User contributions
Jump to navigation
Jump to search
- 08:25, 2 June 2017 diff hist +2 m Main Page EPG 103.1
- 08:23, 2 June 2017 diff hist -449 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
- 07:12, 2 June 2017 diff hist -7 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to MoDOT Workforce JSP Cumulative Workforce Hours Report
- 13:42, 1 June 2017 diff hist -51 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: updated link
- 13:20, 1 June 2017 diff hist +2 m Main Page
- 10:23, 1 June 2017 diff hist +8 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:44, 31 May 2017 diff hist +13 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per LPA, clarified Landscape Architects as "Professional Landscape Architects".
- 09:58, 31 May 2017 diff hist +4 m Category:101 Standard Forms →Construction and Materials
- 09:53, 31 May 2017 diff hist -466 m Category:108 Prosecution and Progress
- 09:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 09:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
- 15:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 15:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 13:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf current
- 13:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 12:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 12:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 11:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
- 14:29, 26 May 2017 diff hist -526 m Category:240 Maintenance and Emergency Crossovers
- 14:52, 25 May 2017 diff hist 0 m Main Page
- 13:33, 25 May 2017 diff hist +10 m Main Page
- 08:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes
- 08:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 08:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx
- 08:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page 2 May 22, 2017.jpg current
- 14:31, 22 May 2017 diff hist 0 N File:Main Page May 22, 2017.jpg current
- 14:30, 22 May 2017 diff hist +45 m Main Page
- 10:14, 22 May 2017 diff hist +307 m 153.9 Design Per DE, revised who need to review several agreements
- 14:59, 19 May 2017 diff hist 0 N File:Main Page May 19, 2017.jpg current
- 14:59, 19 May 2017 diff hist -424 m Main Page EPG 751
- 13:45, 19 May 2017 diff hist +126 m 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:35, 19 May 2017 diff hist 0 N File:751.39 2017.jpg current
- 13:34, 19 May 2017 diff hist -144 m 751.39 Pile Footings Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:28, 19 May 2017 diff hist +3 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.5 Wing & Detached Wing Walls
- 13:27, 19 May 2017 diff hist 0 N File:751.35.3.5 detached wing 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.5 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 N File:751.35.3.4 May 2017.jpg current
- 13:26, 19 May 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent
- 13:25, 19 May 2017 diff hist 0 N File:751.35.3.3 May 2017.jpg current
- 13:25, 19 May 2017 diff hist +136 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3 Dimensions: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 13:09, 19 May 2017 diff hist +2 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 safety barrier.jpg current
- 13:06, 19 May 2017 diff hist 0 N File:751.34.3.2 part section.jpg current
- 13:05, 19 May 2017 diff hist 0 N File:751.34.3.2.jpg current
- 13:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 13:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg current
- 13:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg current