Difference between revisions of "Category:101 Standard Forms"
Jump to navigation
Jump to search
m (→Quick Reference Guides (QRGs) 20px: Per CM, the list of line item adjustment types updated in Line Item Adjustments QRG & Emergency Contacts QRG was updated to include alternate report location) |
m (→Bridge: Per Bridge, updated two forms (Design Layout Box and Stream)) |
||
Line 22: | Line 22: | ||
*[http://epg.modot.mo.gov/forms/BR/Design%20Except%20to%20District.dot Design Except to District] | *[http://epg.modot.mo.gov/forms/BR/Design%20Except%20to%20District.dot Design Except to District] | ||
− | *[ | + | *[[media:101 Design Layout Box.docx|Design Layout (Box)]] |
*[http://epg.modot.mo.gov/forms/BR/Design%20Layout%20(Grade).dot Design Layout (Grade)] | *[http://epg.modot.mo.gov/forms/BR/Design%20Layout%20(Grade).dot Design Layout (Grade)] | ||
− | *[ | + | *[[media:101 Design Layout Stream.docx|Design Layout (Stream)]] |
*[http://epg.modot.mo.gov/forms/BR/Design%20Layout%20(Wall).dot Design Layout (Wall)] | *[http://epg.modot.mo.gov/forms/BR/Design%20Layout%20(Wall).dot Design Layout (Wall)] |
Revision as of 13:53, 28 August 2014
Contents
- 1
- 2 Bridge
- 3 Construction and Materials
- 4 Design
- 5 Financial Services
- 6 Maintenance
- 7 Motor Carrier Services
- 8 Planning
- 9 Right of Way
- 9.1 General Information
- 9.2 Right of Way Organization and Personnel
- 9.3 Administration
- 9.4 Description Writing and Titles
- 9.5 Property Management
- 9.6 Appraisal and Appraisal Review
- 9.7 Negotiation
- 9.8 Relocation Assistance Program
- 9.9 Asbestos Abatement-Removal of Building Improvement
- 9.10 Right Of Way Condemnation
- 9.11 Mediation
- 9.12 Quality Assurance Reviews
- 9.13 Designing Right of Way Plans
- 9.14 Change in Route Status Report
- 9.15 Requests from Cities for Annexations
- 9.16 Outdoor Advertising
- 9.17 Junkyards
- 9.18 Local Public Agency Land Acquisition
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
Design
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Financial Services
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition