User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:55, 28 June 2016 diff hist 0 N File:Main Page June 28, 2016.jpg current
- 10:55, 28 June 2016 diff hist -190 m Main Page EPG 751.9, EPG 450.9, EPG 751.1.3.4
- 10:30, 28 June 2016 diff hist 0 N File:Fig. 616.13.jpg current
- 10:30, 28 June 2016 diff hist 0 N File:616.13 Traffic Segment.pdf current
- 10:30, 28 June 2016 diff hist -20 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Segment Hourly Volume instructions and Fig. 616.13 (to show a current version of the TSHV application)
- 08:29, 28 June 2016 diff hist -8 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Per DE, updated outdated reference to a JSP in the text. The JSP is not in the General Provisions
- 08:20, 28 June 2016 diff hist +209 m 751.1 Preliminary Design →751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts: Per BR, clarified guidance that bridge rails on single lane bridges may be used in place if grade is not raised.
- 07:21, 28 June 2016 diff hist -2 m 751.9 Bridge Seismic Design →751.9.2.4.1 Soil Properties
- 07:21, 28 June 2016 diff hist -8,157 m 751.9 Bridge Seismic Design →Table 751.9.2.4.1 Soil Property Correlations: Per BR, removed outdated Table 751.9.2.4.1 Soil Property Correlations
- 14:45, 27 June 2016 diff hist 0 m Main Page
- 08:44, 24 June 2016 diff hist 0 m Main Page
- 10:59, 23 June 2016 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 10:58, 23 June 2016 diff hist +417 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, guidance clarified to indicate that subcontracts require FHWA Form 1273
- 14:39, 22 June 2016 diff hist 0 m Main Page
- 08:23, 22 June 2016 diff hist 0 N File:751.10.1.7.2 2016.jpg current
- 08:23, 22 June 2016 diff hist +26 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth Precast Prestressed Panel Bridge Deck Slabs Using SIP P/C P/S Panel Forms: Per BR, Clarification of clearance
- 08:07, 22 June 2016 diff hist +29 m Main Page EPG 751.37, EPG 751.37
- 07:41, 22 June 2016 diff hist +120 m 751.50 Standard Detailing Notes →G1. Concrete Bents: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
- 07:39, 22 June 2016 diff hist +521 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
- 07:34, 22 June 2016 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 07:33, 22 June 2016 diff hist 0 N File:751.31.3.2 stagger 2016.jpg current
- 07:33, 22 June 2016 diff hist +191 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
- 12:59, 21 June 2016 diff hist +1 m Main Page
- 10:34, 21 June 2016 diff hist +96 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, clarified fuel adjustment guidance pertaining to pay items in 4 categories
- 09:15, 21 June 2016 diff hist -216 m 616.18 Construction Inspection Guidelines for Sec 616 removed archaic links
- 09:01, 21 June 2016 diff hist 0 N File:134.5.2 2016.docx
- 09:01, 21 June 2016 diff hist 0 N File:134.4.1 June 2016.docx current
- 09:01, 21 June 2016 diff hist 0 N File:134.2.2.5.7 2016.docx current
- 09:01, 21 June 2016 diff hist 0 N File:134.2.2.5.6 2016.docx current
- 09:01, 21 June 2016 diff hist 0 N File:134.2.2.5.4 June 2016.doc current
- 09:00, 21 June 2016 diff hist 0 N File:134.2.2.5.3 June 2016.docx current
- 09:00, 21 June 2016 diff hist 0 N File:134.2.2.2 June 2016.doc current
- 09:00, 21 June 2016 diff hist -35 m Category:134 Engineering Professional Services Per DE, updated numerous forms
- 07:32, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 13 to 15.pdf
- 07:32, 21 June 2016 diff hist +1 m 104.7 Scoping Estimates
- 07:29, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 11 to 13.pdf
- 07:29, 21 June 2016 diff hist +75 m 104.7 Scoping Estimates Per TP, added historical eng'g factors report for 2013-2015
- 07:27, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 12 to 14.pdf
- 07:26, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 10 to 12.pdf
- 07:26, 21 June 2016 diff hist -102 m 104.7 Scoping Estimates Per TP, updated link to historic reports
- 13:34, 20 June 2016 diff hist 0 m 751.1 Preliminary Design →751.1.2.29 Protection of Spill Slopes and Side Slopes: correction of spelling
- 12:17, 20 June 2016 diff hist +5 m Category:101 Standard Forms Per Bridge, updated Request for Final Soundings for Structures Form at the request of Geotechnical
- 12:16, 20 June 2016 diff hist 0 N File:751.1.2.19 Guidance June 2016.xlsx
- 12:16, 20 June 2016 diff hist 0 N File:751.1.2.19 Request June 2016.xlsx
- 12:15, 20 June 2016 diff hist +20 m 751.1 Preliminary Design Per Bridge, updated both Request for Final Soundings for Structures Form and the Guidance for Request for Final Soundings of Structures at the request of Geotechnical
- 10:11, 20 June 2016 diff hist +152 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.2 Procedure: Per CM, inserted links
- 09:53, 20 June 2016 diff hist +1 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection
- 09:52, 20 June 2016 diff hist -11 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection
- 09:51, 20 June 2016 diff hist +43 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection
- 09:50, 20 June 2016 diff hist -36 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection