.htm Rte. 364] over Hanley Rd. were placed in Dardenne Prairie.    '''</center> ]]
+
| colspan="2"| [[image:Main Page 2 Oct 29, 2013.jpg|center|390px|thumb|<center>'''    Sr. Mtnc. Worker Alan Elliott mows Rte. O near New London to help maintenance crews complete the mowing of all the minor routes this week.    '''</center> ]]
 
|}
 
|}
  
Line 43: Line 43:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
| colspan="2"| [[image:Main Page Oct 22, 2013.jpg|center|390px|thumb|<center>'''    This award-winning span in Lamar just east of I-49 was one of over 800 bridges in MoDOT’s [[:Category:Safe and Sound|Safe and Sound Bridge Improvement Program]] that was honored with [http://www.transportation.org/Pages/default.aspx AASHTO’s] [http://americastransportationawards.org/ People’s Choice Award] at the America’s Transportation Awards in Denver. Bridges like this one were repaired or replaced on budget and two years ahead of schedule in every Missouri county. MoDOT will contribute the award’s $10,000 prize to [http://www.curesearch.org/ CureSearch for Children's Cancer], which funds innovative children’s cancer research.  '''</center> ]]
+
| colspan="2"| [[image:Main Page Oct 29, 2013.jpg|center|390px|thumb|<center>'''    The bridge girders for [http://www.modot.org/stlouis/major_projects/Route364upgrade.htm Rte. 364] over Hanley Rd. were placed in Dardenne Prairie.  '''</center> ]]
 
|}
 
|}
  
Line 50: Line 50:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late October, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late October, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 84556 ||'''10.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 126006
+
|'''20.'''  [[751.5 Standard Details|EPG 751.5]], 84625 ||'''10.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 126083
 
|-
 
|-
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 84894   ||'''9.'''  [[:Category:200 GEOMETRICS|EPG 200]], 127497
+
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 85114   ||'''9.'''  [[:Category:200 GEOMETRICS|EPG 200]], 127585
 
|-
 
|-
|'''18.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 87833 ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 128868
+
|'''18.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 87865 ||'''8.''' [[:Category:101 Standard Forms|EPG 101]], 129206
 
|-
 
|-
|'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 88676   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 148830
+
|'''17.''' [[903.6 Warning Signs|EPG 903.6]], 88750   ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 149064
 
|-
 
|-
|'''16.'''  [[903.6 Warning Signs|EPG 903.6]], 88682  ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 158618
+
|'''16.'''  [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 88938  ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 158768
 
|-
 
|-
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 90180   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 192798
+
|'''15.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 90252   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 192976
 
|-
 
|-
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 92055 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 198875
+
|'''14.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 92112 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 199080
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 95876   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 216983
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 95981   ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 217216
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 105796 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 228288
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 105914 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 228537
 
|-
 
|-
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 124352 ||'''1.''' EPG Main Page, 1302880
+
|'''11.'''  [[:Category:616 Temporary Traffic Control|EPG 616]], 124508 ||'''1.''' EPG Main Page, 1305047
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''TMAs and Updated TAs for Stationary and Mobile Operations'''
 +
 +
10/31/13: Updated and new TAs, available at [[616.23 Traffic Control for Field Operations#Easily printable pdf. versions|EPG 616.23 TCFO]] and [[616.8 Typical Applications (MUTCD 6H)|EPG 616.8 Typical Applications]], provide guidance for operations on roadways with and without edgelines. Also, [[:Category:612 Impact Attenuators|EPG 612 Impact Attenuators]] has been updated to provide additional guidance for stationary and mobile operations, hauling criteria and operator's training.
 +
 +
'''Rock Base'''
 +
 +
10/31/13: A 12" rock base option has been provided in [[:Category:303 Rock Base#303.1 Construction Inspection for Sec 303|EPG 303 Rock Base]] and [[:Category:350 Design for Bases and Aggregate Surfaces#350.2 Rock Base|EPG 350 Design for Bases and Aggregate Surfaces]] to bring guidance into compliance with current practice on particle dimensions, material placement, placement for the final surface and the basis of payment.
 +
 
'''[[media:123 Federal Involvement Project List.pdf|Federal Involvement Project List]]'''
 
'''[[media:123 Federal Involvement Project List.pdf|Federal Involvement Project List]]'''
  
Line 163: Line 171:
  
 
9/20/13:  Guidance in [[616.18 Construction Inspection Guidelines for Sec 616#Construction Requirements (for Sec 616.4)|EPG 616.18 Construction Requirements]] was expanded to clarify how to produce documentation so as to avoid the possibility of paying for a device more than once.
 
