User contributions for Smithk
Jump to navigation
Jump to search
22 March 2011
- 06:4506:45, 22 March 2011 diff hist +590 m Category:107 Legal Relations and Responsibility to the Public →107.13 Insurance Requirements: Per CM, additional guidance provided
21 March 2011
- 14:3614:36, 21 March 2011 diff hist +55 m 751.50 Standard Detailing Notes Clarification to notes, per Bridge
- 11:5111:51, 21 March 2011 diff hist +20 m 136.10 Construction Authorization and Letting →136.10.3 Disadvantaged Business Enterprise (DBE): Minor update of a link
- 11:4211:42, 21 March 2011 diff hist −6,447 m Independent Assurance Samples and Tests →Guide Schedule for Independent Assurance Samples: Per Physical Lab, "Minimum Number of Tests" column removed. current
18 March 2011
- 13:4113:41, 18 March 2011 diff hist 0 N File:236.6 Statewide Fee Appraiser List Mar 18 2011.pdf No edit summary
- 13:4113:41, 18 March 2011 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, updated Roster of Approved Contract Appraisers
- 12:1412:14, 18 March 2011 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management minor adjustment
- 12:1312:13, 18 March 2011 diff hist 0 N File:136.6.8 Mar 2011.jpg No edit summary current
- 12:1312:13, 18 March 2011 diff hist +50 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.6.8 Consultant Performance Appraisal: replacement photo
- 12:0312:03, 18 March 2011 diff hist +95 m Category:230 Alignment of the Roadway No edit summary current
- 12:0012:00, 18 March 2011 diff hist −6 m Category:230 Alignment of the Roadway minor correction of links
- 11:5611:56, 18 March 2011 diff hist 0 File:230.2.1.jpg uploaded a new version of "Image:230.2.1.jpg" current
- 11:5511:55, 18 March 2011 diff hist +68 m 230.2 Vertical Alignment added photos
- 11:5511:55, 18 March 2011 diff hist 0 N File:230.2.2.jpg No edit summary current
- 11:4611:46, 18 March 2011 diff hist 0 N File:230.2.1.jpg No edit summary
- 11:2311:23, 18 March 2011 diff hist 0 N File:616.1.3.4.jpg No edit summary current
- 11:0211:02, 18 March 2011 diff hist 0 N File:238.1.1.jpg No edit summary current
- 11:0211:02, 18 March 2011 diff hist +103 m 238.1 Aerial Mapping and LiDAR Surveys →238.1.1 Surveys Adaptable to Photogrammetry: added photo
- 09:5309:53, 18 March 2011 diff hist 0 N File:606.2.4.6.jpg No edit summary current
- 09:5309:53, 18 March 2011 diff hist +80 m 606.2 Guard Cable new photo
- 09:2409:24, 18 March 2011 diff hist 0 N File:910.3.jpg No edit summary current
- 09:2409:24, 18 March 2011 diff hist −24 m 910.3 Dynamic Message Signs (DMS) updated photo
- 08:5708:57, 18 March 2011 diff hist 0 N File:128.3.2.jpg No edit summary current
- 08:5708:57, 18 March 2011 diff hist +33 m Category:128 Conceptual Studies →128.3 Pavement Rehabilitation Projects – Non - Freeway Roadways: new photo
16 March 2011
- 14:2714:27, 16 March 2011 diff hist −64 Category talk:101 Standard Forms No edit summary
- 13:3413:34, 16 March 2011 diff hist +122 m 236.6 Appraisal and Appraisal Review Per RW, updated CCO RW16 and added CCO RW17.
- 09:2309:23, 16 March 2011 diff hist −16 m Category:749 Hydrologic Analysis →749.2.1 Design Frequency Criteria: updated link
15 March 2011
- 12:1412:14, 15 March 2011 diff hist 0 m 751.14 Steel Superstructure →751.14.5 Details: adjustment of figures' sizes
- 12:0512:05, 15 March 2011 diff hist −23,118 m Category:123 Federal-Aid Highway Program →123.3 Materials Requirements: Per Physical Lab, clarification of FHWA-required independent assurance sampling
- 09:4909:49, 15 March 2011 diff hist 0 N File:821.15 Spray Forms for Districts Jan 2011.doc No edit summary current
- 09:4809:48, 15 March 2011 diff hist +9 m 821.15 Forms and Conversions Per Maintenance, updated an example of the spray form
- 09:3709:37, 15 March 2011 diff hist 0 N File:751.14 lateral bracing detail a Mar 2011.gif No edit summary
- 09:3609:36, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in structure with finger plate expansion device detail d Mar 2011.gif No edit summary
- 09:3409:34, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in structure with finger plate expansion device detail a Mar 2011.gif No edit summary
- 09:3009:30, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in detail a Mar 2011.gif No edit summary
- 09:2909:29, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - webs over 48in detail c Mar 2011.gif No edit summary
- 09:2809:28, 15 March 2011 diff hist +4 m 751.14 Steel Superstructure →751.14.5.4 End Diaphragms for Plate Girders: minor correction
- 09:2609:26, 15 March 2011 diff hist 0 N File:751.14 end diaphragm - 42in thru 48in webs detail e Mar 2011.gif No edit summary
- 09:2509:25, 15 March 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - optional Mar 2011.gif No edit summary
- 09:2409:24, 15 March 2011 diff hist 0 N File:751.14 diaphragm fill plate detail - preferred Mar 2011.gif No edit summary
- 09:2309:23, 15 March 2011 diff hist +54 m 751.14 Steel Superstructure →751.14.5 Details: re-sized figures
- 09:1609:16, 15 March 2011 diff hist 0 N File:751.14 diaphragm connection at stiffener detail Mar 2011.gif No edit summary
- 09:1509:15, 15 March 2011 diff hist +80 m 751.14 Steel Superstructure →751.14.5 Details: Per Bridge, update of several welding details
14 March 2011
- 14:2614:26, 14 March 2011 diff hist −58 m Category:101 Standard Forms →Bridge: Updated two bridge forms, per Bridge
- 11:2111:21, 14 March 2011 diff hist 0 N File:751.24 LFD Retaining Walls Mar 2011.pdf No edit summary
- 11:2111:21, 14 March 2011 diff hist −48 m 751.24 Retaining Walls Per Bridge, update of LFD document
- 10:2010:20, 14 March 2011 diff hist +986 m 751.50 Standard Detailing Notes →J. MSE Wall Notes: Per Bridge, new notes J1.23 and J1.24 and minor modification of J1.9 to clarify guidance for the construction of MSE walls
- 09:5909:59, 14 March 2011 diff hist −14 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per Bridge, revised shear stud tables in EPG 751.6.2 & 751.14.4.5 for consistency
- 09:5609:56, 14 March 2011 diff hist −16 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, revised shear stud tables in EPG 751.6.2 & 751.14.4.5 for consistency
11 March 2011
- 07:5707:57, 11 March 2011 diff hist −85 m 236.3 Administration Per RW, updated Form 3-3.3C