User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:07, 16 June 2015 diff hist 0 N File:749 IDF NE.docx current
- 12:06, 16 June 2015 diff hist 0 N File:749 IDF NW.docx current
- 12:05, 16 June 2015 diff hist +1 m Category:749 Hydrologic Analysis →749.5.2.4 Composite Runoff Coefficients
- 12:04, 16 June 2015 diff hist +3,934 m Category:749 Hydrologic Analysis Per BR, updated USGS Regression Equations and IDF Curves; procedure added for determining stream flows at confluences.
- 08:15, 15 June 2015 diff hist -126 m 751.6 General Quantities Per BR, removed several links
- 15:04, 12 June 2015 diff hist -332 m Main Page EPG 750.7
- 14:22, 12 June 2015 diff hist -380 m 751.6 General Quantities Per BR, removed two archaic pay items
- 13:58, 12 June 2015 diff hist -167 m Main Page EPG Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)
- 13:54, 12 June 2015 diff hist +1,779 m Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST) Per LPA and AM, updated to current practice current
- 13:33, 12 June 2015 diff hist -2,853 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: Per LPA, Small Material Quantity Acceptance Table removed. Current info available at EPG Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling & Testing
- 13:29, 12 June 2015 diff hist +387 m LPA:136.13 LPA Policy Changes EPG 136.11.17.1
- 13:16, 12 June 2015 diff hist +266 m 750.7 Non-Hydraulic Considerations →750.7.4.5 Guardrail Attachment: Per CM, new guidance for an updated pay item.
- 12:39, 12 June 2015 diff hist +587 m LPA:136.13 LPA Policy Changes EPG 136.4
- 12:35, 12 June 2015 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 135.4.1
- 12:35, 12 June 2015 diff hist 0 N File:Fig. 136.4.1 June 2015.docx
- 12:34, 12 June 2015 diff hist +525 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, guidance & Fig. 136.4.1 updated; engineer must submit Good Faith Efforts document'n for all agreements >$50,000. Engineer must also document Good Faith Efforts made if agreed % is < % stated
- 15:14, 11 June 2015 diff hist 0 m Main Page
- 14:02, 11 June 2015 diff hist 0 N File:233.2 eval.pdf current
- 14:01, 11 June 2015 diff hist +113 m 233.2 At-Grade Intersections with Stop and Yield Control Per Traffic, added research document
- 13:56, 11 June 2015 diff hist 0 N File:234.6 Safety Eval.pdf current
- 13:56, 11 June 2015 diff hist +106 m 234.6 Diverging Diamond Interchanges Per Traffic, added research document
- 07:53, 11 June 2015 diff hist +82 m Main Page
- 07:51, 11 June 2015 diff hist -78 m Main Page EPG 907.3
- 07:47, 11 June 2015 diff hist +1,199 m 907.3 Travel Safe Zones Per Traffic, clarified and expanded guidance to better explain where and why TSZs are needed
- 13:56, 10 June 2015 diff hist +21 m Main Page
- 13:52, 10 June 2015 diff hist -509 m Main Page EPG 771, EPG 131.2.2.1
- 13:32, 10 June 2015 diff hist -398 m 771.18 In-Deck Bridge Deck Crack Filler Per MT and BR, info moved and retitled to reflect current practice
- 13:30, 10 June 2015 diff hist 0 m 771.18 In-Deck Bridge Deck Crack Filler 771.17 Bridge Deck Total Surface Treatment - In Deck moved to 771.18 In-Deck Bridge Deck Crack Filler: Per MT and BR, info moved and retitled to reflect current practice
- 13:30, 10 June 2015 diff hist +53 N 771.17 Bridge Deck Total Surface Treatment - In Deck 771.17 Bridge Deck Total Surface Treatment - In Deck moved to 771.18 In-Deck Bridge Deck Crack Filler: Per MT and BR, info moved and retitled to reflect current practice current
