User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:02, 20 June 2014 diff hist +14,113 m 236.7 Negotiation numerous CCO contract links updated
- 11:14, 20 June 2014 diff hist +1,820 m 236.5 Property Management updated CCO contract links
- 11:12, 20 June 2014 diff hist +2,189 m 236.4 Description Writing and Titles updated CCO contract links
- 11:07, 20 June 2014 diff hist +4,396 m 236.6 Appraisal and Appraisal Review updated numerous CCO contract links
- 10:59, 20 June 2014 diff hist +9,285 m 236.5 Property Management updated numerous contract links
- 10:41, 20 June 2014 diff hist +4,658 m 236.4 Description Writing and Titles updated numerous contract links
- 10:08, 20 June 2014 diff hist +121 m Main Page EPG 751.50
- 09:51, 20 June 2014 diff hist +1,170 m 751.50 Standard Detailing Notes →H. Superstructure Notes: Per Bridge, removed rustication requirements and revised outdated or incorrect guidance on permissible alternate barrier curb reinforcing shapes
- 12:20, 19 June 2014 diff hist -4,188 m LPA:136.3 Federal Aid Basics →136.3.18 Transportation Alternatives Program (TAP): EPG 136.3.18 deleted, since it was moved to EPG 136.3.8 in March 2014.
- 12:33, 18 June 2014 diff hist 0 m 171.6 Roadsides →171.6.4 Vegetation Management: updated link
- 12:29, 18 June 2014 diff hist +1,737 m 903.15 Signing Agreements updated links to CCO contracts
- 12:15, 18 June 2014 diff hist +159 m Category:903 Highway Signing updated CCO contract link
- 10:50, 18 June 2014 diff hist +344 m 171.1 Administration →ADM(C2) Maintenance Contracts: added link, per CM
- 10:47, 18 June 2014 diff hist -29 m 171.1 Administration updated three CCO links in ADM(B1) and ADM(B2)
- 08:41, 18 June 2014 diff hist +13 m Help Article →Division Contacts: EPG contact for CCO
- 14:45, 17 June 2014 diff hist +78 m Category:235 Preliminary Plans updated CCO links to DE10 and DE11
- 12:49, 17 June 2014 diff hist 0 m Main Page
- 10:44, 17 June 2014 diff hist 0 N File:236.6.3.3 Waiver Valuation (Form 6.3.3).docx
- 10:44, 17 June 2014 diff hist +3 m 236.6 Appraisal and Appraisal Review Per RW, updated Waiver Valuation (Form 6.3.3)
- 10:41, 17 June 2014 diff hist +48 m 236.3 Administration →236.3.3.2 Right of Way Cost Estimates: Per RW, minor clarification
- 10:06, 17 June 2014 diff hist 0 N File:Main Page June 17, 2014.jpg current
- 10:05, 17 June 2014 diff hist +376 m Main Page EPG 110.3.1, EPG 238.3.37 and EPG 748.7.3
- 08:17, 17 June 2014 diff hist 0 N File:238.3.37.12.jpg current
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.2 Value Finding Appraisal 2014.docx
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.1 Standard Appraisal 2014.docx
- 08:16, 17 June 2014 diff hist 0 N File:236.6.3.7B.docx
- 08:15, 17 June 2014 diff hist -69 m 236.6 Appraisal and Appraisal Review Per RW, updated three forms
- 08:02, 17 June 2014 diff hist -2,576 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews
- 08:02, 17 June 2014 diff hist +2,157 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews: Per CM, clarified wage rate interview requirements to meet federal requirements. Main change combines all frequency rates into one (except for JOCs, which are being added)
- 07:53, 17 June 2014 diff hist -449 m 238.3 Route Surveying →238.3.37 Bridge Survey Information: Per Bridge, updated guidance to match survey needs for geo files. Clarified subarticles' organization and added a typical valley section location sketch.
- 07:31, 17 June 2014 diff hist +1,792 m 748.7 Bridge Reports and Layouts →748.7.3 Preparation of Bridge Survey Report: Per Bridge, removed the requirement for districts to calculate drainage area for bridge surveys. Also added guidance/requirements for GEO files.
- 15:07, 16 June 2014 diff hist 0 m Main Page
- 15:05, 16 June 2014 diff hist -143 m Main Page EPG 751.50 and EPG 101
- 14:48, 16 June 2014 diff hist +553 m 751.50 Standard Detailing Notes Per Bridge, additional guidance for notes A1.2 and H1.3
- 14:40, 16 June 2014 diff hist +4 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, updated QRG Subcontracts
- 14:38, 16 June 2014 diff hist 0 N File:Subcontracts June 2014.docx
- 14:37, 16 June 2014 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Subcontracts
- 11:22, 16 June 2014 diff hist +56 m Category:110 State and Federal Wage Rates and Other Requirements added link
- 10:18, 16 June 2014 diff hist 0 N File:150.1.1.pdf
- 10:17, 16 June 2014 diff hist -11 m Category:150 Quality Management folder structure figure updated
- 10:09, 16 June 2014 diff hist 0 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail
- 10:07, 16 June 2014 diff hist +977 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per Bridge, inserted and updated links
- 08:55, 16 June 2014 diff hist 0 N File:150.1.1.jpg current
- 08:55, 16 June 2014 diff hist -3 m Category:150 Quality Management →150.1.1 Folder Structure: Per CM, updated figure of the folder structure
- 08:09, 16 June 2014 diff hist +31 m 748.4 Headwater and Backwater →748.4.1 Headwater: Per Bridge, minor clarifications
- 12:50, 13 June 2014 diff hist 0 N File:Main Page Moving Forward.jpg current
- 12:50, 13 June 2014 diff hist +504 m Main Page Moving Forward
- 12:12, 13 June 2014 diff hist 0 N File:Main Page 2 June 13, 2014.jpg current
- 12:12, 13 June 2014 diff hist 0 N File:Main Page June 13, 2014.jpg current
- 12:12, 13 June 2014 diff hist +380 m Main Page EPG 150, EPG 137.7