[[806.8 Storm Water Pollution Prevention Plan (SWPPP)|EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)]]'''
 +
 +
1/27/12: This article has been generally clarified. Batch plants are not covered under the MoDOT land disturbance permit and require separate permitting through MDNR.  Also, excess material disposal (waste disposal) areas require the same environmental and historical preservation clearances as borrow sites. 
 +
 
'''[http://epg.modot.org/index.php?title=Environmental_Studies#SWMP_and_MS4 Stormwater Management Plan and the Municipal Separate Storm Sewer Systems Permit Program]'''
 
'''[http://epg.modot.org/index.php?title=Environmental_Studies#SWMP_and_MS4 Stormwater Management Plan and the Municipal Separate Storm Sewer Systems Permit Program]'''
  
Line 162: Line 166:
 
'''[[751.13 Expansion Devices#751.13.2 Silicone Expansion Joint Sealant|EPG 751.13.2 Silicone Expansion Joint Sealant]]'''
 
'''[[751.13 Expansion Devices#751.13.2 Silicone Expansion Joint Sealant|EPG 751.13.2 Silicone Expansion Joint Sealant]]'''
  
11/8/11: Silicone expansion joint sealant systems shall not be used for normal contract new or rehabilitation jobs.
+
11/8/11: Silicone expansion joint sealant systems shall not be used for normal contract new or rehabilitation jobs.
 
 
'''[[:Category:409 Seal Coat#Seal coats/chip seals|Contract Seal Coat JSP]]'''
 
 
 
11/7/11: In EPG 409 Seal Coat, the JSP has been updated.
 

Revision as of 15:19, 27 January 2012

EPG.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Aaron Cox, Employee Development Specialist, instructs others how to perform a pre-trip inspection. Federal and state laws require commercial drivers to inspect their vehicles.
Area Engineer Matt Killion (left) responded to questions from over 100 citizens of Peculiar who were concerned about a bridge project at Rte. J/C and U.S. 71. Mayor Ernest Jungmeyer (right) also fielded questions at the December meeting.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Randy Cantrell, Intermediate Maintenance Worker, cuts brush along U.S. 71 near Adrian.
Viewed from Illinois, the two Mississippi River Bridge towers reach half of their eventual 400 ft. height. After completing the towers in late spring, crews will start placing the cables and the framework for the driving surface. The entire project, including several new interchanges, is on track to be complete in early 2014. Live cameras of the project are available for viewing.
FASTforward
Connect to the most recent and innovative business, policy and engineering solutions at MoDOT!
Perhaps you've wondered how many hits the most popular EPG articles have. As of late January, the numbers of hits are:
20. EPG 800, 36924 10. EPG 400, 64236
19. EPG 500, 37646 9. EPG 616, 74351
18. EPG 903.5, 46332 8. EPG 616.23, 78893
17. EPG 1000, 48541 7. EPG 200, 94386
16. EPG 751.5, 49756 6. EPG 600, 113578
15. EPG 903.6, 50941 5. EPG 100, 129272
14. EPG 620.2, 51861 4. EPG 700, 142319
13. EPG 751.13, 55757 3. EPG 751, 142782
12. EPG 751.40, 58933 2. EPG 900, 153097
11. EPG 903, 60153 1. EPG Main Page, 611178

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

1/27/12: This article has been generally clarified. Batch plants are not covered under the MoDOT land disturbance permit and require separate permitting through MDNR. Also, excess material disposal (waste disposal) areas require the same environmental and historical preservation clearances as borrow sites.

Stormwater Management Plan and the Municipal Separate Storm Sewer Systems Permit Program

1/27/12: Information for "SWMP" and "MS4" has been added to EPG Environemental Studies.

EPG 321.2 Geotechnical Guidelines

1/24/12: The MoDOT 50 Blow method has been replaced with the Split Spoon Test in Shale.

Alternate and Optional Pavement

1/19/12: Design has re-titled "Alternate Pavement" and clarified its guidance.

Roughness Coefficients

1/19/12: In EPG 749.5.3.2, the roughness coefficients for the Kerby-Hathaway Equation for Overland Flow were updated to match the runoff program.

2009 MUTCD

1/18/12: Traffic has revised all of the EPG 620 articles, EPG 900, all of the EPG 902 articles and all of the EPG 903 articles to bring policy into substantial compliance with the 2009 MUTCD. EPG 643.4 and EPG 910.3 Dynamic Message Signs were also expanded. This is a general rewrite of policy. Several articles are new, some former articles have been removed and many articles have been retitled.

EPG 413.3.2 Laboratory Procedure

1/12/12: Construction and Materials has updated guidance to reflect two newly adopted AASHTO test methods (T 327 and T 330).

EPG 106.20.11 Internal Material Records

1/12/12: Contract and diary info are to be archived for 11 years.

EPG 751.1.2.2 Wing Lenths

1/11/12: Guidance has been clarified for situations when unequal wing lengths are acceptable.

BEAP Consultant List

1/10/12: The BEAP Consultant List was updated in EPG 754 Bridge Engineering Assistance Program.

Clear Zone Definition

1/9/12: In EPG 902.12 Glossary, the definition of "clear zone" was clarified to more accurately reflect the AASHTO definition.

EPG 751.2.4 Load Distributions

1/5/12: Guidance for load distribution has been updated, based on AASHTO LRFD criteria.

EPG 123.1.1 FHWA Oversight for the National Highway System

1/4/12: The guidance for FHWA oversight parameters was clarified.

EPG 751.22.3.15 Dowel Bars

1/3/12: Bridge has added guidance to clarify the design of anchor rods.

Two New QRGs

12/22/11: Two new QRGs, Sampling Checklist and PAL Plant Inspection and Record, were added to EPG 101.

Consideration of Blast Loading

12/13/11: To coincide with the release of AASHTO Guildelines on Blast Loading, Bridge has provided additional guidance to consider blast loading as another load in both EPG 751.1.2.33 and EPG 751.2.2.5.

Northwest District Continuous Operations Routes

12/6/11: The continuous operations routes in the NW District have been updated in EPG 133.4.1 and EPG 144.1.

Billboard Clause

12/5/11: Guidance about the Billboard Clause was removed from EPG 236.5.21 The Conveyance Document.

EPG 751.50 A5 Miscellaneous Std Detailing Notes

12/5/11: General Note A5.5's definition is already included in the standard specifications and was removed to free additional space on our plans.

EPG 751.40.4.3 Replacement of Existing Curb with Thrie Beam Rail

12/2/11: Numerous minor revisions bring EPG guidance into compliance with the standard plans for thrie beam in both EPG 751.40.4.3 and EPG 751.50 Standard Detailing Notes.

Steel Superstructure Details

11/23/11: Guidance in EPG 751.14.5 Details was revised for greater consistency. EPG 751.14.5.10 was added to illustrate consistency in application.

Effect of Grades on Stopping Sight Distance (SSD)

11/22/11: Traffic and Highway Safety Division has added a spreadsheet to calculate SSD for additional grades.

EPG 774 Cathodic Protection

11/22/11: Outdated information in several portions of this article were updated. Three forms were also revised to increase clarity.

EPG 137 Construction Inspection Guidance for Records to be Maintained

11/14/11: District, office, naming convention and archiving option information for construction inspection records was updated.

EPG 751.13.2 Silicone Expansion Joint Sealant

11/8/11: Silicone expansion joint sealant systems shall not be used for normal contract new or rehabilitation jobs.