User contributions for Smithk
Jump to navigation
Jump to search
8 August 2014
- 10:3710:37, 8 August 2014 diff hist 0 N File:Main Page Aug 8, 2014.jpg No edit summary current
- 10:3610:36, 8 August 2014 diff hist −221 m Main Page EPG 751.5.3
- 10:0910:09, 8 August 2014 diff hist +9 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated link
- 10:0810:08, 8 August 2014 diff hist +9 m 104.7 Scoping Estimates Updated link
- 10:0610:06, 8 August 2014 diff hist +9 m Category:104 Scope Updated link
- 10:0110:01, 8 August 2014 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP link
- 09:4809:48, 8 August 2014 diff hist 0 N File:751.5.3 streams.jpg No edit summary current
- 09:4709:47, 8 August 2014 diff hist 0 N File:751.5.3 culverts.jpg No edit summary current
- 09:4709:47, 8 August 2014 diff hist +131 m 751.5 Structural Detailing Guidelines →751.5.3 Hydraulics: Per Bridge, revised flood data tables and guidance to match revisions in other articles to be consistent with practical design.
- 08:2808:28, 8 August 2014 diff hist +263 m LPA:136.13 LPA Policy Changes EPG 136.11.20
- 08:1708:17, 8 August 2014 diff hist +181 m LPA:136.11 Local Public Agency Construction →136.11.20 Project Closeout Certifications: Per LPA, project closeout certifications are now to be electronically received 60 days of the Final Inspection date.
- 07:1207:12, 8 August 2014 diff hist +304 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.3
- 07:0907:09, 8 August 2014 diff hist +273 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.3 Bid Guaranty (49 CFR 18.36): Per LPA, clarified the guidance about the bid guarantee amount so as to not burden the contractor with high bid bonds. Dollar amounts are not to be used.
7 August 2014
- 15:0815:08, 7 August 2014 diff hist −60 m Main Page EPG 622
- 14:5414:54, 7 August 2014 diff hist +227 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2.1 Construction Inspection for Diamond Grinding of Existing Portland Cement Concrete Pavement (Sec 622.30): Per CM, added a sixth precaution involving dispersal of diamond grinding residue
- 14:4414:44, 7 August 2014 diff hist −25 m 903.9 General Service Signs (MUTCD Chapter 2I) →903.10.6 Missouri Welcome Center Affiliates: updated link
- 14:4214:42, 7 August 2014 diff hist +92 m 903.18 Signing for School Areas →Table 903.19.1 School Area Sign and Plaque Sizes
- 14:4114:41, 7 August 2014 diff hist −12 m 903.18 Signing for School Areas →Table 903.19.1 School Area Sign and Plaque Sizes
- 14:4114:41, 7 August 2014 diff hist +35 m 903.18 Signing for School Areas updated links
- 14:3814:38, 7 August 2014 diff hist +4 m 903.18 Memorial Signs →903.15.4 Drunk Driving Victim Program: Per Traffic, updated sign dimensions
- 14:3514:35, 7 August 2014 diff hist +8 m 903.4 Guide Signs—Conventional Roads (MUTCD Chapter 2D) →Table 903.7.51 Approved National Scenic Byways: Per Traffic, updated links
- 14:3114:31, 7 August 2014 diff hist −10 m 903.2 Regulatory Signs and Barricades (MUTCD Chapter 2B) Per Traffic, numerous corrections and updates
- 14:2114:21, 7 August 2014 diff hist −165 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) Per Traffic, numerous minor corrections and updates
- 12:4812:48, 7 August 2014 diff hist +2 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 12:4712:47, 7 August 2014 diff hist +385 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Contract Services, updated PoDI List
- 07:1207:12, 7 August 2014 diff hist +171 m LPA:136.13 LPA Policy Changes Per RW, updated Roster of Approved Contract Negotiators
- 07:0907:09, 7 August 2014 diff hist +38 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Roster of Approved Contract Negotiators
- 07:0707:07, 7 August 2014 diff hist +77 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
6 August 2014
- 13:5413:54, 6 August 2014 diff hist −1 m LPA:136.7 Design →136.7.2.9 Public Interest Findings
- 13:2413:24, 6 August 2014 diff hist +163 m LPA:136.13 LPA Policy Changes EPG 136.7.2.9
- 13:2213:22, 6 August 2014 diff hist 0 N File:136.7.2.9 sample letter.docx No edit summary
- 13:2113:21, 6 August 2014 diff hist −56 m LPA:136.7 Design Per Innovation Engineer, updated sample letter
- 09:2309:23, 6 August 2014 diff hist +42 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per Bridge, clarification of the rectangular laminated elastomeric pad's uplift check
- 08:4808:48, 6 August 2014 diff hist −109 m Main Page EPG 236.5.14
- 08:4408:44, 6 August 2014 diff hist +491 m 236.5 Property Management →236.5.14 Release of Temporary Easements and Retention Clauses: added link
- 08:4108:41, 6 August 2014 diff hist +174 m 236.5 Property Management →236.5.14 Release of Temporary Easements and Retention Clauses: Per RW, a new method to release the temp easement or retention clause
- 07:2007:20, 6 August 2014 diff hist +428 m Category:100 GENERAL Per Design, added MHTC backup format guidance
5 August 2014
- 09:5809:58, 5 August 2014 diff hist −176 m Main Page EPG 642
4 August 2014
- 12:2412:24, 4 August 2014 diff hist +461 m 642.8 Sidewalk Design Criteria →642.1.1 Sidewalk Location and Width: Per Non-motorized Transpn. Engr., clarification of existing sidewalk policy
- 12:1712:17, 4 August 2014 diff hist +326 m Category:642 Pedestrian Facilities →Maintenance Responsibility: Per Non-motorized Transpn. Engr., clarification of existing policy
- 11:3211:32, 4 August 2014 diff hist −6 m Main Page No edit summary
- 11:3111:31, 4 August 2014 diff hist 0 N File:Main Page Aug 4, 2014.jpg No edit summary current
- 11:2911:29, 4 August 2014 diff hist 0 N File:Line Item Adjustments 2014.docx No edit summary
- 11:2911:29, 4 August 2014 diff hist 0 N File:Emergency Contacts 2014.docx No edit summary
- 11:2811:28, 4 August 2014 diff hist 0 N File:Media-Emergency Contacts 2014.docx No edit summary
- 11:2811:28, 4 August 2014 diff hist +455 m Main Page EPG 101
- 10:4410:44, 4 August 2014 diff hist +34 m 903.5 Guide Signs - Freeways and Expressways (MUTCD Chapter 2E) →903.8.2 Freeway and Expressway Signing Principles (MUTCD Section 2E.02): added photo
- 10:4310:43, 4 August 2014 diff hist 0 N File:903.8.2.jpg No edit summary current
- 10:3210:32, 4 August 2014 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, the list of line item adjustment types updated in Line Item Adjustments QRG & Emergency Contacts QRG was updated to include alternate report location
1 August 2014
- 12:4212:42, 1 August 2014 diff hist 0 N File:902.5.8.4.6.xls No edit summary current