User contributions for Smithk
Jump to navigation
Jump to search
30 June 2010
- 08:1508:15, 30 June 2010 diff hist +28 m Category:1025 Corrugated Aluminum Alloy Pipe Underdrains →1025.2 Procedure: updated links
- 08:1308:13, 30 June 2010 diff hist +112 m Category:1024 Corrugated Aluminum Alloy Culvert Pipe and Corrugated Aluminum Alloy Structural Plate →1024.2 Procedure: updated links
- 08:0908:09, 30 June 2010 diff hist +4 m 1020.5 Corrugated Metal Pipe (CMP) Inspection Guide updated links
- 08:0708:07, 30 June 2010 diff hist +4 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.2.3 Identification Markings for Steel Sheet: updated links
- 08:0608:06, 30 June 2010 diff hist +6 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections →1020.2.5 Field Inspection: updated links
- 07:5907:59, 30 June 2010 diff hist +65 m Category:1073 Joint Material for Structures updated links
- 07:5207:52, 30 June 2010 diff hist +18 m Category:1050 Lumber, Timber, Piling, Posts and Poles →1050.4 Qualified Wood Inspection Agencies: updated link
- 07:3207:32, 30 June 2010 diff hist +322 Nm 106.2 Local Materials Sources Per CM, article renamed to conform with Sec 106. Old EPG 106.2 (new EPG 106.12) had no appreciable history and 2133 hits.
- 07:3007:30, 30 June 2010 diff hist +4,423 Nm 106.1 Source of Supply and Quality Requirements Per CM, article renamed to conform with Sec 106. Old EPG 106.1 had no appreciable history and 3660 hits.
- 07:1807:18, 30 June 2010 diff hist +534 m Category:106 Control of Material Per CM, EPG 106 was rearranged for greater clarity and conformity to Sec 106
29 June 2010
- 07:1707:17, 29 June 2010 diff hist +29 m Category:105 Control of Work →105.10 Inspection of Work (Sec 105.10): photo
- 07:1207:12, 29 June 2010 diff hist −751 135.1 Guidelines for Good Contractor Relationships Moved info to EPG 105.9.1, per CM current
- 07:0607:06, 29 June 2010 diff hist −3,667 135.2 Public Contacts Moved info to EPG 105, EPG 107 and EPG 110, per CM.
- 06:5506:55, 29 June 2010 diff hist −705 135.3 Inter-Departmental Relations Moved info to EPG 105.9.9, per CM. current
- 06:5006:50, 29 June 2010 diff hist +246 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated links
- 06:4606:46, 29 June 2010 diff hist −1,474 m 135.6 Equal Employment Opportunity Moved info to EPG 110.5.2, per CM current
- 06:3706:37, 29 June 2010 diff hist −14,826 m 135.5 Labor Compliance Moved info to EPG 110, per CM current
28 June 2010
- 13:2713:27, 28 June 2010 diff hist 0 135.4 Required Notices and Posters No edit summary current
- 13:2713:27, 28 June 2010 diff hist −5,832 m 135.4 Required Notices and Posters Moved info to EPG 110.2, per CM
- 13:2213:22, 28 June 2010 diff hist +13,503 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, article's info rearranged for greater clarity. Portions of EPG 135 also incorporated.
- 13:1113:11, 28 June 2010 diff hist +33 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated links
- 13:0713:07, 28 June 2010 diff hist +81 m Category:239 Construction Inspection Guidelines for Final Plans →239.21.1 Resident Engineer's Office: updated link
- 12:5312:53, 28 June 2010 diff hist 0 N File:108.1 Form C-220 Instructions.doc No edit summary current
- 12:5012:50, 28 June 2010 diff hist +39,422 m Category:108 Prosecution and Progress Per CM, article's info rearranged for greater clarity.
- 12:4012:40, 28 June 2010 diff hist −2,746 Category:702 Load-Bearing Piles Per CM, removal of the 10% overrun for structural pile.