- 13:26, 10 June 2015 diff hist 0 N File:771.17 LVP.docx
- 13:26, 10 June 2015 diff hist +246 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) New LVP bridge deck crack filler info, per MT and BR
- 13:25, 10 June 2015 diff hist +73 N 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler
- 13:25, 10 June 2015 diff hist 0 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler moved to 771.17 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler
- 13:24, 10 June 2015 diff hist 0 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) 771.16 Bridge Deck Crack Pouring moved to 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler: Archaic EPG 771.16 Bridge Deck Crack Pouring replaced with EPG 771.17 LVP Bridge Deck Crack Filler
- 13:24, 10 June 2015 diff hist +73 N 771.16 Bridge Deck Crack Pouring 771.16 Bridge Deck Crack Pouring moved to 771.18 Low Viscosity Polymer (LVP) Bridge Deck Crack Filler: Archaic EPG 771.16 Bridge Deck Crack Pouring replaced with EPG 771.17 LVP Bridge Deck Crack Filler
- 13:18, 10 June 2015 diff hist +1,203 Nm 771.15 Concrete Bridge Deck Sealer Selection Matrix New article from MT and BR; old EPG 771.15 Chip Seal to Entire Deck moved to EPG 771.19 Chip Seal to Entire Deck
- 13:15, 10 June 2015 diff hist +2,258 m 771.16 Penetrating Concrete Sealer - Silane New silane info, per MT and BR
- 13:14, 10 June 2015 diff hist 0 m 771.16 Penetrating Concrete Sealer - Silane 771.18 Linseed Oil Treatment to Entire Deck moved to 771.16 Penetrating Concrete Sealer - Silane: Linseed Oil info was archaic. New Silage guidance, per MT and BR.
- 13:14, 10 June 2015 diff hist +57 N 771.18 Linseed Oil Treatment to Entire Deck 771.18 Linseed Oil Treatment to Entire Deck moved to 771.16 Penetrating Concrete Sealer - Silane: Linseed Oil info was archaic. New Silage guidance, per MT and BR. current
- 13:12, 10 June 2015 diff hist 0 m 771.21 Rainy Day Bridge Activities
- 13:12, 10 June 2015 diff hist 0 m 771.21 Rainy Day Bridge Activities 771.20 Rainy Day Bridge Activities moved to 771.21 Rainy Day Bridge Activities: re-numbered, per BR and MT
- 13:12, 10 June 2015 diff hist +48 N 771.20 Rainy Day Bridge Activities 771.20 Rainy Day Bridge Activities moved to 771.21 Rainy Day Bridge Activities: re-numbered, per BR and MT current
- 13:12, 10 June 2015 diff hist 0 m 771.20 Cut and Spray Brush and Vines
- 13:11, 10 June 2015 diff hist 0 m 771.20 Cut and Spray Brush and Vines 771.19 Cut and Spray Brush and Vines moved to 771.20 Cut and Spray Brush and Vines: re-numbered, per BR and MT
- 13:11, 10 June 2015 diff hist +50 N 771.19 Cut and Spray Brush and Vines 771.19 Cut and Spray Brush and Vines moved to 771.20 Cut and Spray Brush and Vines: re-numbered, per BR and MT current
- 13:10, 10 June 2015 diff hist 0 m 771.19 Chip Seal to Entire Deck
- 13:10, 10 June 2015 diff hist 0 m 771.19 Chip Seal to Entire Deck 771.15 Chip Seal to Entire Deck moved to 771.19 Chip Seal to Entire Deck: re-numbered, per BR and MT
- 13:10, 10 June 2015 diff hist +45 N 771.15 Chip Seal to Entire Deck 771.15 Chip Seal to Entire Deck moved to 771.19 Chip Seal to Entire Deck: re-numbered, per BR and MT current
- 08:51, 10 June 2015 diff hist +116 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way →140.3 Guidelines for Installation of Banners on Lighting Poles: Per TR and MT, added photo of Growing Together banner
- 08:48, 10 June 2015 diff hist 0 N File:140.3.jpg current