Difference between revisions of "Main Page"
m |
m (EPG 501) |
||
Line 28: | Line 28: | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
|- | |- | ||
− | |colspan="2"| [[image:Main Page Aug | + | |colspan="2"| [[image:Main Page Aug 9, 2013.jpg|center|390px|thumb|<center>''' Rushing flood waters sweep a house against a Rte. 89 bridge. If flood waters can take a house, they can take your car off the road. Do not drive around barricades or attempt to cross flooded roads. '''</center>]] |
|- | |- | ||
− | |colspan="2"| [[image:Main Page Aug | + | |colspan="2"| [[image:Main Page Aug 8, 2013.jpg|center|390px|thumb|<center>''' To honor 100 years of service to Missouri, we have produced a 5-minute video, [http://youtu.be/b1PhEldXuis MoDOT’s Centennial], that looks back over our landmark events. It revisits our early years and follows the changes that made us who we are today. '''</center> ]] |
|- | |- | ||
− | |colspan="2"| [[image:Main Page Aug | + | |colspan="2"| [[image:Main Page Aug 7, 2013.jpg|center|390px|thumb|<center>''' The Regional Bridge Crew, repairing a joint on an I-49 bridge north of Jasper, includes, from left, Inter. Maintenance Worker Scott Oliver, Inter. Maintenance Worker Adam Hawkins, Sr. Maintenance Worker Daniel Myers and Sr. Maintenance Worker Chad Barger. '''</center> ]] |
|} | |} | ||
Line 43: | Line 43: | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
|- | |- | ||
− | |colspan="2"| [[image:Main Page | + | |colspan="2"| [[image:Main Page Aug 6, 2013.jpg|center|390px|thumb|<center>''' Sr. Historic Preservation Specialist Michael Meyer instructs two interns, Kim Proctor (SE Mo State U. student) and Catherine Gravemann (U. of Mo - Columbia student), about [[127.2 Historic Preservation and Cultural Resources|archeology]] and requirements to determine [[:Category:127 MoDOT and the Environment|environmental impacts]] for the [http://www.modot.org/northeast/newsandinformation/District3Release.shtml?action=displaySSI&newsId=187771 Champ Clark Bridge project]. '''</center> ]] |
− | | | ||
− | |||
− | | | ||
− | |[ | ||
|} | |} | ||
Line 54: | Line 50: | ||
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of early August, the numbers of hits are:''' | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of early August, the numbers of hits are:''' | ||
|- | |- | ||
− | |'''20.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], | + | |'''20.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 77901 ||'''10.''' [[:Category:101 Standard Forms|EPG 101]], 117819 |
|- | |- | ||
− | |'''19.''' [[903.5 Regulatory Signs|EPG 903.5]], | + | |'''19.''' [[903.5 Regulatory Signs|EPG 903.5]], 79910 ||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 118010 |
|- | |- | ||
− | |'''18.''' [[751.5 Standard Details|EPG 751.5]], | + | |'''18.''' [[751.5 Standard Details|EPG 751.5]], 81572 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 122978 |
|- | |- | ||
− | |'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], | + | |'''17.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 81956 ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 141357 |
|- | |- | ||
− | |'''16.''' [[903.6 Warning Signs|EPG 903.6]], | + | |'''16.''' [[903.6 Warning Signs|EPG 903.6]], 84798 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 151957 |
|- | |- | ||
− | |'''15.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], | + | |'''15.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 86553 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 185811 |
|- | |- | ||
− | |'''14.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], | + | |'''14.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 88431 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 190841 |
|- | |- | ||
− | |'''13.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], | + | |'''13.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 91347 ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 209383 |
|- | |- | ||
− | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], | + | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], 99703 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 215930 |
|- | |- | ||
− | |'''11.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], | + | |'''11.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 105680 ||'''1.''' EPG Main Page, 1205475 |
|} | |} | ||
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[:Category:501 Concrete#The following procedures for calibration|EPG 501.1.8 Air-Entrained Concrete]]''' | ||
+ | |||
+ | 8/9/13: Guidance was added stating that the district shall provide aggregate correction factors to the Central Laboratory when coarse aggregate samples are submitted for AASHTO T161 testing. | ||
+ | |||
'''[[:Category:109 Measurement and Payment#The following table provides|EPG 109.14 Price Adjustment for Fuel]]''' | '''[[:Category:109 Measurement and Payment#The following table provides|EPG 109.14 Price Adjustment for Fuel]]''' | ||
Line 171: | Line 171: | ||
6/14/13: This article has been updated to show the current RW email procedure. | 6/14/13: This article has been updated to show the current RW email procedure. | ||
− | |||
− | |||
− | |||
− |
Revision as of 08:14, 9 August 2013
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised | ||
___________ | ||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | ||
___________ | ||
The Electronic MoDOT Spec Book for Mobile Devices is now available |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 501.1.8 Air-Entrained Concrete 8/9/13: Guidance was added stating that the district shall provide aggregate correction factors to the Central Laboratory when coarse aggregate samples are submitted for AASHTO T161 testing. EPG 109.14 Price Adjustment for Fuel 8/6/13: Concrete approach pavement has been added to the list of eligible fuel adjustment items in the table. 8/6/13: A reminder to PMs was added that they must wait on FHWA obligation before issuing a NTP to consultants when a contract uses federal funds. EPG 134.4 Contract Approval, Execution and Distribution 8/1/13: Agreement from Audits and Investigations is no longer required for the man-hours, salary rates, overhead rates, direct costs and fixed fee included in the consultant contract. 7/26/13: This new article provides guidance for the MDNR's MS4 permit, which pertains to illicit discharges. Ultrathin Bonded Asphalt Wearing Surface 7/24/13: In EPG 413.3 Ultrathin Bonded Asphalt Wearing Surface, the old Ashpalt Cement Price Index Example file was replaced with the new Asphalt Cement Price Adjustment spreadsheet for square yard items. Constructability of Minor Routes Shouldering Projects 7/24/13: The Modified Shoulder JSP has been replaced with the Optional Shoulder JSP. EPG 147.1.3.1 The Standard Alternative Technical Concepts (ATC) 7/23/13: Three new pdf files now provide additional guidance for the Standard ATC process. Cost Estimate Guide for Rural Preliminary Design 7/16/13: EPG 104.7 Estimates presents the latest cost estimates. Most of the estimates remained stable, with the Maintenance Treatment figures showing the most revision. EPG 751.1.2.18 Soundings (Borings) 7/12/13: A new word document now provides guidance for filling out Form M-40a, Request for Final Soundings of Structures, especially about bridge and roadway classifications. Elastomeric Bearings 7/11/13: In EPG 751.11.1.1 and EPG 751.11.2.1, guidance was clarified on the use of plain and laminated bearing pads. Bearing pad length requirements for P/S NU girders and P/S Spread Box Beams were added. Also, figures in EPG 751.22.1.4 Span and Structure Lengths were updated to reflect the clarification. Pre-negotiation and Hourly Rate Reviews 7/11/13: Revisions in EPG 134.3 Consultant Contract Negotiation result from Audits and Investigations ceasing the pre-negotiation reviews and shifting the reviews to project managers and/or contract administrators. Fig. 134.3.1, District Checklist for Reviewing Executed Consultant Contracts, was also added to provide additional help. Bridge Slabs 7/10/13: Guidance was expanded in EPG 751.6.2.10 Bridge Slabs and the related Standard Detailing Note B3.22 was also updated. 7/10/13: The link to the latest STIP is available in several articles, including EPG 121.3 The Statewide Transportation Improvement Program (STIP). Right of Way Negotiation Guidelines and Procedures 7/8/13: When acquiring realty rights, a minimum offer has been established in EPG 236.7.2.3 Prompt Offer of Just Compensation. 7/8/13: If a subconsultant is not pre-qualified with MoDOT, the firm shall now include their Consultant Certification of Indirect Cost Form instead of the MRC Form. Contract Leveling Course 7/8/13: The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in EPG 402 Bituminous Surface Leveling. Also, the CLC Template examples have been expanded to four scenarios involving the use of pilot cars. 7/5/13: The Design Specifications, Loadings & Unit Stresses general notes have been updated to reflect new AASHTO interim dates. Some other notes have also been reorganized. EPG 616.19 Quality Standards for Temporary Traffic Control Devices 7/1/13: This article has been expanded to provide superior guidance. Bridge Engineering Assistance Program (BEAP) 6/25/13: EPG 754 Bridge Engineering Assistance Program (BEAP) has been moved to EPG 136.3.8.9 Bridge Engineering Assistance Program (BEAP). The content of the article was only slightly modified. EPG 616.6.87 Temporary Rumble Strips 6/25/13: New guidance provides examples of when temporary rumble strips may be used. Traffic Signal Signs 6/18/13: Additional guidance has been provided about the left turn signal remaining in place until the circular red indication is replaced with a red left arrow and the LEFT TURN YIELD ON GREEN sign being maintained until being converted to the flashing yellow arrow indicator. EPG 616.6.87 Temporary Rumble Strips 6/17/13: Guidance is now available for both long term and short term rumble strips on construction projects. EPG 237.9 Submission of Plans and Supporting Documents 6/17/13: This article has been generally clarified and updated to reflect current practices. EPG 236.3.7.5 Distribution of Clearance Certification 6/14/13: This article has been updated to show the current RW email procedure. |