User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:14, 5 May 2014 diff hist +10 m Category:235 Preliminary Plans updated divisional names
- 13:11, 5 May 2014 diff hist +41 m Category:100 GENERAL →100.1.1 MoDOT Organization: updated divisional name
- 13:08, 5 May 2014 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.2 MoDOT District and Central Office Information: updated divisional name
- 13:06, 5 May 2014 diff hist -1 m Category:101 Standard Forms updated divisional name
- 07:48, 5 May 2014 diff hist 0 N File:Main Page May 5, 2014.jpg current
- 07:48, 5 May 2014 diff hist +32 m Main Page
- 13:53, 2 May 2014 diff hist 0 N File:124 Project Reviewing Checklist.docx
- 13:53, 2 May 2014 diff hist -138 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Estimating, updated Project Reviewing Checklist
- 12:40, 2 May 2014 diff hist -74 m Main Page EPG 110.1
- 10:41, 2 May 2014 diff hist +5 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, guidance clarification
- 13:45, 1 May 2014 diff hist -1 m Main Page
- 13:16, 1 May 2014 diff hist 0 N File:702 Pile Driving Set Calculator R201305.xlsx
- 13:16, 1 May 2014 diff hist +16 m Category:702 Load-Bearing Piles Per Bridge, Pile Driving Set Calculator xlsx file was relabeled
- 13:51, 30 April 2014 diff hist 0 m Main Page
- 13:50, 30 April 2014 diff hist 0 N File:Main Page Apr 30, 2014.jpg current
- 13:50, 30 April 2014 diff hist -87 m Main Page EPG 147.3.5
- 13:43, 30 April 2014 diff hist +120 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, the RE must include a memo stating the reason for the bond review, contract ID and contact info.
- 10:20, 30 April 2014 diff hist -47 m 643.2 Local Utility Adjustments - Public and Private Per Design, updated District Final Design Checklist, Form D-12
- 10:19, 30 April 2014 diff hist -94 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Design, updated District Final Plans Checklist, Form D-12
- 10:17, 30 April 2014 diff hist 0 N File:District Final Plans Checklist D12.docx
- 10:16, 30 April 2014 diff hist -141 m 237.9 Submission of Plans and Supporting Documents Per Design, updated District Final Plans Checklist (Form D12)
- 10:04, 30 April 2014 diff hist +313 m LPA:136.13 LPA Policy Changes EPG 136.4.2.4.3.3
- 10:02, 30 April 2014 diff hist +186 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3.3 Consultant Evaluations for On-Call Services: Per LPA, clarified who signs the LPA On-Call Consultant Evaluation and what happens to it afterwards
- 09:53, 30 April 2014 diff hist +4 m 771.9 Temporary Bridge Deck Repair
- 09:09, 30 April 2014 diff hist +10 m Category:609 Paved Drainage updated link
- 08:19, 30 April 2014 diff hist -45 m 616.26 Work Zone User Training Per Traffic, updated WZ Inspection Form
- 08:17, 30 April 2014 diff hist 0 N File:WZ Inspection.docx
- 07:25, 30 April 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links
- 12:45, 29 April 2014 diff hist +78 m Category talk:806 Pollution, Erosion and Sediment Control current
- 12:28, 29 April 2014 diff hist 0 N File:702 Pile Driving Set Calculator.xlsx current
- 12:28, 29 April 2014 diff hist -36 m Category:702 Load-Bearing Piles Per Bridge, updated Pile Driving Set Calculator
- 12:05, 29 April 2014 diff hist +96 m Category:806 Pollution, Erosion and Sediment Control added link
- 08:56, 29 April 2014 diff hist +2 m Main Page
- 08:27, 29 April 2014 diff hist +179 m Main Page
- 08:25, 29 April 2014 diff hist 0 N File:Main Page 2 Apr 29, 2014.jpg current
- 08:25, 29 April 2014 diff hist 0 N File:Main Page Apr 29, 2014.jpg current
- 08:25, 29 April 2014 diff hist +284 m Main Page EPG 751.40.4.3
- 07:12, 29 April 2014 diff hist +12 m 751.50 Standard Detailing Notes →H9. Thrie Beam and Other Rail Types: Per Bridge, minor clarifications
- 07:06, 29 April 2014 diff hist +15 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: minor cosmetic adjustment
- 15:25, 28 April 2014 diff hist +10 m 751.40 LFD Widening and Repair Per Bridge, clarified EPG 751.40.4.3 guidance by replacing the text with a table
- 15:20, 28 April 2014 diff hist -5,949 m 751.40 LFD Widening and Repair Per Bridge, clarified EPG 751.40.4.3 guidance by replacing the text with a table
- 13:56, 28 April 2014 diff hist +34 m Category:900 TRAFFIC CONTROL new photo
- 13:54, 28 April 2014 diff hist 0 N File:900.jpg current
- 12:27, 28 April 2014 diff hist +155 m LPA:136.13 LPA Policy Changes Fig. 136.4.6
- 12:25, 28 April 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.6
- 12:23, 28 April 2014 diff hist 0 N File:136.4.6.docx current
- 12:23, 28 April 2014 diff hist +3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Audits and Investigations, updated Fig. 136.4.6 List of Unallowable Costs
- 12:09, 28 April 2014 diff hist 0 N File:134.3.6.1.1.docx
- 12:08, 28 April 2014 diff hist +3 m Category:134 Engineering Professional Services Per Audits and Investigations, updated Fig. 134.3.6.1.1 List of Unallowable Costs
- 12:10, 25 April 2014 diff hist -61 m Main Page EPG 147.3.5