Difference between revisions of "Main Page"
m (EPG 235.6) |
m (EPG 751.1.2.9) |
||
Line 30: | Line 30: | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''Weathering Steel''' | ||
+ | |||
+ | 12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]]. | ||
+ | |||
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]''' | '''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]''' | ||
Line 125: | Line 129: | ||
10/10/18: This new Test Method is now available. | 10/10/18: This new Test Method is now available. | ||
− | |||
− | |||
− | |||
− |
Revision as of 12:54, 28 December 2018
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | |
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest. |
Weathering Steel 12/28/18: Guidance for the use of weathering steel has been added to EPG 751.1.2.9 Girder Type Selection. EPG 235.6 Approval of Preliminary Plan 12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design. The “DBE Termination, Substitution or Additional Request” Form 12/18/18: Guidance in EPG 108.1.1 Review and Approval of a Subcontract Request and EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE. EPG 127.1 Request for Environmental Services 12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated. TMA Light Bar 12/11/18: Guidance in EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting and EPG 616.27.1.1 Fleet Lighting Levels, Level 5 has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations. TA-35 MT and TA-35a-d MT were also updated. 12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in EPG 104.7 Estimates. EPG 413.6 Scrub Seal Treatment 12/10/18: Scrub seal treatment guidance is now available. AASHTOWare Project Quick Reference Guides 12/10/18: AASHTOWare Project Quick Reference Guides are now available in EPG 101 Standard Forms. 12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2. 11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old. NEPA Glossary 11/29/18: A new glossary of NEPA terms is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents. EPG 236.16.15 Vegetation Removal 11/28/18: Guidance was updated, particularly in EPG 236.16.15.6 Endangered Species Act and EPG 236.16.15.8 Mowing and Brush Hogging, to be in line with the Endangered Species Act 11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide. Permanent Sidewalk Easement Clause 11/19/18: In EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions, a permanent sidewalk easement clause is now available for districts' use. EPG 105.9.12 Preconstruction Conference 11/15:18: Subjects to be discussed at this conference now include review of the process to request any DBE termination, substitution or addition. EPG 237.9.3.1 Schedule for Submittal 11/7/18: Guidance has been added about a required e-mail for re-let or moved projects. EPG 604, Construction Requirements (Sec 604.10.3) 10/30/18: When approached with alternative products on a job as part of a change order or VE, this new guidance states that the RE should initially determine suitability and also consult the Field Office and New Products Coordinator to ensure value, uniformity and tracking. 10/25/18: In EPG 703.2.8 Concrete Placement, this new presentation explains a MoDOT best practice. 10/23/18: Clarified the location of the rumbles strips and pavement markings for differing shoulder and pavement conditions. The minimum pavement thickness was revised from from 1 3/4" to 1". EPG 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs 10/23/18: This new test method corresponds to the spec change in Sec 613 that allows this alternate test method. Prestressed Concrete I Girders 10/23/18: NU 78 details were placed back into EPG 751.22.1.2 Geometric Dimensions, EPG 751.22.3.9 Open Intermediate Bent Diaphragms and EPG 751.22.3.10 Closed Intermediate Bent Diaphragms. NU flange blockout guidance was also added and concrete diaphragm details were clarified. Bending Diagrams 10/16/18: In EPG 751.12.2.3 End Bent Reinforcement, the bending diagrams were revised to accommodate safety barrier reinforcement. A reinforcing clearance note in H10a. Conventional-Formed Barrier standard notes was added to avoid possible confusion when placing barrier reinforcement at end bents. EPG 751.50 Standard Detailing Notes 10/12/18: Notes J1.12b, J1.21b and J1.25A have been added. J1.25 was revised to clarify maximum applied bearing pressure limit. EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents 10/11/18: This article has been extensively revised to reflect current procedures. EPG 106.3.2.88 TM-88 Bond Strength Test for Tack Coat 10/10/18: This new Test Method is now available. |