User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:19, 12 January 2017 diff hist -94 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Contracts, updated D-12
- 16:08, 11 January 2017 diff hist +87 m Main Page EPG 171.2.4
- 15:48, 11 January 2017 diff hist +293 m 171.2 Buildings and Grounds →B&G(D2) Weigh Station Obligations: Per MT, changed maintenance responsibilities for weigh stations because of new MOU with MSHP current
- 13:52, 10 January 2017 diff hist -752 m 153.5 Bridge Per BR, BR14 is no longer a standard agreement. Updated BR10's title and description when it is to be used
- 15:36, 6 January 2017 diff hist -469 m Main Page
- 13:53, 5 January 2017 diff hist 0 m Main Page
- 11:57, 5 January 2017 diff hist 0 m 751.13 Expansion Joint Systems
- 09:52, 5 January 2017 diff hist +94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 links
- 09:50, 5 January 2017 diff hist +94 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 09:25, 5 January 2017 diff hist +350 m LPA:136.13 LPA Policy Changes EPG 136.4.1.5
- 09:21, 5 January 2017 diff hist +247 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.5 Consultant Qualification: Per LPA, a firm is not required to submit a cert. of auth. to become prequalified when it does work outside the jurisdiction of the MO Board for APEPLSPLA.
- 09:15, 5 January 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, minor clarification
- 14:59, 4 January 2017 diff hist +296 m LPA:136.13 LPA Policy Changes EPG 136.6.4.8
- 14:55, 4 January 2017 diff hist +1,221 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.8 Stormwater and Erosion Control: Per LPA, minor revisions based on new stormwater permit
- 12:21, 4 January 2017 diff hist +94 m Main Page EPG 134.1.3
- 12:16, 4 January 2017 diff hist +221 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, a firm is not required to submit a cert. of auth. to become prequalified when it does work outside the jurisdiction of the MO Board for APEPLSPLA.
- 11:58, 4 January 2017 diff hist -164 m Main Page EPG 756
- 11:54, 4 January 2017 diff hist +473 m Category:756 Seismic Design Per BR, revised the Bridge seismic design process flowchart.
- 09:21, 3 January 2017 diff hist +50 m 153.23 Utility
- 09:20, 3 January 2017 diff hist +50 m 153.22 Transportation Planning
- 09:20, 3 January 2017 diff hist +50 m 153.21 Traffic
- 09:19, 3 January 2017 diff hist +50 m 153.20 Right of Way
- 09:19, 3 January 2017 diff hist +50 m 153.19 Multimodal
- 09:19, 3 January 2017 diff hist +50 m 153.18 Motor Carrier Services
- 09:18, 3 January 2017 diff hist +50 m 153.17 Medical Board Employee Benefits
- 09:18, 3 January 2017 diff hist +50 m 153.16 Maintenance
- 09:18, 3 January 2017 diff hist +50 m 153.15 Information Systems
- 09:17, 3 January 2017 diff hist +50 m 153.14 Human Resources
- 09:17, 3 January 2017 diff hist +50 m 153.13 Highway Safety
- 09:16, 3 January 2017 diff hist +50 m 153.12 General Services
- 09:16, 3 January 2017 diff hist +50 m 153.11 Financial Services
- 09:16, 3 January 2017 diff hist +50 m 153.10 Design – Escrow
- 09:15, 3 January 2017 diff hist +50 m 153.9 Design
- 09:15, 3 January 2017 diff hist +50 m 153.8 Customer Relations
- 09:15, 3 January 2017 diff hist +50 m 153.7 Construction and Materials
- 09:14, 3 January 2017 diff hist +50 m 153.5 Bridge
- 08:37, 3 January 2017 diff hist 0 m Main Page
- 08:13, 3 January 2017 diff hist +18 m 236.8 Relocation Assistance Program updated link
- 14:12, 30 December 2016 diff hist -42 m 147.3 Job Order Contracting (JOC) updated Bidding and Contract contact info
- 12:05, 30 December 2016 diff hist +134 m Category:101 Standard Forms updated survey form links
- 11:57, 30 December 2016 diff hist +126 m 238.2 Land Surveying updated link to Form 238.2.17, 238.2.18.2
- 11:53, 30 December 2016 diff hist +126 m 238.1 Aerial Mapping and LiDAR Surveys updated link for Figs 238.1.3, 238.1 Survey Code,
- 11:26, 30 December 2016 diff hist +100 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated PODI links
- 11:15, 30 December 2016 diff hist +28 m Category:101 Standard Forms →Contracts: updated district award link
- 10:50, 30 December 2016 diff hist +3 m 643.2 Local Utility Adjustments - Public and Private →643.2.13.4 Betterment: updated DE11 link
- 10:49, 30 December 2016 diff hist +12 m Category:235 Preliminary Plans updated DE11 link
- 10:46, 30 December 2016 diff hist +37 m Category:101 Standard Forms updated link
- 10:38, 30 December 2016 diff hist +47 m Category:101 Standard Forms updated link
- 10:37, 30 December 2016 diff hist +47 m 643.2 Local Utility Adjustments - Public and Private updated link
- 10:36, 30 December 2016 diff hist +106 m 103.1 Bid Opening and Award Process updated link