User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:07, 12 May 2015 diff hist -2,965 m 643.1 Utilities - Status Letter Per Brandi Baldwin, DUE, updating info on "no utility impact" projects and removed detail of liability acceptance, as requested by CCO. Directing to CCO policy instead.
- 09:01, 12 May 2015 diff hist -13 m Category:Safe and Sound →Roadway Job Special Provisions (JSPs): updated JSP link
- 08:57, 12 May 2015 diff hist +183 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.3 Proposed Utility Adjustment Plans: updated JSP link
- 08:54, 12 May 2015 diff hist +183 m Category:704 Concrete Masonry Repair →704.2 Materials Inspection for Sec 704: updated JSP link
- 08:53, 12 May 2015 diff hist -14 m Category:910 Intelligent Transportation Systems updated JSP link
- 08:51, 12 May 2015 diff hist +184 m 320.2 Release of Subsurface Information →320.2.1.1 General: updated JSP link current
- 08:49, 12 May 2015 diff hist +138 m LPA:136.7 Design →136.7.5.1 Additive Alternates: updated JSP link
- 08:45, 12 May 2015 diff hist +183 m Category:1066 Mortars and Grout →1066.1 Procedure: updated link
- 08:43, 12 May 2015 diff hist +183 m Category:822 Roadside Vegetation Management →Design Aspects of Mowing: Updated link
- 08:42, 12 May 2015 diff hist +366 m Category:625 Slab Stabilization Updated JSP links
- 08:40, 12 May 2015 diff hist +368 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Updated JSP links
- 08:35, 12 May 2015 diff hist -16 m 237.9 Submission of Plans and Supporting Documents →237.9.6.4 Electronic JSP Review and Submittal Process, Roadway: updated JSP link
- 08:33, 12 May 2015 diff hist -11 m 237.9 Submission of Plans and Supporting Documents →237.9.6.2 PS&E Submittal: updated JSP link
- 08:27, 12 May 2015 diff hist +175 m Category:405 Processing Reclaimed Asphalt →405.3 Two Inch HIR (Use JSP-08-05): Updated JSP link
- 08:23, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.1 Coldmilling Existing Ashaltic Concrete Pavement: Updated JSP link
- 08:21, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2 Diamond Grinding Existing Portland Cement Concrete Pavement: Updated JSP link
- 08:13, 12 May 2015 diff hist -11 m 237.8 Contract Time Updated JSP link
- 07:59, 12 May 2015 diff hist -18 Category:Safe and Sound →Roadway Job Special Provisions (JSP’s)
- 07:58, 12 May 2015 diff hist -1 Category:Safe and Sound →Contracting Issues
- 07:55, 12 May 2015 diff hist -6 m 147.2 Add Alternate Bidding
- 07:49, 12 May 2015 diff hist +329 m LPA:136.13 LPA Policy Changes EPG 136.7.3.1.2
- 07:44, 12 May 2015 diff hist -185 m LPA:136.7 Design →136.7.3.1.2 Job Special Provisions: Several links updated to the new SharePoint link for JSPs
- 07:27, 12 May 2015 diff hist -139 m Main Page Change Code QRG
- 07:21, 12 May 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, clarified "Change Order Codes" QRG to to better describe which reason code should be used in any situation
- 07:21, 12 May 2015 diff hist 0 N File:Change Order Codes 2015.doc current
- 07:20, 12 May 2015 diff hist 0 m Category:109 Measurement and Payment Per CM, clarified "Change Order Codes" QRG to to better describe which reason code should be used in any situation
- 10:15, 11 May 2015 diff hist +36 m Main Page EPG 616.13
- 10:12, 11 May 2015 diff hist 0 N File:616.13 WZ Impact.xlsx current
- 10:12, 11 May 2015 diff hist +3 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Traffic, updated the WZ Impact Analysis spreadsheet
- 08:59, 11 May 2015 diff hist +4 m Main Page
- 07:33, 11 May 2015 diff hist 0 N File:Main Page May 11, 2015.jpg current
- 07:33, 11 May 2015 diff hist -62 m Main Page
- 15:12, 7 May 2015 diff hist 0 m Main Page
- 14:43, 7 May 2015 diff hist +18 m Main Page
- 11:08, 7 May 2015 diff hist -62 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way →140.1 Right of Way Encroachments, Maintenance Policy RDS(D1): removed link
- 08:57, 7 May 2015 diff hist -9 m 616.20 Flagger Training →Clothing: updated link
- 08:55, 7 May 2015 diff hist +20 Category:132 Safety Updated poster links
- 08:48, 7 May 2015 diff hist -9 m 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) →616.4.3 Worker Safety Considerations: Per Traffic, updated PPE link
- 08:47, 7 May 2015 diff hist -18 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.2 High-Visibility Safety Apparel (MUTCD 6E.02): Per Traffic, updated PPE link
- 08:45, 7 May 2015 diff hist -9 m 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) →616.4.3 Worker Safety Considerations: Per Traffic, updated PPE link
- 15:16, 5 May 2015 diff hist 0 N File:Main Page May 5, 2015.jpg current
- 15:16, 5 May 2015 diff hist +472 m Main Page
- 14:29, 5 May 2015 diff hist 0 N File:616.22.1 2015.docx
- 14:28, 5 May 2015 diff hist +10 m 616.22 Advanced Work Zone Training Per Traffic, updated Project Level Trained Person in Traffic Management Plan and Safety document
- 10:21, 5 May 2015 diff hist +1 m 234.2 Diamond Interchanges →234.2.1.4 Auxiliary Lanes for Acceleration and Deceleration (Parallel Type): minor correction
- 08:28, 4 May 2015 diff hist -13 m Category:903 Highway Signing Per Traffic, updated TODS and Logos link
- 08:05, 4 May 2015 diff hist +316 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 08:00, 4 May 2015 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.4.1
- 07:59, 4 May 2015 diff hist 0 N File:Fig. 136.4.1 May 2015.docx
- 07:58, 4 May 2015 diff hist +24 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, good faith effort requirements of #7 under Attachment E was modified. Engineer must now submit Good Faith Efforts documentation illustrating reasonable efforts to obtain DBE participation