User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:17, 7 June 2013 diff hist +20 m Main Page
- 08:44, 7 June 2013 diff hist 0 N File:G20-5aP 2013.jpg current
- 08:43, 7 June 2013 diff hist +5 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.12 Work Zone and Higher Fines Signs and Plaques (MUTCD 6F.12): Per Traffic, updated G20-5aP plaque
- 11:01, 6 June 2013 diff hist 0 m 236.3 Administration →236.3.4.5 Guideline for Determination of Hardship: minor correction
- 10:54, 6 June 2013 diff hist 0 N File:616.25 WZ Coord Contacts June 2013.docx
- 10:54, 6 June 2013 diff hist +1 616.25 MoDOT Work Zone Guidelines Per Traffic, updated W
- 10:26, 6 June 2013 diff hist +146 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 10:24, 6 June 2013 diff hist -3 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 10:23, 6 June 2013 diff hist 0 N File:136.9.3 June 2013.doc
- 10:23, 6 June 2013 diff hist -21 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, minor correction in the revision date of Fig. 136.9.3
- 09:50, 6 June 2013 diff hist -80 m 236.3 Administration →236.3.4.2 Limited Acquisition Authority and Project Funding: Per RW, minor correction
- 09:35, 6 June 2013 diff hist 0 File:Main Page June 6, 2013.jpg uploaded a new version of "Image:Main Page June 6, 2013.jpg" current
- 09:35, 6 June 2013 diff hist 0 N File:Main Page June 6, 2013.jpg
- 09:34, 6 June 2013 diff hist -328 m Main Page EPG 824
- 09:05, 6 June 2013 diff hist +349 m LPA:136.13 LPA Policy Changes EPG 136.4.2.5
- 09:03, 6 June 2013 diff hist -293 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.5 Step 4 - Response to the RFQ: Per LPA, removed requirement to send e-verify w/ ea. letter of interest. Firms must now be prequalified. Part of prequalification is to e-verify documents.
- 08:45, 6 June 2013 diff hist 0 N File:824 sponsor 2013.jpg current
- 08:45, 6 June 2013 diff hist -29 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Sponsor-A-Highway: official new sign
- 13:13, 5 June 2013 diff hist -153 m Category:626 Rumble Strips →626.2 Centerline Rumble Strips: Per CM, centerline rumble strips are permitted on joints. This brings guidance into compliance with Std. Plan 626.00.
- 11:04, 5 June 2013 diff hist +34 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs →Sponsor-A-Highway: photo of new sign added
- 11:03, 5 June 2013 diff hist 0 N File:824 new.jpg current
- 10:49, 5 June 2013 diff hist 0 N File:134.2.2.2 June 2013.doc current
- 10:49, 5 June 2013 diff hist +4 m Category:134 Engineering Professional Services Per Design, updated figure to change title to director from interim director
- 10:40, 5 June 2013 diff hist +342 m LPA:136.13 LPA Policy Changes Access to Prequalification Processes info expanded in EPG 136.4
- 10:37, 5 June 2013 diff hist +364 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, access to Prequalification Processes info expanded
- 10:18, 5 June 2013 diff hist -2 m LPA:136.13 LPA Policy Changes
- 10:17, 5 June 2013 diff hist +206 m LPA:136.13 LPA Policy Changes new how-to-tutorial
- 10:16, 5 June 2013 diff hist +177 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, new How-to tutorial
- 15:07, 4 June 2013 diff hist -8 m Category:110 State and Federal Wage Rates and Other Requirements →Professional Services: Per CM, further clarification
- 14:53, 4 June 2013 diff hist +151 m 903.4 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17): added links
- 14:38, 4 June 2013 diff hist -3 m LPA:136.13 LPA Policy Changes updated link
- 14:37, 4 June 2013 diff hist -3 m LPA:136.12 Figures, Glossary and Other Useful Links updated link
- 14:37, 4 June 2013 diff hist -3 m LPA:136.8 Local Public Agency Land Acquisition updated link
- 14:36, 4 June 2013 diff hist -12 m 236.6 Appraisal and Appraisal Review updated links
- 13:28, 4 June 2013 diff hist +140 m Main Page EPG 110.3
- 13:23, 4 June 2013 diff hist +838 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, clarification on how to administer contract work performed by "Professional Services".
- 13:13, 4 June 2013 diff hist +697 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarification on how to administer contract work performed by "Professional Services".
- 12:50, 4 June 2013 diff hist 0 m 751.50 Standard Detailing Notes →H4. Conduit System: minor correction
- 12:13, 4 June 2013 diff hist +307 m LPA:136.13 LPA Policy Changes Roster of Approved Contract Appraisers link updated
- 12:10, 4 June 2013 diff hist +9 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated link to Roster of Approved Contract Appraisers
- 12:09, 4 June 2013 diff hist +9 m LPA:136.12 Figures, Glossary and Other Useful Links Pe RW, updated link to Roster of Approved Contract Appraisers
- 12:08, 4 June 2013 diff hist +36 m 236.6 Appraisal and Appraisal Review updated link to Roster of Approved Contract Appraisers
- 10:36, 4 June 2013 diff hist 0 N File:Main Page June 4, 2013.jpg current
- 10:36, 4 June 2013 diff hist +72 m Main Page new photo
- 08:10, 4 June 2013 diff hist 0 N File:616.25.4 2013.jpg current
- 08:10, 4 June 2013 diff hist +1,038 m 616.25 MoDOT Work Zone Guidelines removed archaic photos
- 07:14, 4 June 2013 diff hist +203 m LPA:136.13 LPA Policy Changes Fig. 136.6.8
- 07:12, 4 June 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.8
- 07:11, 4 June 2013 diff hist 0 N File:136.6.8 2013.doc current
- 07:09, 4 June 2013 diff hist +10 m LPA:136.6 Environmental and Cultural Requirements Per Design Hist. Preservation, minor correction to Fig. 136.6.8 (Item 13 changed to Item 15 under Question 5)