9/20/13:  Guidance in [[616.18 Construction Inspection Guidelines for Sec 616#Construction Requirements (for Sec 616.4)|EPG 616.18 Construction Requirements]] was expanded to clarify how to produce documentation so as to avoid the possibility of paying for a device more than once.
 
'''[[:Category:105 Control of Work#A partial list of items|Daily Work Reports]]'''
 
 
9/20/13: Guidance for diary notations about accounting on contractor equipment and personnel has been clarified and slightly expanded.
 
 
'''[[media:950.1.1 Annual Report.docx|Annual Report for Automated Enforcement of Red-Light Violations]]'''
 
 
9/20/13: In [[:Category:950 Automated Traffic Enforcement#950.1.1 Automated Enforcement of Red-Light Violations|EPG 950.1.1]], the above form was added for reporting violations.
 

Revision as of 07:45, 31 October 2013

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available
WELCOME
RECENT POLICY CHANGES IN THE EPG
Intermed. Construction Inspector Aaron Rieder measures the width of the shoulder at a new interchange under construction at I-49 and 30th Rd. in Lamar.
The New I-70 Mississippi River Bridge project team has started to test the cable lights. The downstream tower is lit in this photo.
Sr. Mtnc. Worker Alan Elliott mows Rte. O near New London to help maintenance crews complete the mowing of all the minor routes this week.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

The bridge girders for Rte. 364 over Hanley Rd. were placed in Dardenne Prairie.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late October, the numbers of hits are:
20. EPG 751.5, 84625 10. EPG 136.12, 126083
19. EPG 134, 85114 9. EPG 200, 127585
18. EPG 136.9, 87865 8. EPG 101, 129206
17. EPG 903.6, 88750 7. EPG 616.23, 149064
16. EPG 136.4, 88938 6. EPG 600, 158768
15. EPG 400, 90252 5. EPG 100, 192976
14. EPG 751.40, 92112 4. EPG 700, 199080
13. EPG 620.2, 95981 3. EPG 900, 217216
12. EPG 903, 105914 2. EPG 751, 228537
11. EPG 616, 124508 1. EPG Main Page, 1305047

TMAs and Updated TAs for Stationary and Mobile Operations

10/31/13: Updated and new TAs, available at EPG 616.23 TCFO and EPG 616.8 Typical Applications, provide guidance for operations on roadways with and without edgelines. Also, EPG 612 Impact Attenuators has been updated to provide additional guidance for stationary and mobile operations, hauling criteria and operator's training.

Rock Base

10/31/13: A 12" rock base option has been provided in EPG 303 Rock Base and EPG 350 Design for Bases and Aggregate Surfaces to bring guidance into compliance with current practice on particle dimensions, material placement, placement for the final surface and the basis of payment.

Federal Involvement Project List

10/29/13: In EPG 123.1.1 FHWA Oversight - National Highway System, the current guidelines for FHWA oversight were replaced with a list, per the new oversight agreement with the FHWA.

EPG 751.40.4.4 End Treatment Using Thrie Beam Rail

10/28/13: This new guidance shows details on thrie beam end treatment attached to old concrete parapet curbs. Also, a new standard detailing note for this is now available at EPG 751.50 (H9.13).

Pavement Markings in the Roundabout

10/28/13: Guidance in EPG 620.3.6 Word, Symbol and Arrow Pavement Markings for Roundabouts was clarified to show that fishhook arrows are to be used in the approaches to roundabouts.

New QRG

10/28/13: The new Adobe Final Plans Stamp QRG is now listed in EPG 101 Standard Forms, Quick Reference Guides (QRGs).

