User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:36, 2 September 2015 diff hist 0 m Main Page
- 15:11, 1 September 2015 diff hist +4 m Main Page
- 14:29, 1 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval Per TP, Joplin Metro Planning Org now has a 2-year TIP cycle
- 14:24, 1 September 2015 diff hist -117 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, removed link to outdated Practitioner's Guide
- 11:21, 1 September 2015 diff hist 0 N File:110.3.1 wage interview SP Sept 2015.pdf
- 11:21, 1 September 2015 diff hist 0 N File:110.3.1 wage interview Sept 2015.pdf
- 11:21, 1 September 2015 diff hist +97 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, Wage Interview form updated to have date for the Inspector to indicate when the interview was performed, clarified the Reviewer date on the form, and added a date for any action taken.
- 10:34, 31 August 2015 diff hist 0 N File:Main Page Aug 31, 2015.jpg current
- 10:34, 31 August 2015 diff hist -456 m Main Page
- 14:41, 28 August 2015 diff hist +121 m Main Page EPG 751.50, EPG 751.14
- 08:28, 28 August 2015 diff hist -303 m 751.50 Standard Detailing Notes →A4. Protective Coatings: Per BR, renumbered 751.50 A4 Series of Protective Coating Notes
- 07:49, 28 August 2015 diff hist +1,455 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per BR, revised to conform to Sec 1081, clarifying when to use System I.
- 07:11, 28 August 2015 diff hist -700 m 236.7 Negotiation Per RW, updated link to Partial Deeds of Release, RW25
- 15:14, 27 August 2015 diff hist 0 N File:Main Page 2 Aug 27, 2015.jpg current
- 15:14, 27 August 2015 diff hist 0 N File:Main Page Aug 27, 2015.jpg current
- 15:12, 27 August 2015 diff hist -527 m Main Page EPG Othere Aspects of Pavement Design
- 14:46, 27 August 2015 diff hist +22 m Other Aspects of Pavement Design →Purpose of Alternate and Optional Pavement Bidding: Per Est and Review, guidance was clarified to indicate the minimal thickness of pavement must be 7" for a LCCA to be applied
- 14:45, 25 August 2015 diff hist +40 m Main Page EPG 129.4
- 14:43, 25 August 2015 diff hist -634 m Category:129 Public Involvement →129.4 Coordination with other Agencies: Per CR and Design, guidance was clarified about the list of agencies with whom to coordinate the environmental process
- 14:35, 25 August 2015 diff hist 0 m Main Page
- 11:24, 25 August 2015 diff hist -36 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance Updated 40 CFR 110 links
- 11:20, 25 August 2015 diff hist -61 m 237.8 Contract Time →237.8.1 Calendar Days vs. Completion Dates: updated link
- 11:17, 25 August 2015 diff hist 0 m 606.2 Guard Cable →606.2.4.3 Post Spacing: minor correction
- 09:40, 25 August 2015 diff hist -34 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per AI, clarification about compliance with 2 CFR 200
- 08:58, 25 August 2015 diff hist -49 m Main Page EPG 105.15
- 08:55, 25 August 2015 diff hist +117 m Category:105 Control of Work →105.15 Acceptance (Sec 105.15): Per CM, clarified contractor's surety info since contractor surety has not been necessary for some time.
- 07:37, 25 August 2015 diff hist +36 m Help Article →How to Easily Select and Print an Entire Article or a Portion of an Article
- 07:36, 25 August 2015 diff hist -1 m Help Article →How to Easily Select and Print an Entire Article or a Portion of an Article
- 07:15, 25 August 2015 diff hist 0 m Help Article →How to Easily Select and Print an Entire Article or a Portion of an Article
- 07:13, 25 August 2015 diff hist 0 N File:Help Article Print 4.jpg current
- 07:13, 25 August 2015 diff hist 0 N File:Help Article Print 3.jpg current
- 07:12, 25 August 2015 diff hist 0 N File:Help Article Print 2.jpg current
- 07:12, 25 August 2015 diff hist 0 N File:Help Article Print 1.jpg current
- 07:12, 25 August 2015 diff hist +634 m Help Article →How best to view the articles: Added helpful info, "How to Easily Select and Print an Entire Article or a Portion of an Article"
- 10:58, 24 August 2015 diff hist 0 m Main Page
- 10:57, 24 August 2015 diff hist +61 m Main Page
- 10:55, 24 August 2015 diff hist 0 N File:Main Page 2 Aug 24, 2015.jpg current
- 10:55, 24 August 2015 diff hist 0 N File:Main Page Aug 24, 2015.jpg current
- 10:54, 24 August 2015 diff hist +186 m Main Page EPG 127.29
- 10:16, 24 August 2015 diff hist +465 m 127.29 Stormwater →127.29.5 MCM 3: Illicit Discharge Detection and Elimination: Per LPA, added link to Illicit Discharge Detection and Elimination Fact Sheet
- 13:34, 21 August 2015 diff hist 0 m Main Page
- 07:19, 21 August 2015 diff hist +19 m LPA:136.13 LPA Policy Changes
- 07:19, 21 August 2015 diff hist -1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant
- 07:18, 21 August 2015 diff hist +318 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 07:15, 21 August 2015 diff hist +68 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, eliminated vagueness about the necessity for local puclic agency to submit review forms and comments about rating firms.
- 06:59, 21 August 2015 diff hist +456 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Design, updated PoDI list link
- 14:34, 20 August 2015 diff hist +1 m Main Page
- 10:38, 20 August 2015 diff hist +391 m LPA:136.13 LPA Policy Changes EPG 136.3
- 10:35, 20 August 2015 diff hist +16 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated three contracts
- 10:33, 20 August 2015 diff hist 0 N File:136.3.21 2015.pdf