User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:12, 23 July 2015 diff hist 0 N File:616.14 WZ Questions.docx
- 13:11, 23 July 2015 diff hist +556 m 616.14 Work Zone Safety and Mobility Policy Per Design, a list has been produced to aid PMs and the core team to develope the WZ JSP and to identify early on the WZ impacts with the entire core team; "Work Zone Questions for the Core Team".
- 15:20, 22 July 2015 diff hist +134 m Main Page EPG 403, EPG 502
- 15:02, 22 July 2015 diff hist +73 m Category:403 Asphaltic Concrete Pavement →403.1 Construction Inspection for Sec 403: added links
- 14:56, 22 July 2015 diff hist -2,310 m Category:502 Portland Cement Concrete Base and Pavement →502.1.8 Surface Test (Sec 502.8): Per CM, revised guidance about PCC and Superpave concerning smoothness to bring into compliance with Sec 610.
- 14:53, 22 July 2015 diff hist -83 m Category:403 Asphaltic Concrete Pavement →403.1 Construction Inspection for Sec 403: Per CM, revised guidance about PCC and Superpave concerning smoothness to bring into compliance with Sec 610.
- 14:52, 20 July 2015 diff hist +1 m Main Page
- 09:46, 20 July 2015 diff hist +401 m 907.7 Highway Safety Manual Per TS, several clarifications
- 13:26, 17 July 2015 diff hist -393 m Main Page
- 13:14, 17 July 2015 diff hist -212 m Help Article →EPG Ballot Cycles: Revised ballot cycle dates
- 12:18, 16 July 2015 diff hist +163 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 12:17, 16 July 2015 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 12:16, 16 July 2015 diff hist 0 N File:136.9.3 July 2015.doc
- 12:16, 16 July 2015 diff hist +35 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.3 was updated with a new link to the Affidavit of Compliance in Section 10.
- 11:36, 16 July 2015 diff hist +378 m LPA:136.13 LPA Policy Changes EPG 136.3.13
- 11:26, 16 July 2015 diff hist +170 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, updated link to CCO's SharePoint site
- 11:25, 16 July 2015 diff hist +251 m LPA:136.3 Federal Aid Basics →136.3.13 Agreements: Per LPA, updated link to CCO's SharePoint site and added two EPG article links
- 11:07, 16 July 2015 diff hist 0 N File:Main Page July 16, 2015.jpg current
- 11:07, 16 July 2015 diff hist +7 m Main Page
- 07:19, 16 July 2015 diff hist +52 m 236.7 Negotiation Updated Property Owner Opinion Survey link
- 14:18, 15 July 2015 diff hist 0 m 751.50 Standard Detailing Notes →E1. Excavation and Fill: Per BR, changed "20 feet" to "25 feet" in E1.4
- 12:35, 15 July 2015 diff hist +5 m Main Page Property Owner Opinion Survey form
- 12:34, 15 July 2015 diff hist 0 N File:236.7 Opinion Survey 2015.docx
- 12:34, 15 July 2015 diff hist +5 m 236.7 Negotiation Per RW, updated Property Owner Opinion Survey form
- 11:24, 15 July 2015 diff hist -1,755 m Category:616 Temporary Traffic Control Per TS, removed "2009 MUTCD Compliance" subarticle since its annoucemment of the 2009 MUTCD compliance changes has been sufficient.
- 10:55, 15 July 2015 diff hist -145 m Main Page EPG 236.7
- 10:43, 15 July 2015 diff hist 0 N File:236.7 Opinion Survey.docx
- 10:43, 15 July 2015 diff hist +70 m 236.7 Negotiation Per RW, new form, Property Owner Opinion Survey
- 08:49, 15 July 2015 diff hist 0 N File:Main Page July 15, 2015.jpg current
- 08:49, 15 July 2015 diff hist +64 m Main Page
- 08:29, 15 July 2015 diff hist -133 m Main Page EPG 907.6
- 08:04, 15 July 2015 diff hist -374 m Category:907 Traffic Safety EPG 907.6 deleted, per TS. Fatal crash reviews are now an optional regional council process.
- 08:02, 15 July 2015 diff hist -5,385 m 907.6 Fatal Crash Reviews Per TS, EPG 907.6 info deleted. Fatal crash reviews will become a regional council process.
- 13:32, 13 July 2015 diff hist 0 m Main Page
- 13:56, 10 July 2015 diff hist -2 m Main Page
- 09:17, 9 July 2015 diff hist +109 m Main Page EPG 751.10, EPG 751.14
- 09:14, 9 July 2015 diff hist +80 m 751.10 General Superstructure →751.10.2.1 Precast Prestressed (P/C P/S) Concrete Panel Forms - Design: added link
- 09:10, 9 July 2015 diff hist +3,872 m 751.14 Steel Superstructure →751.14.4 Composite Design: Per BR, added guidance and details about making steel girders and beams composite.
- 08:38, 9 July 2015 diff hist +138 m 751.10 General Superstructure →751.10.2 Stay-in-Place Bridge Deck Forms: Per BR, added guidance to accommodate making steel girders and beams composite.
- 07:51, 9 July 2015 diff hist +74 m Main Page EPG 806
- 07:48, 9 July 2015 diff hist +691 m Category:806 Pollution, Erosion and Sediment Control →Temporary Stream Crossing ( Sec. 806.100): Per Environmental, updated guidance to bring it into compliance with Sec 303.2
- 14:40, 8 July 2015 diff hist +51 m 751.13 Expansion Joint Systems →751.13.4.3 Joint System Details (Steel Structures): Per BR, note text added for asterisk in the diagram
- 13:36, 8 July 2015 diff hist -156 m Main Page EPG 620
- 13:28, 8 July 2015 diff hist -10 m 620.1 General (MUTCD Chapter 3A) →620.1.7 Permanent Pavement Markings
- 13:27, 8 July 2015 diff hist 0 N File:620.1.7.jpg current
- 13:27, 8 July 2015 diff hist +35 m 620.1 General (MUTCD Chapter 3A) →620.1.7 Permanent Pavement Markings: Per TS, helpful photos added to text
- 13:24, 8 July 2015 diff hist 0 N File:620 decision.jpg current
- 13:24, 8 July 2015 diff hist +42 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per TS, added decision tree figure
- 13:07, 8 July 2015 diff hist +178 m Category:620 Pavement Marking →Pavement Marking Guidelines: Per TS, clarification of paint types available to contractors
- 09:28, 8 July 2015 diff hist +22 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values: Per BR, note #1 clarified