General Information Signs

10/25/13: EPG 903.9.7 Airport Sign (D4-10) was revised to show that first order signing for general aviation airports is now provided by MoDOT.

International Roughness Index

10/22/13: In Table 106.3.2.59.3, the naming convention for the electronic profilograph file's lane number, L, was revised.

Unit Pricing for Logo Work on MoDOT Construction Projects

10/22/13: The unit prices from MoDOT's contract with Missouri Logo are now available to MoDOT employees in EPG 903.11.3 and at the bottom of EPG 616.18.

EPG 130.1.3 VE Workplan/Project Selection

10/18/13: 10/18/13: Guidance was updated to comply with MAP-21, the federal surface transportation law. Now, NHS projects costing at least $50,000,000 and NHS bridge projects costing at least $40,000,000 require a Value Engineering (VE) study. (Previously, VE studies were required for NHS projects costing $25M and NHS bridge projects costing $20M.) Projects delivered by the Design/Build method are not required to have a VE study.

EPG 806 Pollution, Erosion and Sediment Control

10/18/13: For greater convenience, a few Maintenance forms for erosion and sediment control have been added at the top of the article.

EPG 134.5.1 Invoicing

10/18/13: The requirements for invoicing consultant contracts were slightly updated. Invoice cover letters are only to be sent to the Fincial Services Division, not the Design Division.

Relocation of Service Signs (Logo Signs) on Construction Projects

10/11/13: Guidance in line with existing practice on how to perform temporary or permanent relocation of Logo signs has been added to EPG 616.18 Construction Inspection Guidelines. This guidance is especially helpful to REs and designers.

EPG 751.22.3.8 Camber, Haunching and Girder Steps

10/11/13: Limits for prestressed girder haunching will now be reported to the nearest 1/8”.

New QRG

10/11/13: A new QRG, Equipment Verification Samples, is now available.

Work Zone Capacity, Queue and Travel Delay for Interstates, Freeways and Multi-lane Roadways

10/10/13: The Work Zone Impact Analysis Spreadsheet Directions form was updated with guidance describing Equivalent Trucks. A synopsis sheet was also added.

New Test Method

10/8/13: EPG 106.3.2.64 TM-64, Void Detection and Undersealing Verification Testing of Concrete Pavement with a Falling Weight Deflectometer is now available. The previous TM-64 was deleted in 2012.

Increased Access to Safety Policies Safety begins with me.jpg

10/4/13: For greater convenience, the listing of safety-related policies has been expanded.

EPG 146.2 DBE Subcontract

10/4/13: A new form, Guidance for Completing the CUF Form, was added.

EPG 136.3.8.10 Traffic Engineering Assistance Program (TEAP)

10/1/13: EPG 906 TEAP has been moved to EPG 136.3.8.10 TEAP. The modified EPG language reflects Design Division timelines and processes. One of the main process changes is that the TEAP studies will be provided through on-call consultants. (Local agencies will select a consultant from an approved list of on-call consultants to complete a TEAP study for them.) The TEAP application has also been completely revised to resemble other DE or LPA standard applications. In FY 2014, the Traffic & Highway Safety Division and the Local Programs group will partner to administer TEAP. The TEAP processes and timelines will remain the same. In FY 2015, the administration of TEAP will be through the Local Programs group.

EPG 751.22.3.8 Camber, Haunching and Girder Steps

10/1/13: A note was added to clarify the camber diagram.

EPG 907.6 Fatal Crash Reviews

9/27/13: Guidance was clarified about which conditions require fatal crash reviews.

Submitting a Bridge Survey Report

9/25/13: In EPG 748.7.3.12 Submission, the guidance was clarified about what files need to be submitted.

EPG 110.3 Rate of Pay

9/24/13: New guidance has been provided to clarify how contractors must submit documentation for the wages of apprentices. The new guidance is #7c.

Documentation of Traffic Control Devices Installations

9/20/13: Guidance in EPG 616.18 Construction Requirements was expanded to clarify how to produce documentation so as to avoid the possibility of paying for a device more than once.