User contributions for Smithk
Jump to navigation
Jump to search
19 July 2010
- 08:0908:09, 19 July 2010 diff hist +224 m 903.3 Ground-Mounted Sign Supports Form TR-15 added
- 07:5707:57, 19 July 2010 diff hist 0 N File:942 Product Evaluation Form.doc No edit summary current
- 07:5707:57, 19 July 2010 diff hist +267 m Category:942 Approved Products List Per Traffic, new Product Evaluation Form for signing
- 07:3407:34, 19 July 2010 diff hist −346 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA Coordinator, CDs of the LPA no longer offered.
16 July 2010
- 10:0610:06, 16 July 2010 diff hist +33 m Category:501 Concrete →501.1.3 Sampling (Sec 501.4): added photo
- 10:0410:04, 16 July 2010 diff hist 0 N File:501.1.3.jpg No edit summary current
- 09:5409:54, 16 July 2010 diff hist 0 N File:238.1.18a.jpg No edit summary current
- 09:5309:53, 16 July 2010 diff hist +35 m 238.1 Aerial Mapping and LiDAR Surveys →238.1.18 Traverse Adjustment: added photo
- 09:5209:52, 16 July 2010 diff hist 0 File:238.1.18.jpg uploaded a new version of "Image:238.1.18.jpg" current
- 09:5009:50, 16 July 2010 diff hist 0 N File:238.1.18.jpg No edit summary
- 09:4609:46, 16 July 2010 diff hist −2 m 238.3 Route Surveying →238.3.32 Bearings: updated link
- 09:4209:42, 16 July 2010 diff hist 0 m Category:302 Stabilized Permeable Base →302.2 Material Inspection for Sec 302: minor correction
- 09:4009:40, 16 July 2010 diff hist +32 m Category:302 Stabilized Permeable Base added photo
- 09:4009:40, 16 July 2010 diff hist 0 N File:302.jpg No edit summary current
- 09:1809:18, 16 July 2010 diff hist +33 m 102.2 Contractor Performance, Referrals, and Endorsements photo added
- 09:1809:18, 16 July 2010 diff hist 0 N File:102.2.1.jpg No edit summary current
- 08:5808:58, 16 July 2010 diff hist +2 m Category:201 Clearing and Grubbing new photo
- 08:5808:58, 16 July 2010 diff hist 0 N File:201 clearing and grubbing a.jpg No edit summary current
- 08:4608:46, 16 July 2010 diff hist +34 m Category:108 Prosecution and Progress →108.16.2 Key Dates: photo added
- 08:4408:44, 16 July 2010 diff hist 0 N File:108.16.2.jpg No edit summary current
- 08:0808:08, 16 July 2010 diff hist +2 m Category:903 Highway Signing (MUTCD Part 2) new photo
- 08:0608:06, 16 July 2010 diff hist 0 File:903 Highway Signing a.jpg uploaded a new version of "Image:903 Highway Signing a.jpg" current
- 08:0308:03, 16 July 2010 diff hist 0 N File:903 Highway Signing a.jpg No edit summary
15 July 2010
- 12:4812:48, 15 July 2010 diff hist +419 m Category:502 Portland Cement Concrete Base and Pavement →502.1.11 Contractor Quality Control (Sec 502.11): removed archaic "Field Section" references and replaced with EPG references
- 12:4212:42, 15 July 2010 diff hist −4 m Category:1001 General Requirements for Material →1001.4.1.2 Sample Preparation: corrected a link
- 08:3708:37, 15 July 2010 diff hist +28 m Category:110 State and Federal Wage Rates and Other Requirements added a link
- 08:2508:25, 15 July 2010 diff hist +48 m Main Page EPG 110.3, Rate of pay
- 08:0408:04, 15 July 2010 diff hist +308 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Clarification, per CM and ECR, of Mo Dept of Labor rules.
- 07:2607:26, 15 July 2010 diff hist 0 N File:806.8 SWPPP July 10a.doc No edit summary current
- 07:2607:26, 15 July 2010 diff hist +1 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor update
- 07:1407:14, 15 July 2010 diff hist −8 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.11 Turbidity Removal and Advanced Treatment Systems: minor correction
- 06:4006:40, 15 July 2010 diff hist −38 m 320.1 Preliminary Geotechnical Report (PGR) →320.1.3 Report: minor cosmetic correction
14 July 2010
- 12:2512:25, 14 July 2010 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition per RW, Roster of Approved Contract Appraisers updated
- 12:1312:13, 14 July 2010 diff hist 0 N File:236.6 Statewide Fee Appraiser List Jul 14 2010.pdf No edit summary
- 12:1312:13, 14 July 2010 diff hist 0 m 236.6 Appraisal and Appraisal Review per RW, Roster of Approved Contract Appraisers updated
- 12:0012:00, 14 July 2010 diff hist −52 m Main Page Updated TA-26
- 11:5711:57, 14 July 2010 diff hist +11 m 616.27 Traffic Control for Field Operations cosmetic correction
- 11:4911:49, 14 July 2010 diff hist 0 N File:616.23.3.26.1 Jul10.jpg No edit summary current
- 11:4811:48, 14 July 2010 diff hist 0 N File:616.23.3.26 Jul10.jpg No edit summary current
- 11:4711:47, 14 July 2010 diff hist 0 N File:616.23.3 TA-26, Jul10.pdf No edit summary
- 11:4611:46, 14 July 2010 diff hist −203 m 616.27 Traffic Control for Field Operations TA-26 slightly updated, per Traffic
- 11:0511:05, 14 July 2010 diff hist 0 N File:Main Page July 14, 2010.jpg No edit summary current
- 11:0411:04, 14 July 2010 diff hist +105 m Main Page new photo
- 08:1108:11, 14 July 2010 diff hist −61 m 1057.4 Laboratory Testing for Sec 1057 →1057.4.1 Procedure: Per Bridge and CM, removed metric references and removed AASHTO's M42 and M53 since they are so rarely needed
- 08:0508:05, 14 July 2010 diff hist −504 m 1036.7 Laboratory Testing for Sec 1036 →1036.7.1 Procedure: Per Bridge and CM, removed metric references and removed AASHTO's M42 and M53 since they are so rarely needed
- 08:0008:00, 14 July 2010 diff hist −65 m Category:1036 Reinforcing Steel for Concrete Per Bridge and CM, removed metric designation
- 07:5507:55, 14 July 2010 diff hist −2 m 751.50 Standard Detailing Notes Per Bridge and CM, replaced "smooth" with the more correct "plain"
- 07:5107:51, 14 July 2010 diff hist +50 m 751.40 LFD Widening and Repair link updates
- 07:4807:48, 14 July 2010 diff hist +1 m 751.40 LFD Widening and Repair Per Bridge and CM, replaced "non-epoxy" with the more correct "uncoated"
- 07:3307:33, 14 July 2010 diff hist −245 m 751.5 Structural Detailing Guidelines Per Bridge and CM, replaced "non-epoxy" with the more correct "uncoated" and removed AASHTO's M42 and M53 since they are so rarely needed