- 12:3212:32, 28 June 2010 diff hist +514 Category:613 Pavement Repair →613.1.4 Dowel Bar Retrofit (Sec 613.40): Guidance for a new pavement crack repair alternative
- 11:1711:17, 28 June 2010 diff hist +104 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated links
- 11:1211:12, 28 June 2010 diff hist 0 N File:107.1 Missouri State Statutes.doc No edit summary current
- 11:1111:11, 28 June 2010 diff hist +16,214 m Category:107 Legal Relations and Responsibility to the Public Per CM, article's info rearranged for greater clarity.
- 10:2610:26, 28 June 2010 diff hist +42 m Where to Find Construction and Materials Functions →EPG articles from Field Section 100 (General Conditions of the Contract): updated links
- 10:1910:19, 28 June 2010 diff hist +72 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) update links
- 10:1710:17, 28 June 2010 diff hist +72 m 135.5 Labor Compliance updated links
- 10:1510:15, 28 June 2010 diff hist +18 m 616.23 Construction Inspection Guidelines for Sec 616 →Deficiencies in Traffic Control Measures (For Sec 616.4.2.5): updated link
- 10:1110:11, 28 June 2010 diff hist +18 m 127.16 Wetland and Stream Mitigation →127.16.3 Construction: updated link
- 10:1010:10, 28 June 2010 diff hist +136 m 104.13 Construction Inspection Guidance for Sec 104 →104.13.2 Value Engineering Proposals (Sec 104.6): updated links
- 10:0610:06, 28 June 2010 diff hist +94 m 238.4 Construction Surveying updated links
- 10:0210:02, 28 June 2010 diff hist +18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.2 Change Order: updated link
- 10:0110:01, 28 June 2010 diff hist +18 m Category:206 Excavation for Structures →206.4 Construction Inspection Guidelines for Sec 206: updated link
- 10:0010:00, 28 June 2010 diff hist +17 m Category:110 State and Federal Wage Rates and Other Requirements →Rating Completion: updated link
- 09:5909:59, 28 June 2010 diff hist +54 m Category:904 Construction Inspection Guidance - Certification Requirements and Procedure for Lighting, Traffic Signals, Signs and Cathodic Protection updated links
- 09:5809:58, 28 June 2010 diff hist +18 m Category:123 Federal-Aid Highway Program →123.2.2 The FHWA - MoDOT Relationship: updated link
- 09:5709:57, 28 June 2010 diff hist +36 m Category:900 TRAFFIC CONTROL →900.1 Material Inspection for Traffic Control: updated links
- 09:3309:33, 28 June 2010 diff hist −79 m 171.6 Roadsides →RDS(C4) Roadside Park Requirements: Per Maintenance, removal of out-of-date info to bring EPG into compliance with long-established procedure.
- 09:0809:08, 28 June 2010 diff hist +36 m Category:105 Control of Work updated links
- 09:0209:02, 28 June 2010 diff hist +2,175 m Category:105 Control of Work forms and figures made more easily accessible in a box at top of article.
- 08:4008:40, 28 June 2010 diff hist +74,723 m Category:105 Control of Work Per CM, article's layout updated to more closely reflect the layout of Sec 105
- 08:1808:18, 28 June 2010 diff hist +17 m Category:130 Value Engineering →130.2 Contractor initiated VECPs: updated link to EPG 104.13
- 08:1608:16, 28 June 2010 diff hist +2,380 m 104.13 Construction Inspection Guidance for Sec 104 Per CM, article's info rearranged for greater clarity.
- 08:0908:09, 28 June 2010 diff hist +715 Nm 103.2 Contract Bond for Sec 103.4 Per CM, additional guidance for Sec 103.4 in this new article
- 08:0608:06, 28 June 2010 diff hist −299 m 102.2 Contractor Performance, Referrals, and Endorsements Per CM, some info moved to EPG 102.1 and other minor clarifications