User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:09, 26 June 2015 diff hist +127 m Main Page EPG 409
- 12:49, 26 June 2015 diff hist 0 N File:409 JSP FY16.doc current
- 12:49, 26 June 2015 diff hist 0 N File:409 FY2016 Contract Seal Coat Guidelines.docx
- 12:48, 26 June 2015 diff hist +451 m Category:409 Seal Coat Per Est. and Review, updated the CLC guidelines and the Seal Coat JSP package. Provided contractor flexibility and increased potential usage of seal coats.
- 09:07, 25 June 2015 diff hist +63 m Main Page EPG 606.1
- 08:58, 25 June 2015 diff hist +2 m 606.1 Guardrail →606.1.3.1 3R/4R Projects
- 08:55, 25 June 2015 diff hist +83 m 606.1 Guardrail →606.1.3.1 3R/4R Projects
- 08:53, 25 June 2015 diff hist +387 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Per EPG, some situations will not allow adjustment to 29" & an adjusted height of 27 3/4" is acceptable. This revision clarifies this acceptable practice.
- 07:01, 25 June 2015 diff hist +9 m Main Page
- 13:44, 24 June 2015 diff hist -37 m 751.50 Standard Detailing Notes →I1. General: Per Bridge, clarification of I1.52
- 12:08, 24 June 2015 diff hist 0 N File:Main Page June 24, 2015.jpg current
- 12:08, 24 June 2015 diff hist -207 m Main Page
- 11:04, 24 June 2015 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, minor clarification
- 14:41, 23 June 2015 diff hist 0 m Main Page
- 09:06, 23 June 2015 diff hist +5 m 237.7 Equipment and Materials List updated link
- 15:13, 22 June 2015 diff hist +222 Other Aspects of Pavement Design →Minor Roads: two new designs of bridge approach slabs were implemented. The new designs reduce construction costs while maintaining current performance
- 14:39, 22 June 2015 diff hist +250 m Main Page Bridge approach slab
- 14:29, 22 June 2015 diff hist +678 Category:806 Pollution, Erosion and Sediment Control →Permanent Diversions: Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 14:29, 22 June 2015 diff hist -290 751.50 Standard Detailing Notes Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 13:57, 22 June 2015 diff hist +2,305 751.1 Preliminary Design Per BR, revised preliminary design guidance for new bridge approach slabs and bridge end drainage.
- 13:31, 22 June 2015 diff hist +6,221 748.7 Bridge Deck and Bridge End Drainage Per BR, revised article to include guidance for bridge end drainage
- 13:29, 22 June 2015 diff hist 0 m 748.7 Bridge Deck and Bridge End Drainage 748.7 Bridge Deck Drainage moved to 748.7 Bridge Deck and Bridge End Drainage: BR revised article to include guidance for bridge end drainage
- 13:29, 22 June 2015 diff hist +55 N 748.7 Bridge Deck Drainage 748.7 Bridge Deck Drainage moved to 748.7 Bridge Deck and Bridge End Drainage: BR revised article to include guidance for bridge end drainage current
- 13:27, 22 June 2015 diff hist +195 m 611.1 Rock Blanket →611.1.1 Design: Per Bridge, clarification for uses of rock blankets at bridge ends
- 13:23, 22 June 2015 diff hist +3,456 Category:503 Bridge Approach Slabs Per Bridge, implementation of two new designs of bridge approach slabs. The new designs reduce construction costs while maintaining current performance
- 11:13, 22 June 2015 diff hist 0 N File:Main Page 3 June 22, 2015.jpg current
- 11:12, 22 June 2015 diff hist 0 N File:Main Page 2 June 22, 2015.jpg current
- 11:12, 22 June 2015 diff hist +10 m Main Page
- 11:12, 22 June 2015 diff hist 0 N File:Main Page June 22, 2015.jpg current
- 11:11, 22 June 2015 diff hist -18 m Main Page EPG 751.22.3.13
- 08:55, 22 June 2015 diff hist -1,239 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, guidance brought into compliance with standard drawings. Duplicate drawings removed.
- 08:09, 22 June 2015 diff hist +107 m LPA:136.13 LPA Policy Changes Fig. 136.11.13
- 08:08, 22 June 2015 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.11.13
- 08:07, 22 June 2015 diff hist -1 m LPA:136.11 Local Public Agency Construction Per LPA, updated job bulletin board checklist
- 12:17, 19 June 2015 diff hist +29 m Main Page EPG 152
- 10:45, 19 June 2015 diff hist +53 m Category:105 Control of Work →105.15 Acceptance (Sec 105.15): added link to new EPG 152
- 10:42, 19 June 2015 diff hist +53 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: added link to new EPG 152
- 10:38, 19 June 2015 diff hist +99 m 103.2 Contract Bond for Sec 103.4 added link to new EPG 152
- 10:35, 19 June 2015 diff hist +98 m Category:108 Prosecution and Progress →108.12 Notice to Contractor and Surety
- 10:33, 19 June 2015 diff hist +53 m Category:108 Prosecution and Progress →108.16.1 Critical Dates: added link to EPG 152
- 10:31, 19 June 2015 diff hist +77 m Category:100 GENERAL New article, EPG 152
- 10:30, 19 June 2015 diff hist +5,817 Nm Category:152 Contactor Bonding Responsibilities Per CM, new article provides info previously missing in the EPG. New guidance is about bid, performance & payment bonds & how surety companies are involved with these bonds on road & bridge contracts.
- 10:01, 19 June 2015 diff hist 0 m LPA:136.13 LPA Policy Changes
- 10:00, 19 June 2015 diff hist +245 m LPA:136.13 LPA Policy Changes EPG 136.3 links
- 09:56, 19 June 2015 diff hist +181 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Updated EPG 136.3 links to contracts
- 09:49, 19 June 2015 diff hist 0 N File:136.3.28 2015.docx
- 09:48, 19 June 2015 diff hist 0 N File:136.3.15 2015.docx
- 09:48, 19 June 2015 diff hist 0 N File:136.3.14 2015.docx
- 09:48, 19 June 2015 diff hist 0 N File:136.3.13 2015.docx
- 09:48, 19 June 2015 diff hist 0 N File:136.3.12 2015.docx